7523-7525 S DENROCK AVE 90045

Certificate Information: 7523-7525 S DENROCK AVE 90045

Application / Permit
21016-20000-13091
Plan Check / Job No.
B21VN06256
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT (E) ATTACHED 20' 2" X 20' DEN TO ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(A). ALL WORK DONE PER STRUCTURAL ENGINEERING.
Permit Issued
Issued on 11/29/2021
Issuing Office
Valley
Current Status
CofO Issued on 7/6/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/1/2021 APPLICANT
Assigned to Plan Check Engineer 6/3/2021 GURUNATH NESARAJAH
Corrections Issued 6/4/2021 GURUNATH NESARAJAH
Plan Check Approved 10/19/2021 GURUNATH NESARAJAH
Building Plans Picked Up 10/22/2021 APPLICANT
Issued 11/29/2021 APPLICANT
CofO in Progress 6/21/2022 BOBBY KEY
Permit Finaled 7/6/2022 DANIEL ORRANTE
CofO Issued 7/6/2022 DANIEL ORRANTE
Permit Finaled 7/6/2022 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 8/23/2021 ANTHONY MAINEZ
Sewer availability Cleared 8/23/2021 ANTHONY MAINEZ
ZI Cleared 8/24/2021 DANG NGUYEN
Specific Plan Cleared 8/26/2021 PETE EYRE
Grading Pre-Inspection Cleared 8/30/2021 VASIL MIHALEV
Eng Process Fee Ord 176,300 Cleared 9/20/2021 ANTHONY MAINEZ

Contact Information

Contractor Azure Construction Inc; Lic. No.: 1058246-B 3877 GRAND VIEW BLVD STE 200      LOS ANGELES, CA 90066
Engineer Dominguez,, Refugio; Lic. No.: C50820 254 COTTONWOOD ST      ONTARIO, CA 91761

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 12/14/2021 Corrections Issued BOBBY KEY
ELECTRICAL-Rough 12/22/2021 Approved BOBBY KEY
Final 12/22/2021 Corrections Issued BOBBY KEY
PLUMBING-Rough 12/22/2021 Approved BOBBY KEY
Gas Test 1/12/2022 Approved BOBBY KEY
Insulation 1/12/2022 Approved BOBBY KEY
Excavation/Setback/Form/Re-Bar 1/24/2022 Conditional Approval BOBBY KEY
MERV13>=Rough 1/24/2022 Approved BOBBY KEY
Excavation/Setback/Form/Re-Bar 2/4/2022 Approved BOBBY KEY
Footing/Foundation/Slab 2/4/2022 Approved BOBBY KEY
Insulation 2/4/2022 Corrections Issued BOBBY KEY
Insulation 2/11/2022 Approved BOBBY KEY
BUILDING-Rough-Frame 2/16/2022 Conditional Approval BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 2/16/2022 Approved BOBBY KEY
Green Building Rough 2/16/2022 Approved BOBBY KEY
HVAC-Rough 2/16/2022 Approved BOBBY KEY
BUILDING-Rough-Frame 2/24/2022 Approved BOBBY KEY
Drywall Nailing 2/24/2022 Approved BOBBY KEY
Final 2/24/2022 Corrections Issued BOBBY KEY
Interior/Exterior Lathing 2/24/2022 Partial Approval BOBBY KEY
Shower Pan 3/3/2022 Approved CLAYTON GRAHAM
Green Building Rough 3/22/2022 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 3/22/2022 SGSOV Not Ready BOBBY KEY
Interior/Exterior Lathing 4/6/2022 Approved RYAN SALAZAR
ELECTRICAL-Final 6/9/2022 Approved BOBBY KEY
Green Building Final 6/9/2022 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 6/9/2022 SGSOV Approved BOBBY KEY
Smoke Detectors 6/9/2022 Approved BOBBY KEY
Final 6/13/2022 Corrections Issued BOBBY KEY
Gas Test 6/13/2022 Approved BOBBY KEY
HVAC-Final 6/13/2022 Approved BOBBY KEY
PLUMBING-Final 6/13/2022 Approved BOBBY KEY
Final 6/21/2022 OK to Issue CofO BOBBY KEY