2827 &-2829 N HURON ST 90065

Certificate Information: 2827 &-2829 N HURON ST 90065

Application / Permit
21016-20000-11072
Plan Check / Job No.
B21VN05264
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
REMODEL TO (E) DUPLEX. 2829 HURON: EXPAND (E) BED.RM , RECONFIGURING (E) BATH AND WASHER DRYERREPLACE WINDOW, INSTALL (N) DRYWALL IN INTERIOR WALL. 2827 HURON: CREATE A STUDY ROOM, RELOCATE THE ENTIRE KITCHECN AND ADD (N) BATHROOM, REPLACE WINDOE, INSTALL (N) DRYWALL IN INTERIOR WALL. NO ADDITION SF ARA IS BEING ADDED. ALL WORK PER ENGINEER.
Permit Issued
Issued on 7/1/2021
Issuing Office
Current Status
Permit Finaled on 1/31/2023

Permit Application Status History

Submitted 5/28/2021 APPLICANT
Assigned to Plan Check Engineer 6/1/2021 PARISA ZAHABI
Corrections Issued 6/1/2021 PARISA ZAHABI
Plan Check Approved 7/1/2021 PARISA ZAHABI
Issued 7/1/2021 APPLICANT
Building Plans Picked Up 7/1/2021 APPLICANT
Permit Finaled 1/30/2023 OSVALDO PARAMO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Apel Construction Inc; Lic. No.: 1051980-B 644 NORTH FULLER AVE 454      LOS ANGELES, CA 90036
Engineer Kim,, Hosang; Lic. No.: C67288 18759 WILLOWTREE LANE      PORTER RANCH, CA 91326

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 8/23/2021 Approved OSVALDO PARAMO
Wood Frame 8/31/2021 Corrections Issued OSVALDO PARAMO
Wood Frame 9/22/2021 Not Ready for Inspection CRAIG DAVIS
Wood Frame 9/24/2021 Corrections Issued OSVALDO PARAMO
Interior/Exterior Lathing 12/2/2021 Partial Approval OSVALDO PARAMO
Wood Frame 12/2/2021 Approved OSVALDO PARAMO
Drywall Nailing 12/16/2021 Approved OSVALDO PARAMO
Insulation 2/11/2022 Approved OSVALDO PARAMO
Final 8/1/2022 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 8/1/2022 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 8/1/2022 Not Ready for Inspection OSVALDO PARAMO
Final 8/22/2022 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 8/22/2022 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 8/22/2022 Not Ready for Inspection OSVALDO PARAMO
Final 1/10/2023 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 1/10/2023 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 1/10/2023 Not Ready for Inspection OSVALDO PARAMO
Final 1/20/2023 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 1/20/2023 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 1/20/2023 No Access for Inspection OSVALDO PARAMO
Final 1/25/2023 Partial Inspection ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 1/25/2023 SGSOV Approved ALIZAH MAYAGOITIA
Smoke Detectors 1/25/2023 Approved ALIZAH MAYAGOITIA
Final 1/30/2023 Permit Finaled OSVALDO PARAMO