2827 &-2829 N HURON ST 90065
Certificate Information: 2827 &-2829 N HURON ST 90065
- Application / Permit
- 21016-20000-11072
- Plan Check / Job No.
- B21VN05264
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- REMODEL TO (E) DUPLEX. 2829 HURON: EXPAND (E) BED.RM , RECONFIGURING (E) BATH AND WASHER DRYERREPLACE WINDOW, INSTALL (N) DRYWALL IN INTERIOR WALL. 2827 HURON: CREATE A STUDY ROOM, RELOCATE THE ENTIRE KITCHECN AND ADD (N) BATHROOM, REPLACE WINDOE, INSTALL (N) DRYWALL IN INTERIOR WALL. NO ADDITION SF ARA IS BEING ADDED. ALL WORK PER ENGINEER.
- Permit Issued
- Issued on 7/1/2021
- Issuing Office
- Current Status
- Permit Finaled on 1/31/2023
Permit Application Status History
| Submitted | 5/28/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 6/1/2021 | PARISA ZAHABI |
| Corrections Issued | 6/1/2021 | PARISA ZAHABI |
| Plan Check Approved | 7/1/2021 | PARISA ZAHABI |
| Issued | 7/1/2021 | APPLICANT |
| Building Plans Picked Up | 7/1/2021 | APPLICANT |
| Permit Finaled | 1/30/2023 | OSVALDO PARAMO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Apel Construction Inc; Lic. No.: 1051980-B | 644 NORTH FULLER AVE 454 LOS ANGELES, CA 90036 |
| Engineer | Kim,, Hosang; Lic. No.: C67288 | 18759 WILLOWTREE LANE PORTER RANCH, CA 91326 |
Inspector Information
| OSVALDO PARAMO, (213) 202-9854 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 8/23/2021 | Approved | OSVALDO PARAMO |
| Wood Frame | 8/31/2021 | Corrections Issued | OSVALDO PARAMO |
| Wood Frame | 9/22/2021 | Not Ready for Inspection | CRAIG DAVIS |
| Wood Frame | 9/24/2021 | Corrections Issued | OSVALDO PARAMO |
| Interior/Exterior Lathing | 12/2/2021 | Partial Approval | OSVALDO PARAMO |
| Wood Frame | 12/2/2021 | Approved | OSVALDO PARAMO |
| Drywall Nailing | 12/16/2021 | Approved | OSVALDO PARAMO |
| Insulation | 2/11/2022 | Approved | OSVALDO PARAMO |
| Final | 8/1/2022 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 8/1/2022 | SGSOV Not Ready | OSVALDO PARAMO |
| Smoke Detectors | 8/1/2022 | Not Ready for Inspection | OSVALDO PARAMO |
| Final | 8/22/2022 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 8/22/2022 | SGSOV Not Ready | OSVALDO PARAMO |
| Smoke Detectors | 8/22/2022 | Not Ready for Inspection | OSVALDO PARAMO |
| Final | 1/10/2023 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 1/10/2023 | SGSOV Not Ready | OSVALDO PARAMO |
| Smoke Detectors | 1/10/2023 | Not Ready for Inspection | OSVALDO PARAMO |
| Final | 1/20/2023 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 1/20/2023 | SGSOV Not Ready | OSVALDO PARAMO |
| Smoke Detectors | 1/20/2023 | No Access for Inspection | OSVALDO PARAMO |
| Final | 1/25/2023 | Partial Inspection | ALIZAH MAYAGOITIA |
| SGSOV-Seismic Gas S/O Valve | 1/25/2023 | SGSOV Approved | ALIZAH MAYAGOITIA |
| Smoke Detectors | 1/25/2023 | Approved | ALIZAH MAYAGOITIA |
| Final | 1/30/2023 | Permit Finaled | OSVALDO PARAMO |