2465 S BUTLER AVE 90064

Certificate Information: 2465 S BUTLER AVE 90064

Application / Permit
21016-20000-09133
Plan Check / Job No.
B21VN04321
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT 18'-4" X 20'-4" (E) DETACHED GARAGE INTO A (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 10/20/2021
Issuing Office
Current Status
CofO Issued on 11/30/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/12/2021 APPLICANT
Assigned to Plan Check Engineer 4/15/2021 RAPHAEL ROSAS
Corrections Issued 4/15/2021 RAPHAEL ROSAS
Applicant returned to address corrections 7/23/2021 RAPHAEL ROSAS
Issued 10/20/2021 APPLICANT
Building Plans Picked Up 10/20/2021 APPLICANT
CofO in Progress 11/21/2022 ASHLEY THOMPSON
Permit Finaled 11/30/2022 DANIEL ORRANTE
CofO Issued 11/30/2022 DANIEL ORRANTE
Permit Finaled 11/30/2022 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 5/7/2021 DINAH GARIN
Sewer availability Cleared 5/7/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 5/11/2021 DINAH GARIN

Contact Information

Contractor Zaven Construction Inc; Lic. No.: 1078839-B 943 CAMBRIDGE DRIVE      BURBANK, CA 91504
Engineer Adzhemyan,, Arsen; Lic. No.: C89103 1010 RALEIGH ST APT 107      GLENDALE, CA 91205

Inspector Information

ANTHONY EGSON, (310) 914-3893 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/19/2021 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 12/7/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Inspection 12/10/2021 Partial Approval OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 12/17/2021 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 12/17/2021 Approved OGANES TARAKHCHYAN
Underground Mechanical 1/3/2022 Approved OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 3/21/2022 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 3/25/2022 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 3/31/2022 Corrections Issued OGANES TARAKHCHYAN
HVAC-Rough 3/31/2022 Approved OGANES TARAKHCHYAN
MERV13>=Rough 3/31/2022 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 3/31/2022 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Rough 4/4/2022 Approved OGANES TARAKHCHYAN
PLUMBING-Rough 4/5/2022 Approved OGANES TARAKHCHYAN
BUILDING-Rough-Frame 4/20/2022 Approved JUAN VALENZUELA
Green Building Rough 4/20/2022 Approved JUAN VALENZUELA
Interior/Exterior Lathing 4/20/2022 Partial Approval JUAN VALENZUELA
Insulation 4/26/2022 Approved CLAYTON GRAHAM
Drywall Nailing 5/9/2022 Approved OGANES TARAKHCHYAN
Gas Test 5/13/2022 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 5/18/2022 Approved KENNETH NAGLE
ELECTRICAL-Final 6/17/2022 Corrections Issued JOHNNY MIRANDA
ELECTRICAL-Final 6/24/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Green Building Final 6/24/2022 Approved OGANES TARAKHCHYAN
MERV13>=Final 6/24/2022 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 6/24/2022 SGSOV Not Ready OGANES TARAKHCHYAN
Smoke Detectors 6/24/2022 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Final 7/1/2022 Not Ready for Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 8/1/2022 SGSOV Approved JOHN KIDWELL
Smoke Detectors 8/1/2022 Approved JOHN KIDWELL
ELECTRICAL-Final 8/4/2022 Approved JOHN KIDWELL
HVAC-Final 8/4/2022 Approved JOHN KIDWELL
PLUMBING-Final 8/4/2022 Approved JOHN KIDWELL
Final 11/21/2022 Conditional Approval ASHLEY THOMPSON