Pre-Inspection
|
3/31/2022
|
Approved
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
4/12/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Insulation
|
4/18/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
4/18/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
4/19/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Rough
|
4/19/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Insulation
|
4/19/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
4/19/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
4/19/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
METHANE-Final
|
4/19/2022
|
Approved
|
TIMOTHY BUXTON
|
|
METHANE-Rough
|
4/19/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Reinforced Concrete Frame
|
4/19/2022
|
Approved
|
TIMOTHY BUXTON
|
|
SGSOV-Seismic Gas S/O Valve
|
4/19/2022
|
SGSOV No Gas
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
4/19/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
4/20/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
4/20/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
4/22/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
T-Bar Ceiling
|
4/27/2022
|
Corrections Issued
|
TIMOTHY BUXTON
|
|
Insulation
|
5/6/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
5/6/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Light Gage Steel Frame
|
5/6/2022
|
Partial Approval
|
EDWIN GREGORYONA
|
|
T-Bar Ceiling
|
5/6/2022
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Green Building Final
|
5/12/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
5/12/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
5/12/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
5/12/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
5/20/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
Interior/Exterior Lathing
|
5/20/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Light Gage Steel Frame
|
5/20/2022
|
Partial Approval
|
SORIN CIRSTOIU
|
|
T-Bar Ceiling
|
5/20/2022
|
Partial Inspection
|
SORIN CIRSTOIU
|
|
Final
|
6/2/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
6/2/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
6/2/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Insulation
|
6/3/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
6/3/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
6/6/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Final
|
6/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
6/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Insulation
|
6/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
6/10/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
6/10/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Drywall Nailing
|
6/21/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
6/21/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
6/21/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
6/21/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
6/29/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
6/30/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
6/30/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
6/30/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
7/7/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
7/7/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
7/7/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Drywall Nailing
|
7/11/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
7/11/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
8/11/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
8/11/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
8/11/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Drywall Nailing
|
8/17/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
8/19/2022
|
No Access for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
9/2/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
9/8/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
9/8/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
9/8/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
9/15/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
9/15/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
9/15/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
9/16/2022
|
No Access for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
9/16/2022
|
No Access for Inspection
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
9/20/2022
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
9/21/2022
|
Approved
|
TIMOTHY BUXTON
|
|
Final
|
9/22/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
9/22/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
9/22/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
9/28/2022
|
Conditional Approval
|
BRUCE CAMPBELL
|
|
Insulation
|
9/30/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
9/30/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
10/5/2022
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
10/6/2022
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Final
|
10/11/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Green Building Final
|
10/11/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
10/11/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Smoke Detectors
|
10/11/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
10/12/2022
|
Partial Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/14/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Light Gage Steel Frame
|
10/14/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Interior/Exterior Lathing
|
10/18/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
10/19/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Final
|
10/21/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
10/21/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
10/21/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Insulation
|
10/27/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
10/27/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
10/28/2022
|
Partial Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
11/1/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
11/3/2022
|
Partial Approval
|
MARK FERRARI
|
|
Interior/Exterior Lathing
|
11/3/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
Light Gage Steel Frame
|
11/3/2022
|
Partial Approval
|
MARK FERRARI
|
|
Final
|
11/4/2022
|
Partial Inspection
|
TIMOTHY BUXTON
|
|
Green Building Final
|
11/4/2022
|
Not Ready for Inspection
|
TIMOTHY BUXTON
|
|
Smoke Detectors
|
11/4/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
Insulation
|
11/10/2022
|
Partial Inspection
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
11/10/2022
|
Partial Inspection
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
11/14/2022
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Drywall Nailing
|
11/15/2022
|
Partial Inspection
|
ALAN MORELOS
|
|
Interior/Exterior Lathing
|
11/15/2022
|
Partial Inspection
|
ALAN MORELOS
|
|
Drywall Nailing
|
11/29/2022
|
Partial Approval
|
MARK FERRARI
|
|
Special/Order Compliance
|
11/29/2022
|
Not Ready for Inspection
|
MARK FERRARI
|
|
T-Bar Ceiling
|
12/1/2022
|
Partial Approval
|
TIMOTHY BUXTON
|
|
T-Bar Ceiling
|
12/6/2022
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
1/11/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Special/Order Compliance
|
1/11/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
1/12/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
1/12/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Special/Order Compliance
|
1/12/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
1/18/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
1/18/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
1/18/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Special/Order Compliance
|
1/18/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
1/19/2023
|
Partial Approval
|
RAFAEL CORTES
|
|
Final
|
1/20/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Green Building Final
|
1/20/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Smoke Detectors
|
1/20/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
1/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
1/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
1/27/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
1/27/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
1/27/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
1/30/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Final
|
2/3/2023
|
Corrections Issued
|
KATY RAMIREZ
|
|
Green Building Final
|
2/3/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Smoke Detectors
|
2/3/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/9/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
2/13/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
2/15/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
2/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Light Gage Steel Frame
|
2/23/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/24/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
2/28/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
3/2/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
3/3/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
3/3/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
3/7/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
3/7/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
3/23/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
3/30/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Insulation
|
4/6/2023
|
Not Ready for Inspection
|
ALAN MORELOS
|
|
Interior/Exterior Lathing
|
4/6/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
4/6/2023
|
Partial Approval
|
ALAN MORELOS
|
|
Light Gage Steel Frame
|
4/20/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
4/21/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
5/4/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Deputy Reinf. Concrete
|
5/4/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Insulation
|
5/4/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
5/4/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
5/8/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
5/8/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Insulation
|
5/9/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
5/9/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Insulation
|
5/11/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
5/11/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Insulation
|
5/15/2023
|
Partial Inspection
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
5/15/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
5/15/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Insulation
|
5/16/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
5/16/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Excavation/Setback/Form/Re-Bar
|
5/18/2023
|
Conditional Approval
|
JULIAN CAPUCETTI
|
|
Insulation
|
5/18/2023
|
Partial Inspection
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
5/18/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Insulation
|
5/19/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
5/19/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Deputy Reinf. Concrete
|
5/22/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Final
|
5/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Green Building Final
|
5/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
5/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
5/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Smoke Detectors
|
5/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Insulation
|
6/1/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Interior/Exterior Lathing
|
6/1/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
6/1/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Final
|
6/9/2023
|
No Access for Inspection
|
KATY RAMIREZ
|
|
Insulation
|
6/20/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
6/20/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
6/21/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
6/23/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Insulation
|
6/23/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
6/23/2023
|
Corrections Issued
|
KATY RAMIREZ
|
|
Insulation
|
6/26/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
6/26/2023
|
Approved
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
6/30/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Insulation
|
7/3/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
7/3/2023
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Insulation
|
7/6/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Interior/Exterior Lathing
|
7/6/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
7/6/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Deputy Reinf. Concrete
|
7/10/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Insulation
|
7/11/2023
|
Approved
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
7/11/2023
|
Conditional Approval
|
JULIAN CAPUCETTI
|
|
Interior/Exterior Lathing
|
7/17/2023
|
Not Ready for Inspection
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
7/17/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Interior/Exterior Lathing
|
7/18/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
8/2/2023
|
Conditional Approval
|
JULIAN CAPUCETTI
|
|
Insulation
|
8/3/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Deputy Reinf. Concrete
|
8/4/2023
|
Conditional Approval
|
JULIAN CAPUCETTI
|
|
Interior/Exterior Lathing
|
8/7/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Interior/Exterior Lathing
|
8/9/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Deputy Drilled-In Anchors
|
8/10/2023
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
8/11/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
8/11/2023
|
Partial Approval
|
JULIAN CAPUCETTI
|
|
Deputy Drilled-In Anchors
|
8/17/2023
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Deputy Reinf. Concrete
|
8/17/2023
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
8/17/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
8/17/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Deputy Reinf. Concrete
|
8/18/2023
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
8/18/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
8/23/2023
|
Not Ready for Inspection
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
8/23/2023
|
Conditional Approval
|
JULIAN CAPUCETTI
|
|
Special/Order Compliance
|
8/23/2023
|
Not Ready for Inspection
|
JULIAN CAPUCETTI
|
|
Light Gage Steel Frame
|
8/24/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
8/25/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
8/25/2023
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Deputy Drilled-In Anchors
|
8/30/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
8/30/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
8/30/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
9/5/2023
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
9/6/2023
|
Partial Approval
|
VAHE KELEDJIAN
|
|
Light Gage Steel Frame
|
9/8/2023
|
Partial Approval
|
VAHE KELEDJIAN
|
|
Light Gage Steel Frame
|
9/18/2023
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/22/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
9/26/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
9/27/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
9/29/2023
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
10/4/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
10/4/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
10/5/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Insulation
|
10/12/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
10/12/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
10/12/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
10/17/2023
|
Partial Approval
|
RICARDO ROBLES
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
RAMAZANALI ALMASI
|
|
Final
|
10/23/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Green Building Final
|
10/23/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Smoke Detectors
|
10/23/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Deputy Reinf. Concrete
|
10/24/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
10/27/2023
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
10/30/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
11/1/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
11/2/2023
|
Not Ready for Inspection
|
RICARDO ROBLES
|
|
Drywall Nailing
|
11/7/2023
|
Partial Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
11/7/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
11/8/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
11/9/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
11/16/2023
|
Partial Inspection
|
JEROME BLACKWOOD
|
|
Deputy Drilled-In Anchors
|
11/29/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
11/30/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Deputy Reinf. Concrete
|
12/1/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/1/2023
|
Corrections Issued
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/4/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/7/2023
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Deputy Drilled-In Anchors
|
12/8/2023
|
Conditional Approval
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
12/8/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
12/11/2023
|
Corrections Issued
|
KATY RAMIREZ
|
|
Insulation
|
12/19/2023
|
Partial Approval
|
KATY RAMIREZ
|
|
T-Bar Ceiling
|
12/19/2023
|
Corrections Issued
|
KATY RAMIREZ
|
|
Drywall Nailing
|
12/28/2023
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Insulation
|
12/28/2023
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
T-Bar Ceiling
|
12/28/2023
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
Deputy Drilled-In Anchors
|
1/2/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/10/2024
|
Conditional Approval
|
RICARDO ROBLES
|
|
Footing/Foundation/Slab
|
1/10/2024
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Interior/Exterior Lathing
|
1/10/2024
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Footing/Foundation/Slab
|
1/11/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Light Gage Steel Frame
|
1/11/2024
|
Partial Approval
|
RICARDO ROBLES
|
|
Footing/Foundation/Slab
|
1/25/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Special/Order Compliance
|
1/26/2024
|
Partial Inspection
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
1/30/2024
|
Partial Approval
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
1/31/2024
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Light Gage Steel Frame
|
2/9/2024
|
Partial Approval
|
KATY RAMIREZ
|
|
T-Bar Ceiling
|
2/9/2024
|
Not Ready for Inspection
|
KATY RAMIREZ
|
|
Excavation/Setback/Form/Re-Bar
|
2/13/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Footing/Foundation/Slab
|
2/13/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
2/13/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Excavation/Setback/Form/Re-Bar
|
2/14/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Footing/Foundation/Slab
|
2/14/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Light Gage Steel Frame
|
2/14/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Excavation/Setback/Form/Re-Bar
|
2/16/2024
|
Not Ready for Inspection
|
RICARDO ROBLES
|
|
Insulation
|
2/20/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
T-Bar Ceiling
|
2/20/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
T-Bar Ceiling
|
3/4/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
3/5/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
T-Bar Ceiling
|
3/5/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Insulation
|
3/20/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Excavation/Setback/Form/Re-Bar
|
3/21/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Final
|
3/21/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Footing/Foundation/Slab
|
3/21/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Green Building Final
|
3/21/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Smoke Detectors
|
3/21/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
T-Bar Ceiling
|
3/21/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
3/29/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Interior/Exterior Lathing
|
4/2/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
4/23/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
T-Bar Ceiling
|
4/23/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Insulation
|
4/30/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Special/Order Compliance
|
4/30/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
T-Bar Ceiling
|
4/30/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Drywall Nailing
|
5/2/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
T-Bar Ceiling
|
5/2/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Interior/Exterior Lathing
|
5/7/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Final
|
7/24/2024
|
Partial Inspection
|
LUIS CCAMACHO
|
|
Green Building Final
|
7/24/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Smoke Detectors
|
7/24/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
2/4/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Insulation
|
2/6/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
2/7/2025
|
Not Ready for Inspection
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
2/13/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Pre-Inspection
|
4/30/2025
|
Not Ready for Inspection
|
PAUL BAZERKANIAN
|
|
Final
|
5/19/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|
|
Green Building Final
|
5/19/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|
|
Smoke Detectors
|
5/19/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|
|
Final
|
5/21/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|
|
Green Building Final
|
5/21/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|
|
Smoke Detectors
|
5/21/2026
|
Not Ready for Inspection
|
REGINA MENDEZ
|