7585 W SHORE CLIFF DR 90045

Certificate Information: 7585 W SHORE CLIFF DR 90045

Application / Permit
21016-20000-07807
Plan Check / Job No.
B21VN03693
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL TO THE (E) KITCHEN, DINING ROOM AND LIVING ROOM. CREATE (N) BATHROOM AND CLOSET ON (E) BEDROOM AT 2ND FLOOR. NO SQUARE FOOTAGE ADDED. PER ENGINEERING DESIGN.
Permit Issued
Issued on 5/27/2021
Issuing Office
Current Status
Permit Finaled on 2/10/2022

Permit Application Status History

Submitted 3/26/2021 APPLICANT
Assigned to Plan Check Engineer 3/31/2021 ALFREDO JARA
Corrections Issued 4/6/2021 ALFREDO JARA
Plan Check Approved 5/4/2021 ALFREDO JARA
Issued 5/27/2021 APPLICANT
Permit Finaled 2/10/2022 BOBBY KEY

Permit Application Clearance Information

Specific Plan Cleared 4/20/2021 IRA BROWN
ZI Cleared 4/20/2021 IRA BROWN
Grading Pre-Inspection Cleared 4/27/2021 PATRICK MISCHLICH

Contact Information

Contractor Goldenline Construction Inc; Lic. No.: 989378-B 1812 W BURBANK BLVD #201      BURBANK, CA 91506
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 1950 SAWTELLE BLVD STE 175      LOS ANGELES, CA 90025

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/21/2021 Approved BRENDAN LOONEY
PLUMBING-Rough 8/17/2021 Approved BRENDAN LOONEY
Shower Pan 8/20/2021 Approved BRENDAN LOONEY
Interior/Exterior Lathing 8/26/2021 Approved SHAVONNE ESPINOZA
Rough-Elec/Plmb/HVAC 9/29/2021 Corrections Issued JOHNNY MIRANDA
BUILDING-Rough-Frame 10/7/2021 Corrections Issued BRENDAN LOONEY
ELECTRICAL-Rough 10/7/2021 Corrections Issued BRENDAN LOONEY
Drywall Nailing 10/21/2021 Partial Approval DAVID FEILER
Insulation 10/21/2021 Partial Approval DAVID FEILER
Rough-Elec/Plmb/HVAC 10/21/2021 Approved DAVID FEILER
BUILDING-Rough-Frame 10/25/2021 Corrections Issued DAVID FEILER
BUILDING-Rough-Frame 10/28/2021 Approved BOBBY KEY
Pre-Inspection 10/28/2021 Partial Inspection DAVID FEILER
Drywall Nailing 11/2/2021 Approved BOBBY KEY
Interior/Exterior Lathing 11/2/2021 Approved BOBBY KEY
Drywall Nailing 11/5/2021 Approved JOHN KAYON
Final 2/8/2022 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 2/8/2022 SGSOV Not Ready BOBBY KEY
Smoke Detectors 2/8/2022 Approved BOBBY KEY
Final 2/10/2022 Permit Finaled BOBBY KEY
SGSOV-Seismic Gas S/O Valve 2/10/2022 SGSOV Approved BOBBY KEY