9109 W OLIN ST 90034

Certificate Information: 9109 W OLIN ST 90034

Application / Permit
21016-20000-07773
Plan Check / Job No.
B21VN03667
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT THE (E) 18'-3"x 18'-2" TWO CAR DETACHED GARAGE INTO A (N) ACCESSORY DWELLING UNIT PER GCS65852.2 (e) (1) (A). WORK PER ENGINEER.
Permit Issued
Issued on 8/16/2021
Issuing Office
Current Status
CofO Issued on 11/29/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/26/2021 APPLICANT
Assigned to Plan Check Engineer 3/31/2021 TROY DEGUZMAN
Corrections Issued 4/4/2021 TROY DEGUZMAN
Applicant returned to address corrections 8/4/2021 TROY DEGUZMAN
Plan Check Approved 8/9/2021 TROY DEGUZMAN
Issued 8/16/2021 APPLICANT
CofO in Progress 11/18/2022 RICHARD STEINBACH
Permit Finaled 11/29/2022 DANIEL ORRANTE
CofO Issued 11/29/2022 DANIEL ORRANTE
Permit Finaled 11/29/2022 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 4/16/2021 ROSA SILVA
Sewer availability Cleared 4/16/2021 ROSA SILVA
Eng Process Fee Ord 176,300 Cleared 4/20/2021 ROSA SILVA
Grading Pre-Inspection Cleared 7/22/2021 KIRK LINKLATER
Construction within easement Cleared 7/24/2021 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Kazemi,, Milad; Lic. No.: C92143 6250 CANOGA AVE #525      WOODLAND HILLS, CA 91367

Inspector Information

WILBER ROSALES, (310) 914-3892 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/23/2021 Corrections Issued EVAN COOPER
Footing/Foundation/Slab 8/23/2021 Not Ready for Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 4/26/2022 Partial Approval EVAN COOPER
Sewer 4/26/2022 Approved EVAN COOPER
BUILDING-Rough-Frame 10/26/2022 Approved JESUS RODRIGUEZ
Final 10/26/2022 Corrections Issued JESUS RODRIGUEZ
Green Building Final 10/26/2022 Approved JESUS RODRIGUEZ
Green Building Rough 10/26/2022 Approved JESUS RODRIGUEZ
METHANE-Final 10/26/2022 Approved JESUS RODRIGUEZ
METHANE-Rough 10/26/2022 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/26/2022 SGSOV Not Ready JESUS RODRIGUEZ
Smoke Detectors 10/26/2022 Approved JESUS RODRIGUEZ
Final 11/17/2022 Partial Approval JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 11/17/2022 SGSOV Not Required JESUS RODRIGUEZ