11438 W LANDALE ST 91602

Certificate Information: 11438 W LANDALE ST 91602

Application / Permit
21016-20000-07768
Plan Check / Job No.
B21VN03663
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) DETACHED GARAGE TO ACCESSORY DWELLING UNIT PER GCS65852.2(e)(1)(A). NFPA 13D FIRE SPRINKLERS REQUIRED THROUGHOUT. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 11/3/2021
Issuing Office
Current Status
CofO Issued on 10/15/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/26/2021 APPLICANT
Assigned to Plan Check Engineer 3/31/2021 COLIN LOREDO
Corrections Issued 4/6/2021 COLIN LOREDO
Quality Review Completed 4/7/2021 OMID HEDAYAT
Applicant returned to address corrections 10/26/2021 COLIN LOREDO
Plan Check Approved 10/26/2021 COLIN LOREDO
Issued 11/3/2021 APPLICANT
CofO in Progress 9/20/2022 DAVID MATSON
CofO Issued 10/15/2022 MICHAEL SMITH
Permit Finaled 10/15/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 6/29/2021 ADRIAN CASTRO
Eng Process Fee Ord 176,300 Cleared 6/29/2021 ADRIAN CASTRO
Sewer availability Cleared 6/29/2021 ADRIAN CASTRO
ZI Cleared 8/3/2021 LAUREN PADICK
Construction near power lines Cleared 9/13/2021 OSCAR CASTRO
Low Impact Development Cleared 9/30/2021 CHRIS PARK
Roof/Waste drainage to street Cleared 10/12/2021 ABDULLAH SADOZAI
Hydrant and Access approval Cleared 10/13/2021 KURT CORRAL

Contact Information

Contractor Owner-Builder       ,
Engineer Yuzon,, Benigno S; Lic. No.: S3454 2511 PEACHWOOD PLACE      WESTLAKE VILLAGE, CA 91361

Inspector Information

JAVIER RAMOS JR, (818) 374-1163 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/24/2021 Conditional Approval THOMAS FINNILA
Footing/Foundation/Slab 12/7/2021 Partial Approval THOMAS FINNILA
Floor/Roof Diaphrgm/Shear Wall 1/24/2022 Corrections Issued DEANDRE HOFFMAN
Green Building Rough 1/24/2022 Not Ready for Inspection DEANDRE HOFFMAN
Wood Frame 4/1/2022 Conditional Approval THOMAS FINNILA
Interior/Exterior Lathing 4/7/2022 Not Ready for Inspection THOMAS FINNILA
Interior/Exterior Lathing 4/15/2022 Partial Approval THOMAS FINNILA
Green Building Rough 4/21/2022 Approved CHRISTOPHE COCHRAN
Insulation 4/21/2022 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 4/21/2022 Approved CHRISTOPHE COCHRAN
Wood Frame 4/21/2022 Approved CHRISTOPHE COCHRAN
Drywall Nailing 5/10/2022 Approved THOMAS FINNILA
Final 8/15/2022 Corrections Issued THOMAS FINNILA
Green Building Final 8/15/2022 Approved THOMAS FINNILA
SGSOV-Seismic Gas S/O Valve 8/15/2022 SGSOV Not Ready THOMAS FINNILA
Smoke Detectors 8/15/2022 Corrections Issued THOMAS FINNILA
Final 8/30/2022 Corrections Issued MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 8/30/2022 SGSOV Approved MISAEL ESPARZA
Smoke Detectors 8/30/2022 Approved MISAEL ESPARZA
Final 8/31/2022 Corrections Issued MISAEL ESPARZA
Final 9/12/2022 OK to Issue CofO THOMAS FINNILA