5936 N SHOSHONE AVE 91316

Certificate Information: 5936 N SHOSHONE AVE 91316

Application / Permit
21016-20000-07029
Plan Check / Job No.
B21VN03275
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Convert the den to relocate the kitchen. Convert slab-on grade to raise floor foundation at kitchen; to match the existing single-family dwelling. Reframe roof over kitchen. Relocate laundry. Enlarge dining room and master bthrm/close. Enclose and reframe existing entry porch. All work per engineer.
Permit Issued
Issued on 5/7/2021
Issuing Office
Current Status
Permit Finaled on 11/3/2021

Permit Application Status History

Submitted 3/22/2021 APPLICANT
Assigned to Plan Check Engineer 3/23/2021 ANGELICA DAVE
Corrections Issued 3/23/2021 ANGELICA DAVE
Applicant returned to address corrections 4/14/2021 ANGELICA DAVE
Plan Check Approved 5/7/2021 ANGELICA MARTINEZ
Issued 5/7/2021 APPLICANT
Building Plans Picked Up 5/7/2021 APPLICANT
Permit Finaled 11/3/2021 SEAN HAUPT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/8/2021 JOHN TRIANTAFYLLOS
Roof/Waste drainage to street Cleared 4/8/2021 JOHN TRIANTAFYLLOS

Contact Information

Contractor Owner-Builder       ,
Engineer Basma,, Ali J; Lic. No.: C53080 21500 WYANDOTTE ST 106      CANOGA PARK, CA 91303

Inspector Information

JON MCHUGH, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI
IVAN SARABIA, (818) 774-4348 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/18/2021 Approved TROY SANDERS
BUILDING-Rough-Frame 5/25/2021 Partial Approval STEVEN BACK
Insulation 5/25/2021 Partial Approval STEVEN BACK
PLUMBING-Rough 5/25/2021 Partial Approval STEVEN BACK
Shower Pan 5/25/2021 Approved STEVEN BACK
BUILDING-Rough-Frame 6/2/2021 Corrections Issued STEVEN BACK
ELECTRICAL-Rough 6/2/2021 Approved STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 6/2/2021 Corrections Issued STEVEN BACK
HVAC-Rough 6/2/2021 Corrections Issued STEVEN BACK
PLUMBING-Rough 6/2/2021 Approved STEVEN BACK
BUILDING-Rough-Frame 6/11/2021 Conditional Approval STEVEN BACK
Floor/Roof Diaphrgm/Shear Wall 6/11/2021 Approved STEVEN BACK
HVAC-Rough 6/11/2021 Approved STEVEN BACK
Pre-Inspection 6/11/2021 Partial Inspection STEVEN BACK
BUILDING-Rough-Frame 7/8/2021 Approved STEVEN BACK
Interior/Exterior Lathing 7/8/2021 Approved STEVEN BACK
Insulation 7/14/2021 Approved RYAN SALAZAR
Drywall Nailing 7/21/2021 Approved STEVEN BACK
Final 11/3/2021 Permit Finaled SEAN HAUPT
SGSOV-Seismic Gas S/O Valve 11/3/2021 SGSOV Approved SEAN HAUPT
Smoke Detectors 11/3/2021 Approved SEAN HAUPT