3369 N BENNETT DR 90068

Certificate Information: 3369 N BENNETT DR 90068

Application / Permit
21016-20000-04656
Plan Check / Job No.
B21VN02130
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) GARAGE INTO (N) ACCESSORY DWELLING UNIT PER LAMC 12.22A33(c)(d)(g) (NFPA-13D FIRE SPRINKLERS THROUGHOUT)
Permit Issued
Issued on 6/9/2021
Issuing Office
Valley
Current Status
CofO Issued on 12/5/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/23/2021 APPLICANT
Assigned to Plan Check Engineer 3/4/2021 NILOOFAR MEHRAIN
Corrections Issued 3/5/2021 NILOOFAR MEHRAIN
Plan Check Approved 5/21/2021 NILOOFAR MEHRAIN
Building Plans Picked Up 6/1/2021 APPLICANT
Issued 6/9/2021 APPLICANT
CofO in Progress 11/21/2023 BRIAN SULLIVAN
Permit Finaled 12/5/2023 DEROLD HAUFF
CofO Issued 12/5/2023 DEROLD HAUFF
Permit Finaled 12/5/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 3/18/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 3/18/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 3/18/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 3/18/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 3/18/2021 LEE GUILBEAUX
BHO/Hillside ordinance Cleared 3/18/2021 LEE GUILBEAUX
Eng Process Fee Ord 176,300 Cleared 3/18/2021 LEE GUILBEAUX
Sewer availability Cleared 3/18/2021 LEE GUILBEAUX
Street Frontage Cleared 3/18/2021 LEE GUILBEAUX
Grading Pre-Inspection Cleared 4/5/2021 PATRICK MISCHLICH
Hydrant and Access approval Cleared 5/13/2021 MATTHEW CRAIG

Contact Information

Contractor Perez Construction & Development Corporation; Lic. No.: 771304-B 1521 S COCHRAN AVE      LOS ANGELES, CA 90019
Engineer Morales,, Carlos A; Lic. No.: C69972 38100 SAN MATEO AVE      PALMDALE, CA 93551

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 6/21/2021 Partial Approval BRIAN SULLIVAN
Excavation/Setback/Form/Re-Bar 6/24/2021 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 6/24/2021 Approved BRIAN SULLIVAN
Gas Test 7/7/2021 Approved BRIAN SULLIVAN
Underground Mechanical 7/7/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 7/20/2021 Approved BRIAN SULLIVAN
PLUMBING-Rough 7/20/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 7/23/2021 Not Ready for Inspection RAUL BARAJAS
Green Building Rough 7/23/2021 Approved RAUL BARAJAS
Interior/Exterior Lathing 7/23/2021 Approved RAUL BARAJAS
MERV13>=Rough 7/23/2021 Not Ready for Inspection RAUL BARAJAS
Shower Pan 7/23/2021 Approved RAUL BARAJAS
Verify Sprinkler Sign Off 7/23/2021 Corrections Issued RAUL BARAJAS
Gas Test 7/30/2021 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 7/30/2021 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 8/9/2021 Corrections Issued BRIAN SULLIVAN
HVAC-Final 8/9/2021 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 8/9/2021 Approved BRIAN SULLIVAN
Insulation 8/9/2021 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 8/9/2021 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 8/12/2021 Conditional Approval RICHARD STEINBACH
Insulation 8/12/2021 Approved RICHARD STEINBACH
MERV13>=Rough 8/12/2021 Approved RICHARD STEINBACH
Verify Sprinkler Sign Off 8/12/2021 Conditional Approval RICHARD STEINBACH
Interior/Exterior Lathing 8/19/2021 Approved RAUL BARAJAS
Drywall Nailing 8/24/2021 Approved SCOTT FINNILA
BUILDING-Rough-Frame 11/14/2023 Approved BRIAN SULLIVAN
Final 11/14/2023 Corrections Issued BRIAN SULLIVAN
Green Building Final 11/14/2023 Approved BRIAN SULLIVAN
MERV13>=Final 11/14/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 11/14/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 11/14/2023 Approved BRIAN SULLIVAN
Verify Sprinkler Sign Off 11/14/2023 Approved BRIAN SULLIVAN
Final 11/20/2023 OK to Issue CofO BRIAN SULLIVAN