7100 N LENA AVE 91307

Certificate Information: 7100 N LENA AVE 91307

Application / Permit
21016-20000-02703
Plan Check / Job No.
B21VN01234
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN, REMOVE WALL AND REPLACE THE WINDOW, INCLUDING ELECTRICAL, PLUMBING AND MECHANICAL WITHIN THE WORK AREA. DESIGN PER WFPP.
Permit Issued
Issued on 3/26/2021
Issuing Office
Current Status
Permit Finaled on 6/4/2021

Permit Application Status History

Submitted 2/2/2021 APPLICANT
Assigned to Plan Check Engineer 2/11/2021 LUIS RINCON
Corrections Issued 2/13/2021 LUIS RINCON
Plan Check Approved 2/19/2021 LUIS RINCON
Applicant returned to address corrections 2/22/2021 LUIS RINCON
No Progress 2/22/2021 LUIS RINCON
Plan Check Approved 3/9/2021 LUIS RINCON
Plan Check Approved 3/11/2021 LUIS RINCON
Building Plans Picked Up 3/12/2021 APPLICANT
Issued 3/26/2021 APPLICANT
Permit Finaled 6/3/2021 DAVID STEPANYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Sweven Remodel Inc; Lic. No.: 1052069-B 19528 VENTURA BLVD #436      TARZANA, CA 91356
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

JEFFREY HARTLINE, (818) 774-4320 Office Hours: 7:00-8:00 AM MON-FRI
CHRIS CHRISTENSEN, (818) 774-4320 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 3/31/2021 Corrections Issued DAVID STEPANYAN
Special/Order Compliance 3/31/2021 Corrections Issued DAVID STEPANYAN
Wood Frame 3/31/2021 Corrections Issued DAVID STEPANYAN
Footing/Foundation/Slab 4/6/2021 Approved DAVID STEPANYAN
Deputy Drilled-In Anchors 4/8/2021 Approved DAVID STEPANYAN
Interior/Exterior Lathing 4/13/2021 Approved DAVID STEPANYAN
Wood Frame 4/13/2021 Approved DAVID STEPANYAN
Drywall Nailing 4/15/2021 Approved DAVID STEPANYAN
Final 5/17/2021 Not Ready for Inspection JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 5/17/2021 SGSOV Not Ready JESUS RODRIGUEZ
Smoke Detectors 5/17/2021 Not Ready for Inspection JESUS RODRIGUEZ
Final 5/24/2021 Corrections Issued DAVID STEPANYAN
SGSOV-Seismic Gas S/O Valve 5/24/2021 SGSOV Approved DAVID STEPANYAN
Smoke Detectors 5/24/2021 Corrections Issued DAVID STEPANYAN
Final 6/3/2021 Permit Finaled DAVID STEPANYAN
Smoke Detectors 6/3/2021 Approved DAVID STEPANYAN