2476 S ARMACOST AVE 90064

Certificate Information: 2476 S ARMACOST AVE 90064

Application / Permit
21016-20000-01348
Plan Check / Job No.
B21VN00619
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL, CONVERT A BEDROOM INTO A (N) BATHROOM, ADD A NEW SLIDING DOOR TO THE MASTER BEDROOM, REMODEL THE (E) KITCHEN. ALL WORK PER ENG.
Permit Issued
Issued on 3/18/2021
Issuing Office
Current Status
Permit Finaled on 7/14/2021

Permit Application Status History

Submitted 1/27/2021 APPLICANT
Assigned to Plan Check Engineer 2/10/2021 JEFFREY TANGONAN
Corrections Issued 2/13/2021 JEFFREY TANGONAN
Plan Check Approved 2/26/2021 JEFFREY TANGONAN
Building Plans Picked Up 3/3/2021 APPLICANT
Issued 3/18/2021 APPLICANT
Permit Finaled 7/13/2021 OGANES TARAKHCHYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Top Leader Construction Inc; Lic. No.: 1044906-B 326 KATHRYN DR      ANAHEIM, CA 92801
Engineer Barakat,, Fouad Chafic; Lic. No.: C67449 8916 LONGDON AVE #C      TEMPLE CITY, CA 91780

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 3/23/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Footing/Foundation/Slab 3/23/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Wood Frame 3/23/2021 Corrections Issued OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 3/24/2021 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/30/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Footing/Foundation/Slab 3/30/2021 Approved OGANES TARAKHCHYAN
Wood Frame 3/30/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Insulation 4/6/2021 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 4/13/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Wood Frame 4/13/2021 Not Ready for Inspection OGANES TARAKHCHYAN
Rough-Elec/Plmb/HVAC 4/16/2021 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 4/22/2021 Approved EVAN COOPER
Interior/Exterior Lathing 4/22/2021 Approved EVAN COOPER
Shower Pan 4/22/2021 Approved EVAN COOPER
Wood Frame 4/23/2021 Corrections Issued EVAN COOPER
Drywall Nailing 5/4/2021 Approved EVAN COOPER
Interior/Exterior Lathing 5/4/2021 Approved EVAN COOPER
BUILDING-Rough-Frame 7/7/2021 Approved DONALD GALLAGHER
Final 7/7/2021 Not Ready for Inspection DONALD GALLAGHER
MERV13>=Final 7/7/2021 Approved DONALD GALLAGHER
MERV13>=Rough 7/7/2021 Approved DONALD GALLAGHER
SGSOV-Seismic Gas S/O Valve 7/7/2021 SGSOV Not Ready DONALD GALLAGHER
Smoke Detectors 7/7/2021 Approved DONALD GALLAGHER
Final 7/13/2021 Permit Finaled OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 7/13/2021 SGSOV Approved OGANES TARAKHCHYAN