1001 N SEWARD ST 90038

Certificate Information: 1001 N SEWARD ST 90038

Application / Permit
21016-10001-30821
Plan Check / Job No.
B22LA17454
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
EARLY START PERMIT FOR INTERIOR T.I. OF FLOORS 3, 4, AND 5, NEW INTERIOR STAIR, ROOFTOP EQUIPMENT INSTALLATION, WITH NO EXTERIOR WORK AND NO CHANGE TO FLOOR AREA. (DEFERRED SUBMITTALS: STORAGE RACKS & ROLLING STORAGE SYSTEM, WALK-IN REFRIGERATOR), (UNDER SEPARATE PERMIT IS REQUIRED FOR NEW KITCHEN ON 4TH FLOOR AND GREASE INTERCEPTOR. ALL THE SEISMIC UPGRADE WORK FOR STRUCTURAL SHALL BE PERMITTED UNDER 21016-10000-30821) <INSPECTOR SHALL NOT BE FINALED THIS PERMIT APPLICAITON AND THE BUILDING SHALL NOT BE OCCUPIED UNTIL WORK UNDER 22016-10000-01880 AND STRENGTHENING OF LATERAL STRUCTURAL SYSTEM UNDER 21016-10000-30821 ALSO COMPLETED>
Permit Issued
Issued on 12/15/2022
Issuing Office
Metro
Current Status
Permit Finaled on 2/14/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/14/2022 APPLICANT
Assigned to Plan Check Engineer 9/14/2022 YOUNG KIM
Corrections Issued 9/14/2022 YOUNG KIM
Quality Review Completed 9/15/2022 FARUK SEZER
Plan Check Approved 12/12/2022 YOUNG KIM
Issued 12/15/2022 APPLICANT
Permit Finaled 2/13/2024 ALFREDO LOPEZ

Permit Application Clearance Information

Sewer availability Cleared 9/28/2022 CHRISTOPHER ROCHA
Eng Process Fee Ord 176,300 Cleared 9/29/2022 CHRISTOPHER ROCHA
Green Code Cleared 10/4/2022 AARON COSTA
Food Service Establishment Cleared 10/19/2022 KENNETH BROWNE
DAS Clearance Cleared 11/3/2022 CHAD DOI

Contact Information

Architect Brennan,, Ross A; Lic. No.: C27858 7008 SANTA MONICA BLVD      HOLLYWOOD, CA 90038
Contractor Clune Construction Company L P; Lic. No.: 732107-B 725 SOUTH FIGUEROA STREET   STE 300    LOS ANGELES, CA 90017
Engineer Mengelkoch,, Samuel Owen; Lic. No.: S5439 813 WILCOX AVE 203      LOS ANGELES, CA 90038

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 12/21/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/22/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/23/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/27/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/28/2022 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/9/2023 Approved ALFREDO LOPEZ
Deputy Steel/Welding 1/9/2023 Approved ALFREDO LOPEZ
Light Gage Steel Frame 1/9/2023 Partial Approval ALFREDO LOPEZ
Deputy Drilled-In Anchors 1/10/2023 Partial Approval JEROME BLACKWOOD
Deputy Steel/Welding 1/10/2023 Partial Approval JEROME BLACKWOOD
Deputy Drilled-In Anchors 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/11/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/12/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/17/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/18/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 1/19/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/17/2023 Partial Approval JEROME BLACKWOOD
Light Gage Steel Frame 2/27/2023 Partial Approval JEROME BLACKWOOD
Drywall Nailing 4/14/2023 Partial Approval JEROME BLACKWOOD
Excavation/Setback/Form/Re-Bar 4/14/2023 Partial Inspection JEROME BLACKWOOD
Final 2/13/2024 Permit Finaled ALFREDO LOPEZ
Green Building Final 2/13/2024 Approved ALFREDO LOPEZ
Smoke Detectors 2/13/2024 Approved ALFREDO LOPEZ