519 S ARDEN BLVD 90020

Certificate Information: 519 S ARDEN BLVD 90020

Application / Permit
21016-10001-14976
Plan Check / Job No.
B23LA00551
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
SUPPLEMENTAL 21016-10000-14976: 8'-6"x 11'-8" ADDITION TO EXISTING TWO STORY SINGLE FAMILY RESIDENCE PER ENGINEER DESIGN
Permit Issued
Issued on 3/23/2023
Issuing Office
Metro
Current Status
Issued on 3/23/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/13/2023 APPLICANT
Assigned to Plan Check Engineer 1/19/2023 AUNG SOE
Corrections Issued 1/23/2023 AUNG SOE
Building Plans Picked Up 1/30/2023 APPLICANT
Applicant returned to address corrections 3/8/2023 CRISTINA SALAZAR
Plan Check Approved 3/9/2023 CRISTINA SALAZAR
Issued 3/23/2023 APPLICANT

Permit Application Clearance Information

CPC Cleared 2/7/2023 DAMIAN GATTO
CPC Cleared 2/7/2023 DAMIAN GATTO
CPC Cleared 2/7/2023 DAMIAN GATTO
HPOZ Cleared 2/7/2023 DAMIAN GATTO
ZI Cleared 2/7/2023 DAMIAN GATTO
Roof/Waste drainage to street Cleared 2/15/2023 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 2/16/2023 JEANIE LAM

Contact Information

Contractor Howley Lauren; Lic. No.: 1020130-B 4700 MASCOT STREET      LOS ANGELES, CA 90019
Engineer Sayah,, Daniel Hoshyar; Lic. No.: S6000 15233 VENTURA BLVD 1130      SHERMAN OAKS, CA 91403

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/10/2023 Corrections Issued RICHARD DOCKUS
Footing/Foundation/Slab 4/17/2023 Partial Approval RICHARD DOCKUS
METHANE-Barrier 4/17/2023 Approved RICHARD DOCKUS
METHANE-Subgrade 4/17/2023 Approved RICHARD DOCKUS
Deputy Steel/Welding 4/27/2023 Conditional Approval RICHARD DOCKUS
BUILDING-Rough-Frame 5/2/2023 Partial Approval RICHARD DOCKUS
Insulation 5/8/2023 Partial Approval RICHARD DOCKUS
Floor/Roof Diaphrgm/Shear Wall 5/15/2023 Partial Approval RICHARD DOCKUS
ELECTRICAL-Rough 5/26/2023 Approved JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 5/26/2023 Corrections Issued JEFFREY MEAD
HVAC-Rough 5/26/2023 Approved JEFFREY MEAD
Wood Frame 5/26/2023 Not Ready for Inspection JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 6/2/2023 Corrections Issued RICHARD DOCKUS
Floor/Roof Diaphrgm/Shear Wall 6/12/2023 Approved RICHARD DOCKUS
Wood Frame 7/19/2023 Approved STUART CHAPMAN
BUILDING-Rough-Frame 7/21/2023 Partial Approval JOSEPH MCGARRY
Insulation 7/21/2023 Approved JOSEPH MCGARRY
METHANE-Rough 7/21/2023 Approved JOSEPH MCGARRY
Drywall Nailing 7/25/2023 Approved JOSEPH MCGARRY
Interior/Exterior Lathing 7/25/2023 Approved JOSEPH MCGARRY
BUILDING-Rough-Frame 12/22/2023 Approved RICHARD DOCKUS
Final 12/22/2023 Corrections Issued RICHARD DOCKUS
Footing/Foundation/Slab 12/22/2023 Approved RICHARD DOCKUS
Green Building Final 12/22/2023 Approved RICHARD DOCKUS
Green Building Rough 12/22/2023 Approved RICHARD DOCKUS
Smoke Detectors 12/22/2023 Corrections Issued RICHARD DOCKUS
Final 2/22/2024 Not Ready for Inspection RICHARD DOCKUS
Smoke Detectors 2/22/2024 Approved RICHARD DOCKUS
Final 2/29/2024 Conditional Approval RICHARD DOCKUS