600 W 7TH ST 90017

Certificate Information: 600 W 7TH ST 90017

Application / Permit
21016-10000-59345
Plan Check / Job No.
B21LA24281
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
BUILD OUT OF EXISTING SUITE, TENANT IMPROVEMENT TO INCLUDE NEW INTERIOR NON LOAD BEARING PARTITIONS, INTERIOR DOOR AND RAISED ACCESS FLOORING WITH RAMP AND STEPS, SUSPENDED T-BAR CEILING SYSTEM. INSTALL ROOF EQUIPMENT ON BUILT UP PLATFORM.
Permit Issued
Issued on 4/26/2023
Issuing Office
Metro
Current Status
Permit Finaled on 3/3/2025

Permit Application Status History

Submitted 1/13/2022 APPLICANT
Assigned to Plan Check Engineer 1/20/2022 ALBERT SERVIN
Corrections Issued 1/25/2022 ALBERT SERVIN
Green Plans Picked Up 1/25/2022 APPLICANT
Quality Review Completed 1/26/2022 PETER KIM
Building Plans Picked Up 1/31/2022 APPLICANT
Disabled Access Plans Picked Up 2/9/2022 APPLICANT
Applicant returned to address corrections 8/16/2022 ALBERT SERVIN
Plan Check Approved 3/29/2023 ALBERT SERVIN
Issued 4/26/2023 APPLICANT
Permit Finaled 2/3/2025 PAUL BAZERKANIAN

Permit Application Clearance Information

"D" conditions Cleared 2/3/2022 RICHARD REASER
City Hist. Cultural Monument Cleared 2/3/2022 LAMBERT GIESSINGER
Historic monument Cleared 2/3/2022 LAMBERT GIESSINGER
ZA Case Cleared 2/3/2022 RICHARD REASER
ZA Case Cleared 2/3/2022 RICHARD REASER
ZA Case Cleared 2/3/2022 RICHARD REASER
Metro Rail approval Cleared 2/15/2022 ALBERT SERVIN
Green Code Cleared 3/1/2022 AARON COSTA
Fire Marshal Fire Life Safety Cleared 3/3/2022 MENOA AGHAJANI
DAS Clearance Cleared 1/10/2023 ALBERT SERVIN
Building over 36-ft Cleared 3/29/2023 CALOSHA APPROVED

Contact Information

Architect Chan,, John Tuen-Jon; Lic. No.: C16828 65 N FIRST AVENUE SUITE 201      ARCADIA, CA 91006
Contractor Clune Construction Company L P; Lic. No.: 732107-B 725 SOUTH FIGUEROA STREET   STE 300    LOS ANGELES, CA 90017
Engineer Li,, Lai; Lic. No.: C89944 550 N SAINT CLAIR ST UNIT 1603      CHICAGO, IL 60611

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 6/21/2023 Approved KATY RAMIREZ
Reinforced Concrete Frame 6/23/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 7/11/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 7/11/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 7/21/2023 Partial Approval JULIAN CAPUCETTI
Drywall Nailing 7/26/2023 Partial Approval KATY RAMIREZ
Footing/Foundation/Slab 7/26/2023 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 7/31/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/3/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/4/2023 Conditional Approval KATY RAMIREZ
Structural Steel Frame 8/7/2023 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/8/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/8/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/9/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/9/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/10/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/10/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/11/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/11/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/15/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Steel/Welding 8/15/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Drilled-In Anchors 8/16/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/16/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/17/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/17/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/18/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/18/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/22/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Steel/Welding 8/22/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Drilled-In Anchors 8/23/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/23/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/24/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/24/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/25/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/25/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/29/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/29/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/30/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/30/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 8/31/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 8/31/2023 Conditional Approval KATY RAMIREZ
Insulation 8/31/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 8/31/2023 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/1/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/1/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 9/6/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Steel/Welding 9/6/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Drilled-In Anchors 9/7/2023 No Access for Inspection RAMAZANALI ALMASI
Deputy Steel/Welding 9/7/2023 No Access for Inspection RAMAZANALI ALMASI
Deputy Drilled-In Anchors 9/8/2023 No Access for Inspection RAMAZANALI ALMASI
Deputy Steel/Welding 9/8/2023 No Access for Inspection RAMAZANALI ALMASI
Drywall Nailing 9/12/2023 Partial Approval RAMAZANALI ALMASI
Structural Steel Frame 9/15/2023 Not Ready for Inspection RAMAZANALI ALMASI
Deputy Drilled-In Anchors 9/22/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 9/22/2023 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 9/27/2023 Partial Approval KATY RAMIREZ
Structural Steel Frame 9/27/2023 Partial Inspection KATY RAMIREZ
Deputy Drilled-In Anchors 9/28/2023 Conditional Approval MICHAEL ROSENBERG
Drywall Nailing 9/28/2023 Partial Approval KATY RAMIREZ
Insulation 10/2/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 10/5/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/5/2023 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/6/2023 Conditional Approval KATY RAMIREZ
Drywall Nailing 10/10/2023 Partial Approval KATY RAMIREZ
Excavation/Setback/Form/Re-Bar 10/10/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/10/2023 Partial Approval KATY RAMIREZ
Deputy Reinf. Concrete 10/11/2023 Conditional Approval KATY RAMIREZ
Drywall Nailing 10/13/2023 Partial Approval KATY RAMIREZ
Light Gage Steel Frame 10/13/2023 Partial Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/18/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/20/2023 Conditional Approval KATY RAMIREZ
Deputy Drilled-In Anchors 10/27/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 11/2/2023 Conditional Approval RAMAZANALI ALMASI
Deputy Drilled-In Anchors 11/3/2023 Conditional Approval KATY RAMIREZ
Deputy Steel/Welding 11/6/2023 Conditional Approval KATY RAMIREZ
Light Gage Steel Frame 11/6/2023 No Access for Inspection KATY RAMIREZ
Deputy Steel/Welding 11/7/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Fireproofing 11/29/2023 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 11/30/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 12/1/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 12/4/2023 Partial Inspection KATY RAMIREZ
Insulation 12/4/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 12/5/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 12/7/2023 Partial Approval KATY RAMIREZ
Special/Order Compliance 12/7/2023 Partial Approval KATY RAMIREZ
Drywall Nailing 12/11/2023 Partial Approval KATY RAMIREZ
Deputy Steel/Welding 12/13/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 12/19/2023 No Access for Inspection MICHAEL ROSENBERG
Structural Steel Frame 1/19/2024 Partial Inspection KATY RAMIREZ
Drywall Nailing 3/4/2024 Partial Approval ALFREDO LOPEZ
Insulation 3/4/2024 Partial Approval ALFREDO LOPEZ
Light Gage Steel Frame 3/4/2024 Partial Approval ALFREDO LOPEZ
Structural Steel Frame 3/4/2024 Approved ALFREDO LOPEZ
Light Gage Steel Frame 4/1/2024 Partial Approval NICK DANERI
Structural Steel Frame 4/1/2024 Partial Approval NICK DANERI
Pre-Inspection 4/15/2024 Partial Inspection LUIS CCAMACHO
Structural Steel Frame 4/15/2024 Partial Inspection LUIS CCAMACHO
Structural Steel Frame 4/16/2024 Not Ready for Inspection LUIS CCAMACHO
Structural Steel Frame 4/22/2024 Not Ready for Inspection LUIS CCAMACHO
Structural Steel Frame 4/29/2024 Partial Approval LUIS CCAMACHO
Structural Steel Frame 6/11/2024 Partial Approval LUIS CCAMACHO
T-Bar Ceiling 7/25/2024 Partial Approval LUIS CCAMACHO
Excavation/Setback/Form/Re-Bar 9/23/2024 Partial Approval PAUL BAZERKANIAN
Footing/Foundation/Slab 9/23/2024 Partial Approval PAUL BAZERKANIAN
Final 2/3/2025 Permit Finaled PAUL BAZERKANIAN
Green Building Final 2/3/2025 Approved PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 2/3/2025 SGSOV Approved PAUL BAZERKANIAN
Smoke Detectors 2/3/2025 Approved PAUL BAZERKANIAN