3907 N YORK BLVD 90065

Certificate Information: 3907 N YORK BLVD 90065

Application / Permit
21016-10000-59340
Plan Check / Job No.
B21LA24270
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PARTIAL REMODEL TO SINGLE FAMILY DWELLING WORK TO INCLUDE REMODEL KITCHEN AND ENCLOSE AN EXISTING PERMITTED 40 SQFT COVERED PORCH. REPLACEMENT OF EXISTING BASEMENT STAIRS WITH NEW SPIRAL STAIRCASE. RELOCATE LAUNDRY ROOM TO EXISTING BASEMENT. NEW BATHROOM AT BASEMENT LEVEL
Permit Issued
Issued on 3/9/2023
Issuing Office
Metro
Current Status
Permit Finaled on 2/8/2024

Permit Application Status History

Submitted 12/29/2021 APPLICANT
Assigned to Plan Check Engineer 1/27/2022 MONICA RAMIREZ
Corrections Issued 2/3/2022 MONICA RAMIREZ
Quality Review Completed 2/9/2022 KEN GILL
Building Plans Picked Up 2/11/2022 APPLICANT
Plan Check Approved 5/3/2022 MONICA RAMIREZ
Issued 3/9/2023 APPLICANT
Permit Finaled 2/7/2024 ROY SPAULDING

Permit Application Clearance Information

Supp. Use District POD/CDO/TDO Cleared 3/18/2022 NICOLE SANCHEZ
Grading Pre-Inspection Cleared 5/3/2022 BRIAN MILLER

Contact Information

Contractor Cornerstone Construction And Design; Lic. No.: 775449-B 4910 MT ROYAL DRIVE      LOS ANGELES, CA 90041
Engineer Choi,, David; Lic. No.: S4784 1327 LOMA AVENUE      LONG BEACH, CA 90804

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/16/2023 Approved CRAIG VAUGHAN
Excavation/Setback/Form/Re-Bar 5/25/2023 Partial Approval CRAIG VAUGHAN
Footing/Foundation/Slab 5/25/2023 Partial Approval CRAIG VAUGHAN
Deputy Drilled-In Anchors 5/31/2023 Conditional Approval CRAIG VAUGHAN
Footing/Foundation/Slab 6/6/2023 Partial Approval CRAIG VAUGHAN
Deputy Reinf. Concrete 6/7/2023 Conditional Approval CRAIG VAUGHAN
BUILDING-Rough-Frame 6/21/2023 Not Ready for Inspection CRAIG VAUGHAN
Underground Mechanical 6/21/2023 Partial Approval CRAIG VAUGHAN
BUILDING-Rough-Frame 6/27/2023 Partial Approval SCOTT FINNILA
Excavation/Setback/Form/Re-Bar 6/27/2023 Partial Approval SCOTT FINNILA
Footing/Foundation/Slab 6/27/2023 Partial Approval SCOTT FINNILA
Underground Mechanical 6/27/2023 Partial Approval SCOTT FINNILA
Deputy Drilled-In Anchors 7/14/2023 Conditional Approval CRAIG VAUGHAN
BUILDING-Rough-Frame 7/21/2023 Not Ready for Inspection CRAIG VAUGHAN
ELECTRICAL-Rough 7/21/2023 Not Ready for Inspection CRAIG VAUGHAN
HVAC-Rough 7/21/2023 Not Ready for Inspection CRAIG VAUGHAN
PLUMBING-Rough 7/21/2023 Not Ready for Inspection CRAIG VAUGHAN
BUILDING-Rough-Frame 7/26/2023 Approved CRAIG VAUGHAN
ELECTRICAL-Rough 7/26/2023 Approved CRAIG VAUGHAN
HVAC-Rough 7/26/2023 Corrections Issued CRAIG VAUGHAN
PLUMBING-Rough 7/26/2023 Approved CRAIG VAUGHAN
Insulation 7/27/2023 Partial Approval THOMAS LOGRASSO
Drywall Nailing 8/1/2023 Approved JEFFREY MEAD
Shower Pan 8/1/2023 Approved JEFFREY MEAD
Interior/Exterior Lathing 8/10/2023 Partial Approval CRAIG VAUGHAN
Interior/Exterior Lathing 11/16/2023 Approved CRAIG VAUGHAN
Final 2/7/2024 Permit Finaled ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 2/7/2024 SGSOV Approved ROY SPAULDING
Smoke Detectors 2/7/2024 Approved ROY SPAULDING