5463 E NORWICH AVE 90032

Certificate Information: 5463 E NORWICH AVE 90032

Application / Permit
21016-10000-59223
Plan Check / Job No.
B21LA24116
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 432 SF 2 CAR GARAGE TO ONE BEDROOM A.D.U. PER STATE LAW. REPAIR/REFRAME DAMAGED ROOF FRAMING AND RE-ROOF
Permit Issued
Issued on 6/9/2023
Issuing Office
Metro
Current Status
CofO Issued on 12/20/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/3/2022 APPLICANT
Assigned to Plan Check Engineer 1/4/2022 JOSEPH RAFOLS
Corrections Issued 1/4/2022 JOSEPH RAFOLS
Building Plans Picked Up 1/6/2022 APPLICANT
Applicant returned to address corrections 1/27/2023 LAWRENCE QUIRANTE
Plan Check Approved 1/27/2023 RAHEL BEYENE
Issued 6/9/2023 APPLICANT
CofO in Progress 12/19/2024 LILIANA PORTILLO
Permit Finaled 12/20/2024 DEROLD HAUFF
CofO Issued 12/20/2024 DEROLD HAUFF
Permit Finaled 12/20/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 2/4/2022 KHOUNG LE
Roof/Waste drainage to street Cleared 2/4/2022 KHOUNG LE
Sewer availability Cleared 2/4/2022 KHOUNG LE
Eng Process Fee Ord 176,300 Cleared 2/8/2022 KHOUNG LE
Construction near power lines Cleared 6/21/2022 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Herrera,, Edgar E; Lic. No.: C67603 1929 GREENLEAF DR      WEST COVINA, CA 91792

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/4/2024 Conditional Approval CRAIG VAUGHAN
Deputy Drilled-In Anchors 4/12/2024 Conditional Approval BRENDAN MORELLI
Footing/Foundation/Slab 4/29/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 4/29/2024 Partial Approval LILIANA PORTILLO
Deputy Drilled-In Anchors 5/8/2024 Approved LILIANA PORTILLO
ELECTRICAL-Rough 5/31/2024 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/31/2024 Partial Approval LILIANA PORTILLO
HVAC-Rough 5/31/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 5/31/2024 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 6/12/2024 Approved ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 6/12/2024 Partial Approval ALIZAH MAYAGOITIA
Green Building Rough 6/12/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
HVAC-Rough 6/12/2024 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 6/12/2024 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 7/11/2024 Conditional Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 7/11/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 7/11/2024 Approved LILIANA PORTILLO
Insulation 7/18/2024 Approved LILIANA PORTILLO
Drywall Nailing 8/8/2024 Approved LILIANA PORTILLO
Shower Pan 8/8/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 8/16/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 11/18/2024 Approved LILIANA PORTILLO
Final 11/18/2024 Corrections Issued LILIANA PORTILLO
Green Building Final 11/18/2024 Not Ready for Inspection LILIANA PORTILLO
Green Building Rough 11/18/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 11/18/2024 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 11/18/2024 Approved LILIANA PORTILLO
Final 12/10/2024 Corrections Issued LILIANA PORTILLO
Green Building Final 12/10/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 12/10/2024 SGSOV Approved LILIANA PORTILLO
Final 12/16/2024 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Final 12/18/2024 Approved LILIANA PORTILLO
Final 12/18/2024 OK to Issue CofO LILIANA PORTILLO
HVAC-Final 12/18/2024 Approved LILIANA PORTILLO
PLUMBING-Final 12/18/2024 Approved LILIANA PORTILLO