7000 W HOLLYWOOD BLVD 90028

Certificate Information: 7000 W HOLLYWOOD BLVD 90028

Application / Permit
21016-10000-55968
Plan Check / Job No.
B21LA22319
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
STRUCTURAL REPAIRS: CONCRETE REPAIR TO 3-COLUMNS AND REPAIR OF CONSTRUCTION JOINT WITH FRP.
Permit Issued
Issued on 4/2/2022
Issuing Office
Current Status
Permit Finaled on 5/9/2023

Permit Application Status History

Submitted 11/29/2021 APPLICANT
Assigned to Plan Check Engineer 12/9/2021 LARRY LEE
Corrections Issued 12/20/2021 LARRY LEE
Disabled Access Plans Picked Up 12/21/2021 APPLICANT
Quality Review Completed 12/22/2021 CHARLES CHANG
Plan Check Approved 3/3/2022 LARRY LEE
Issued 4/2/2022 APPLICANT
Building Plans Picked Up 4/5/2022 APPLICANT
Permit Finaled 5/8/2023 RONALD JIMENEZ

Permit Application Clearance Information

City Hist. Cultural Monument Cleared 2/1/2022 LAMBERT GIESSINGER
Historic monument Cleared 2/1/2022 LAMBERT GIESSINGER
Historic Resource Verification Cleared 2/3/2022 MAX LODER
Metro Rail approval Cleared 2/15/2022 LARRY LEE
DAS Clearance Cleared 2/24/2022 LARRY LEE
Redevelopment Project Area Cleared 2/25/2022 GRACIELA ACOSTA

Contact Information

Contractor Optimum Seismic Inc; Lic. No.: 1012702-B 5508 S SANTA FE AVENUE      VERNON, CA 90058
Engineer Greco,, Adam Matthew; Lic. No.: S4077 1470 WESTERLY TERRACE      LOS ANGELES, CA 90026

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Reinforced Concrete Frame 4/21/2022 Partial Approval SORIN CIRSTOIU
Deputy Drilled-In Anchors 4/29/2022 Conditional Approval TED RIES
Deputy Drilled-In Anchors 5/3/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/4/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/6/2022 Conditional Approval JONATHAN QUACH
Deputy Reinf. Concrete 5/10/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 5/26/2022 Conditional Approval ERNESTO CORRAL
Deputy Reinf. Concrete 5/27/2022 Conditional Approval JONATHAN QUACH
Reinforced Concrete Frame 5/27/2022 Partial Approval JONATHAN QUACH
Deputy Reinf. Concrete 6/27/2022 Conditional Approval ERNESTO CORRAL
Deputy Drilled-In Anchors 8/31/2022 Conditional Approval JONATHAN QUACH
Deputy Drilled-In Anchors 2/9/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/17/2023 Partial Approval TIMOTHY POWELL
Deputy Reinf. Concrete 2/28/2023 No Access for Inspection TIMOTHY POWELL
Reinforced Concrete Frame 3/13/2023 Partial Approval RONALD JIMENEZ
Final 4/18/2023 Conditional Approval RONALD JIMENEZ
SGSOV-Seismic Gas S/O Valve 4/18/2023 SGSOV Approved RONALD JIMENEZ
Smoke Detectors 4/18/2023 Approved RONALD JIMENEZ
Final 5/8/2023 Permit Finaled RONALD JIMENEZ