350 N BELLINO DR 90272

Certificate Information: 350 N BELLINO DR 90272

Application / Permit
21016-10000-54866
Plan Check / Job No.
B21LA21732
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ALTERATION TO 2-STORY SFD/GARAGE: Remove 1,081 SF rear portion. Add new stairs, modify or add new rear deck. Repair/replace rear exterior wall and foundation as needed. Permit new interior partition walls. Remodel two bathrooms and create new closet. Comply with CI: 186539
Permit Issued
Issued on 5/19/2022
Issuing Office
Metro
Current Status
Issued on 5/19/2022

Permit Application Status History

Submitted 12/1/2021 APPLICANT
Assigned to Plan Check Engineer 12/2/2021 JESSE JIMENEZ
Corrections Issued 12/2/2021 JESSE JIMENEZ
Applicant returned to address corrections 2/17/2022 TSE MING HUANG
Building Plans Picked Up 3/10/2022 APPLICANT
Applicant returned to address corrections 5/16/2022 JOSEPH RAFOLS
Plan Check Approved 5/19/2022 KHUONG TRUONG
Issued 5/19/2022 APPLICANT

Permit Application Clearance Information

Sewer availability Cleared 3/19/2022 STEVEN JIN
Eng Process Fee Ord 176,300 Cleared 5/11/2022 JENSON LEE
Coastal Zone Cleared 5/16/2022 DALIA MOKAYED
Grading Pre-Inspection Cleared 5/16/2022 JESSE JIMENEZ

Contact Information

Contractor Holland Construction & Design Inc; Lic. No.: 878988-B P O BOX 505      PASADENA, CA 91102
Engineer Phillips,, Craig Richard; Lic. No.: C69673 2123 VESTAL AVE      LOS ANGELES, CA 90026

Inspector Information

ROBERT GARTH, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI
JOHN MATTILLO, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI
PEDRO RIVERA, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI
EUSEBIO GUZMAN, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI
PAUL REECE, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI
ANDREW BEELI, (213) 978-4498 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 5/27/2022 Conditional Approval MARIAN PODPORA
BUILDING-Rough-Frame 6/1/2022 Partial Approval RYAN BARNES
ELECTRICAL-Rough 6/1/2022 Corrections Issued RYAN BARNES
Excavation/Setback/Form/Re-Bar 6/1/2022 Approved RYAN BARNES
HVAC-Rough 6/1/2022 Not Ready for Inspection RYAN BARNES
Interior/Exterior Lathing 6/1/2022 Approved RYAN BARNES
PLUMBING-Rough 6/1/2022 Approved RYAN BARNES
BUILDING-Rough-Frame 6/3/2022 Corrections Issued JOHN MATTILLO
Interior/Exterior Lathing 6/3/2022 Partial Approval JOHN MATTILLO
Rough-Elec/Plmb/HVAC 6/3/2022 Approved JOHN MATTILLO
Wood Frame 6/3/2022 Approved JOHN MATTILLO
Drywall Nailing 6/7/2022 Approved RYAN BARNES
Final 6/15/2023 Partial Approval RYAN BARNES
SGSOV-Seismic Gas S/O Valve 6/15/2023 SGSOV Approved RYAN BARNES
Smoke Detectors 6/15/2023 Approved RYAN BARNES