695 S VERMONT AVE 1-255 90005
Certificate Information: 695 S VERMONT AVE 1-255 90005
- Application / Permit
- 21016-10000-53107
- Plan Check / Job No.
- B21LA21267
- Group
- Building
- Type
- Bldg-Addition
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Change of use from office to apartment : Adaptive reuse of an existing 18 story Type 1A constrcution building, including seismic retrofit, renovation of ground level amenities, and new occupied roof deck. Existing parking levels to remain.
- Permit Issued
- Issued on 4/11/2023
- Issuing Office
- Metro
- Current Status
- Issued on 4/11/2023
- Certificate of Occupancy
- Pending More Information
Permit Application Status History
| Submitted | 11/10/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 11/23/2021 | SUEN LIEU |
| Corrections Issued | 12/7/2021 | SUEN LIEU |
| Quality Review Completed | 12/15/2021 | CHARLES CHANG |
| Building Plans Picked Up | 12/22/2021 | APPLICANT |
| Applicant returned to address corrections | 1/21/2022 | SUEN LIEU |
| Applicant returned to address corrections | 1/25/2022 | SUEN LIEU |
| Applicant returned to address corrections | 2/11/2022 | SUEN LIEU |
| Applicant returned to address corrections | 3/1/2022 | SUEN LIEU |
| Applicant returned to address corrections | 6/15/2022 | SUEN LIEU |
| Applicant returned to address corrections | 6/16/2022 | SUEN LIEU |
| Applicant returned to address corrections | 6/24/2022 | SUEN LIEU |
| Applicant returned to address corrections | 7/19/2022 | SUEN LIEU |
| Applicant returned to address corrections | 7/29/2022 | SUEN LIEU |
| Applicant returned to address corrections | 8/10/2022 | SUEN LIEU |
| Applicant returned to address corrections | 8/11/2022 | SUEN LIEU |
| Applicant returned to address corrections | 9/9/2022 | SUEN LIEU |
| Applicant returned to address corrections | 9/19/2022 | SUEN LIEU |
| Applicant returned to address corrections | 9/29/2022 | SUEN LIEU |
| Applicant returned to address corrections | 10/19/2022 | SUEN LIEU |
| Applicant returned to address corrections | 10/31/2022 | SUEN LIEU |
| Applicant returned to address corrections | 3/2/2023 | SUEN LIEU |
| Applicant returned to address corrections | 3/22/2023 | SUEN LIEU |
| Applicant returned to address corrections | 3/30/2023 | SUEN LIEU |
| Applicant returned to address corrections | 4/3/2023 | SUEN LIEU |
| Plan Check Approved | 4/4/2023 | SUEN LIEU |
| Issued | 4/11/2023 | APPLICANT |
Permit Application Clearance Information
| Roof/Waste drainage to street | Cleared | 12/28/2021 | CHRISTOPHER ROCHA |
| ZA Case | Cleared | 12/28/2021 | RICHARD REASER |
| Eng Process Fee Ord 176,300 | Cleared | 1/4/2022 | CHRISTOPHER ROCHA |
| Address approval | Cleared | 1/18/2022 | CHRISTOPHER ROCHA |
| Site Plan review | Cleared | 1/20/2022 | RICHARD REASER |
| Historic Resource Verification | Cleared | 1/24/2022 | MAX LODER |
| ZI | Cleared | 1/24/2022 | DAVID URITA |
| Sewer availability | Cleared | 2/3/2022 | CHRISTOPHER ROCHA |
| Work Adjacent to Public Way | Cleared | 2/4/2022 | JOSE RODRIGUEZ |
| Fire Marshal Fire Life Safety | Cleared | 11/1/2022 | WILLIAM JOHNS |
| Green Code | Cleared | 11/3/2022 | AARON COSTA |
| DAS Clearance | Cleared | 11/10/2022 | SUEN LIEU |
Contact Information
| Architect | Rockefeller,, Darrell S; Lic. No.: C14927 | 620 24TH PLACE HERMOSA BEACH, CA 90254 |
| Contractor | Philmont Management Inc; Lic. No.: 808686-B | 3450 WILSHIRE BLVD #850 LOS ANGELES, CA 90010 |
| Engineer | Funk,, David Lyle; Lic. No.: S5421 | 319 MAIN STREET EL SEGUNDO, CA 90245 |
| Engineer | Tang,, Stanley Siu Kei; Lic. No.: C56178 | 1105 N AVON STREET BURBANK, CA 91505 |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Light Gage Steel Frame | 4/19/2023 | Partial Inspection | KATY RAMIREZ |
| Pre-Inspection | 4/19/2023 | Partial Inspection | KATY RAMIREZ |
| Deputy Fireproofing | 4/25/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Drilled-In Anchors | 5/16/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Drilled-In Anchors | 5/17/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 5/30/2023 | Approved | RAMAZANALI ALMASI |
| Structural Steel Frame | 5/30/2023 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Footing/Foundation/Slab | 7/18/2023 | Corrections Issued | KATY RAMIREZ |
| Green Building Rough | 7/18/2023 | Not Ready for Inspection | KATY RAMIREZ |
| Light Gage Steel Frame | 7/28/2023 | Partial Approval | NICK DANERI |
| Drywall Nailing | 8/3/2023 | Partial Inspection | KATY RAMIREZ |
| Light Gage Steel Frame | 8/3/2023 | Partial Inspection | KATY RAMIREZ |
| Light Gage Steel Frame | 8/16/2023 | Partial Inspection | KATY RAMIREZ |
| Light Gage Steel Frame | 8/21/2023 | Partial Approval | TIMOTHY POWELL |
| Insulation | 8/30/2023 | Partial Approval | KATY RAMIREZ |
| Insulation | 9/13/2023 | Partial Inspection | KATY RAMIREZ |
| Deputy Fireproofing | 9/28/2023 | Conditional Approval | KATY RAMIREZ |
| Insulation | 10/24/2023 | Partial Approval | JACOB MYERS |
| Deputy Steel/Welding | 10/30/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 10/31/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/8/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/9/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 11/13/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/14/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/15/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/17/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/20/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/21/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 11/28/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 11/29/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 11/30/2023 | Conditional Approval | KATY RAMIREZ |
| Deputy Steel/Welding | 12/1/2023 | Conditional Approval | KATY RAMIREZ |
| Structural Steel Frame | 12/1/2023 | Partial Inspection | KATY RAMIREZ |
| Insulation | 12/7/2023 | Partial Approval | KATY RAMIREZ |
| Light Gage Steel Frame | 12/12/2023 | Partial Approval | RICARDO ROBLES |
| Insulation | 12/20/2023 | Partial Approval | KATY RAMIREZ |
| Light Gage Steel Frame | 12/26/2023 | Partial Inspection | JEROME BLACKWOOD |
| Structural Steel Frame | 12/26/2023 | Partial Inspection | JEROME BLACKWOOD |
| Insulation | 1/3/2024 | Partial Approval | KATY RAMIREZ |
| Light Gage Steel Frame | 1/3/2024 | Partial Approval | KATY RAMIREZ |
| Insulation | 1/5/2024 | Partial Approval | KATY RAMIREZ |
| Insulation | 1/8/2024 | Partial Approval | KATY RAMIREZ |
| Drywall Nailing | 1/19/2024 | Partial Inspection | KATY RAMIREZ |
| Structural Steel Frame | 1/19/2024 | Partial Inspection | KATY RAMIREZ |
| Drywall Nailing | 1/24/2024 | Partial Approval | KATY RAMIREZ |
| Structural Steel Frame | 2/2/2024 | Partial Approval | KATY RAMIREZ |
| Special/Order Compliance | 2/8/2024 | Partial Inspection | KATY RAMIREZ |
| Structural Steel Frame | 2/8/2024 | Partial Inspection | KATY RAMIREZ |
| Light Gage Steel Frame | 2/12/2024 | Corrections Issued | KATY RAMIREZ |
| Insulation | 2/15/2024 | Partial Approval | KATY RAMIREZ |
| Structural Steel Frame | 2/16/2024 | Partial Approval | RONALD JIMENEZ |
| Light Gage Steel Frame | 2/23/2024 | Partial Approval | RICARDO ROBLES |
| Structural Steel Frame | 2/23/2024 | Partial Approval | RICARDO ROBLES |
| Insulation | 2/29/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 3/6/2024 | Partial Approval | LUIS CCAMACHO |
| Structural Steel Frame | 3/6/2024 | Partial Approval | LUIS CCAMACHO |
| Insulation | 3/13/2024 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 3/13/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 3/20/2024 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 3/20/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 3/29/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 4/11/2024 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 4/12/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 4/17/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 4/19/2024 | Partial Approval | RAMAZANALI ALMASI |
| Insulation | 4/30/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 4/30/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Structural Steel Frame | 4/30/2024 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 4/30/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Insulation | 5/6/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 5/6/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 5/7/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 5/14/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 5/14/2024 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 5/14/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 5/21/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Structural Steel Frame | 5/21/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 5/22/2024 | Partial Approval | LUIS CCAMACHO |
| Insulation | 5/22/2024 | Partial Approval | LUIS CCAMACHO |
| Structural Steel Frame | 5/22/2024 | Partial Approval | LUIS CCAMACHO |
| Light Gage Steel Frame | 5/24/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 5/31/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 6/4/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 6/10/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 6/13/2024 | Partial Inspection | JEROME BLACKWOOD |
| Insulation | 6/18/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 6/28/2024 | Partial Approval | TIMOTHY POWELL |
| Light Gage Steel Frame | 8/5/2024 | Partial Approval | LUIS CCAMACHO |
| Insulation | 8/12/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 8/22/2024 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 8/22/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 8/28/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/6/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 9/11/2024 | Partial Approval | LUIS CCAMACHO |
| Green Building Rough | 9/13/2024 | Partial Approval | ALFREDO LOPEZ |
| Reinforced Concrete Frame | 9/13/2024 | Partial Approval | ALFREDO LOPEZ |
| Insulation | 9/16/2024 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 9/16/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/25/2024 | Partial Approval | RONALD JIMENEZ |
| Green Building Rough | 9/27/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Reinforced Concrete Frame | 9/27/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 10/4/2024 | Partial Approval | PAUL BAZERKANIAN |
| Insulation | 10/10/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 10/17/2024 | Partial Approval | RAMAZANALI ALMASI |
| Light Gage Steel Frame | 10/17/2024 | Partial Approval | RAMAZANALI ALMASI |
| Special/Order Compliance | 10/29/2024 | Partial Inspection | JEROME BLACKWOOD |
| Structural Steel Frame | 10/29/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 11/1/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 11/6/2024 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 11/18/2024 | Partial Inspection | RAFAEL CORTES |
| Light Gage Steel Frame | 11/18/2024 | Not Ready for Inspection | RAFAEL CORTES |
| Drywall Nailing | 11/21/2024 | Partial Approval | JEROME BLACKWOOD |
| Green Building Rough | 11/25/2024 | Partial Approval | JEROME BLACKWOOD |
| Reinforced Concrete Frame | 11/25/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/3/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/5/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/9/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/9/2024 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/11/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 12/12/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/17/2024 | Partial Inspection | JEROME BLACKWOOD |
| Green Building Rough | 12/17/2024 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 12/17/2024 | Partial Approval | JEROME BLACKWOOD |
| Reinforced Concrete Frame | 12/17/2024 | Partial Approval | JEROME BLACKWOOD |
| Deputy Steel/Welding | 12/19/2024 | Approved | JEROME BLACKWOOD |
| Drywall Nailing | 12/19/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/24/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 1/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 1/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 1/13/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 1/13/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 1/15/2025 | Partial Approval | RAMAZANALI ALMASI |
| Insulation | 2/5/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 2/14/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 2/18/2025 | Partial Inspection | ALFREDO LOPEZ |
| Insulation | 2/19/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 2/25/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 2/27/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 2/28/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 2/28/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 3/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 3/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 3/14/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 3/17/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 3/24/2025 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 4/1/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 4/7/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 4/9/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 4/11/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 4/11/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 4/15/2025 | Partial Approval | JEROME BLACKWOOD |
| Deputy Steel/Welding | 4/24/2025 | Approved | JEROME BLACKWOOD |
| Structural Steel Frame | 4/24/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 4/25/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 4/29/2025 | Partial Approval | ALFREDO LOPEZ |
| Light Gage Steel Frame | 5/30/2025 | No Access for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 6/4/2025 | Partial Approval | PAUL BAZERKANIAN |
| Footing/Foundation/Slab | 6/6/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 6/9/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 7/14/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 7/24/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 7/28/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/8/2025 | Partial Approval | JOEY BUCHANAN |
| Drywall Nailing | 8/19/2025 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 8/19/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/22/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Green Building Rough | 8/25/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Reinforced Concrete Frame | 8/25/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/2/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 9/2/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/10/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 9/16/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 9/19/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 9/22/2025 | Partial Approval | JEROME BLACKWOOD |
| Interior/Exterior Lathing | 9/23/2025 | Partial Approval | JEROME BLACKWOOD |
| Insulation | 9/24/2025 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 9/24/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| T-Bar Ceiling | 9/26/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 9/30/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 10/7/2025 | Partial Approval | LUIS CCAMACHO |
| Light Gage Steel Frame | 10/7/2025 | Partial Approval | LUIS CCAMACHO |
| Structural Steel Frame | 10/15/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 10/23/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 10/29/2025 | Partial Approval | PAUL BAZERKANIAN |
| T-Bar Ceiling | 11/19/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| T-Bar Ceiling | 11/21/2025 | Corrections Issued | DARRYL ARNOLD |
| T-Bar Ceiling | 11/26/2025 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 12/2/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/4/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| T-Bar Ceiling | 12/4/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 12/8/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/9/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/10/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/11/2025 | Partial Approval | JEROME BLACKWOOD |
| Interior/Exterior Lathing | 12/12/2025 | Not Ready for Inspection | RONALD JIMENEZ |
| T-Bar Ceiling | 12/12/2025 | Partial Approval | RONALD JIMENEZ |
| Interior/Exterior Lathing | 12/15/2025 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 12/15/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/16/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/16/2025 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 12/16/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/17/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/18/2025 | Partial Approval | PAUL BAZERKANIAN |
| Light Gage Steel Frame | 12/18/2025 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 12/22/2025 | Not Ready for Inspection | JEROME BLACKWOOD |
| Drywall Nailing | 12/23/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/26/2025 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 12/26/2025 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 12/29/2025 | Partial Approval | PAUL BAZERKANIAN |
| Light Gage Steel Frame | 12/30/2025 | Partial Approval | MARTIN TAVITIAN |
| Drywall Nailing | 12/31/2025 | Partial Approval | MARTIN TAVITIAN |
| Light Gage Steel Frame | 12/31/2025 | Partial Approval | MARTIN TAVITIAN |
| Drywall Nailing | 1/5/2026 | Partial Approval | RONALD JIMENEZ |
| Light Gage Steel Frame | 1/5/2026 | Not Ready for Inspection | RONALD JIMENEZ |
| Special/Order Compliance | 1/5/2026 | Partial Approval | SCOTT SOBEL |
| Drywall Nailing | 1/7/2026 | Partial Approval | LUIS CCAMACHO |
| Light Gage Steel Frame | 1/7/2026 | Partial Approval | LUIS CCAMACHO |
| Light Gage Steel Frame | 1/9/2026 | Partial Approval | EDWIN GREGORYONA |
| Drywall Nailing | 1/12/2026 | Partial Approval | PAUL BAZERKANIAN |
| Special/Order Compliance | 1/12/2026 | Partial Inspection | REGINA MENDEZ |
| Drywall Nailing | 1/15/2026 | Partial Approval | RAFAEL CORTES |
| Light Gage Steel Frame | 1/15/2026 | Partial Approval | RAFAEL CORTES |
| Special/Order Compliance | 1/16/2026 | Partial Inspection | REGINA MENDEZ |
| T-Bar Ceiling | 1/16/2026 | Partial Approval | PAUL BAZERKANIAN |
| Drywall Nailing | 1/20/2026 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 1/20/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 1/22/2026 | Partial Approval | LARRY ARNICK |
| Light Gage Steel Frame | 1/23/2026 | Partial Approval | MARTIN TAVITIAN |
| T-Bar Ceiling | 1/23/2026 | Partial Approval | MARTIN TAVITIAN |
| Light Gage Steel Frame | 1/27/2026 | Corrections Issued | DARRYL ARNOLD |
| Drywall Nailing | 1/28/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 1/30/2026 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 2/4/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/5/2026 | Partial Approval | REGINA MENDEZ |
| Interior/Exterior Lathing | 2/6/2026 | Partial Approval | REGINA MENDEZ |
| Light Gage Steel Frame | 2/9/2026 | Partial Approval | REGINA MENDEZ |
| Excavation/Setback/Form/Re-Bar | 2/10/2026 | Partial Approval | REGINA MENDEZ |
| Drywall Nailing | 2/11/2026 | Partial Approval | REGINA MENDEZ |
| Interior/Exterior Lathing | 2/13/2026 | Conditional Approval | DARRYL ARNOLD |
| Light Gage Steel Frame | 2/13/2026 | Not Ready for Inspection | DARRYL ARNOLD |
| Light Gage Steel Frame | 2/17/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 2/20/2026 | Partial Approval | JEROME BLACKWOOD |
| T-Bar Ceiling | 2/25/2026 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 2/26/2026 | Partial Approval | REGINA MENDEZ |
| Excavation/Setback/Form/Re-Bar | 3/4/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 3/5/2026 | Partial Approval | JEROME BLACKWOOD |
| Light Gage Steel Frame | 3/6/2026 | Not Ready for Inspection | DARRYL ARNOLD |
| Drywall Nailing | 3/10/2026 | Partial Approval | ALFREDO LOPEZ |
| Light Gage Steel Frame | 3/11/2026 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 3/13/2026 | Partial Approval | PAUL BAZERKANIAN |
| Light Gage Steel Frame | 3/18/2026 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 3/24/2026 | Partial Approval | JEROME BLACKWOOD |
| Structural Steel Frame | 3/27/2026 | Partial Approval | JEROME BLACKWOOD |