1930 N TAMARIND AVE 90068

Certificate Information: 1930 N TAMARIND AVE 90068

Application / Permit
21016-10000-47907
Plan Check / Job No.
B21LA20290
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
SOFT STORY RETROFIT AS PER LABC CH. 93. INSTALL TWO (2) SCCS COLUMNS IN FRONT GARAGE
Permit Issued
Issued on 4/15/2022
Issuing Office
Current Status
CofC Issued on 12/26/2023

Permit Application Status History

Submitted 10/28/2021 APPLICANT
Assigned to Plan Check Engineer 11/23/2021 BIDYUT RATH
Corrections Issued 12/6/2021 BIDYUT RATH
Quality Review Completed 12/8/2021 HANS SANTIAGO
Applicant returned to address corrections 3/9/2022 BIDYUT RATH
Plan Check Approved 3/11/2022 BIDYUT RATH
Issued 4/15/2022 APPLICANT
Building Plans Picked Up 4/19/2022 APPLICANT
OK for CofC 3/24/2023 VAHE KELEDJIAN
OK to Issue CofC 3/24/2023 VAHE KELEDJIAN
CofC Issued 12/26/2023 VAHE KELEDJIAN
CofC Issued 12/26/2023 WINSTON DUNNING

Permit Application Clearance Information

Tenant Habitability Plan Cleared 3/25/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Quakestrong; Lic. No.: 1037437-B 1213 LA BREA AVENUE      LOS ANGELES, CA 90019
Engineer Bartelle,, Kristofer Grimm; Lic. No.: C84617 19900 ACRE ST      LOS ANGELES, CA 91324

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/2/2022 Conditional Approval BRUCE CAMPBELL
Pre-Inspection 11/15/2022 Corrections Issued DARRYL ARNOLD
Wood Frame 12/20/2022 Conditional Approval VAHE KELEDJIAN
Deputy Wood Construction 12/28/2022 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 1/18/2023 Conditional Approval BRUCE CAMPBELL
Deputy Reinf. Concrete 1/19/2023 Conditional Approval BRUCE CAMPBELL
Footing/Foundation/Slab 1/25/2023 Corrections Issued VAHE KELEDJIAN
Structural Steel Frame 1/25/2023 Not Ready for Inspection VAHE KELEDJIAN
Wood Frame 1/25/2023 Not Ready for Inspection VAHE KELEDJIAN
Footing/Foundation/Slab 1/27/2023 Not Ready for Inspection VAHE KELEDJIAN
Structural Steel Frame 1/27/2023 Not Ready for Inspection VAHE KELEDJIAN
Wood Frame 1/27/2023 Not Ready for Inspection VAHE KELEDJIAN
Footing/Foundation/Slab 1/31/2023 Not Ready for Inspection VAHE KELEDJIAN
Structural Steel Frame 1/31/2023 Not Ready for Inspection VAHE KELEDJIAN
Wood Frame 1/31/2023 Not Ready for Inspection VAHE KELEDJIAN
Footing/Foundation/Slab 2/3/2023 Partial Inspection VAHE KELEDJIAN
Structural Steel Frame 2/3/2023 Partial Inspection VAHE KELEDJIAN
Wood Frame 2/3/2023 Partial Inspection VAHE KELEDJIAN
Footing/Foundation/Slab 2/10/2023 Conditional Approval JAIME RIOS
Deputy Reinf. Concrete 3/6/2023 Conditional Approval JAIME RIOS
Interior/Exterior Lathing 3/8/2023 Approved VAHE KELEDJIAN
Final 3/14/2023 Not Ready for Inspection VAHE KELEDJIAN
SGSOV-Seismic Gas S/O Valve 3/14/2023 SGSOV Approved VAHE KELEDJIAN
Smoke Detectors 3/14/2023 Approved VAHE KELEDJIAN
Final 3/16/2023 Partial Inspection VAHE KELEDJIAN
Final 3/24/2023 OK for CofC VAHE KELEDJIAN