1133 S DANIELS DR 90035

Certificate Information: 1133 S DANIELS DR 90035

Application / Permit
21016-10000-39204
Plan Check / Job No.
X21LA15087
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Windows (13) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Kitchen (1) / Bathroom (3) remodel for residential buildings (no structural changes). MEPs included
Permit Issued
Issued on 11/2/2021
Issuing Office
Current Status
Permit Finaled on 9/14/2022

Permit Application Status History

Issued 11/2/2021 APPLICANT
Permit Finaled 9/14/2022 ANDREW NAVE

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Nittay Inc; Lic. No.: 1033506-B 17941 VENTURA BLVD #204      ENCINO, CA 91316

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Rough-Elec/Plmb/HVAC 6/22/2022 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 6/27/2022 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 6/27/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 6/27/2022 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 6/29/2022 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 6/29/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 6/29/2022 Not Ready for Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 7/1/2022 Not Ready for Inspection EVAN COOPER
PLUMBING-Rough 7/1/2022 Not Ready for Inspection EVAN COOPER
BUILDING-Rough-Frame 7/5/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 7/5/2022 Approved KEVIN SARGSYAN
Shower Pan 7/5/2022 Approved KEVIN SARGSYAN
Insulation 7/8/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 7/8/2022 Partial Approval KEVIN SARGSYAN
Drywall Nailing 7/14/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 7/15/2022 Approved KEVIN SARGSYAN
Final 9/14/2022 Permit Finaled ANDREW NAVE
SGSOV-Seismic Gas S/O Valve 9/14/2022 SGSOV Approved ANDREW NAVE
Smoke Detectors 9/14/2022 Approved ANDREW NAVE