8119 S KENYON AVE 90045

Certificate Information: 8119 S KENYON AVE 90045

Application / Permit
21016-10000-38014
Plan Check / Job No.
B21LA19211
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT EXISTING DETACHED GARAGE TO ADU PER GCS 65852.2(e)(1)(A)
Permit Issued
Issued on 2/8/2022
Issuing Office
Current Status
CofO Issued on 7/28/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/13/2021 APPLICANT
Assigned to Plan Check Engineer 10/15/2021 CRYSTEL MAALOUF
Corrections Issued 10/18/2021 CRYSTEL MAALOUF
Plan Check Approved 2/2/2022 CRYSTEL MAALOUF
Issued 2/8/2022 APPLICANT
CofO in Progress 7/21/2022 EVAN COOPER
Permit Finaled 7/28/2022 DANIEL ORRANTE
CofO Issued 7/28/2022 DANIEL ORRANTE
Permit Finaled 7/28/2022 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 10/22/2021 HISASHI KOBAYAKAWA
Sewer availability Cleared 10/22/2021 HISASHI KOBAYAKAWA
Eng Process Fee Ord 176,300 Cleared 10/25/2021 HISASHI KOBAYAKAWA
Specific Plan Cleared 11/9/2021 PEDRO AYALA
Construction near power lines Cleared 1/22/2022 RIDWAN HARDY
Construction within easement Cleared 1/22/2022 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Saiyadian, Sarnaghi, Tomik; Lic. No.: C89129 1171 JUSTIN AVE APT 3      GLENDALE, CA 91201

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 3/7/2022 Corrections Issued ANDREW NAVE
Excavation/Setback/Form/Re-Bar 3/24/2022 Approved BOBBY KEY
Footing/Foundation/Slab 3/24/2022 Approved BOBBY KEY
PLUMBING-Rough 4/28/2022 Approved BOBBY KEY
Sewer 4/28/2022 Approved BOBBY KEY
ELECTRICAL-Rough 5/2/2022 Approved JESUS RODRIGUEZ
HVAC-Rough 5/2/2022 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 5/4/2022 Corrections Issued BOBBY KEY
Interior/Exterior Lathing 5/4/2022 Not Ready for Inspection BOBBY KEY
BUILDING-Rough-Frame 5/9/2022 Approved BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 5/9/2022 Approved BOBBY KEY
Green Building Rough 5/12/2022 Approved BOBBY KEY
Insulation 5/12/2022 Not Ready for Inspection BOBBY KEY
Interior/Exterior Lathing 5/12/2022 Partial Approval BOBBY KEY
Insulation 5/13/2022 Approved BOBBY KEY
Drywall Nailing 5/17/2022 Conditional Approval JESUS RODRIGUEZ
Interior/Exterior Lathing 5/18/2022 Partial Approval RICHARD STEINBACH
Shower Pan 5/18/2022 Approved RICHARD STEINBACH
Final 6/29/2022 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 6/29/2022 SGSOV Not Ready BOBBY KEY
Smoke Detectors 6/29/2022 Approved BOBBY KEY
Final 7/12/2022 Corrections Issued BOBBY KEY
SGSOV-Seismic Gas S/O Valve 7/12/2022 SGSOV Not Ready BOBBY KEY
Final 7/18/2022 Corrections Issued JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 7/18/2022 SGSOV Not Ready JESUS RODRIGUEZ
Final 7/19/2022 Corrections Issued JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 7/19/2022 SGSOV Not Ready JESUS RODRIGUEZ
Final 7/21/2022 OK to Issue CofO EVAN COOPER
SGSOV-Seismic Gas S/O Valve 7/21/2022 SGSOV Approved EVAN COOPER