16145 W ALCIMA AVE 90272

Certificate Information: 16145 W ALCIMA AVE 90272

Application / Permit
21016-10000-34281
Plan Check / Job No.
B21LA18654
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED REMODEL TO EXISTING SFD. WORK INLCUDES INTERIOR/EXTERIOR DEMOLITION, WINDOW/DOOR CHANGEOUT/ KTICHEN/BATHROOM REMODEL, AND NEW DECK IN FRONT OF SFD.
Permit Issued
Issued on 5/22/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 10/14/2025

Permit Application Status History

Submitted 10/4/2021 APPLICANT
Assigned to Plan Check Engineer 11/4/2021 MICHAEL LOPEZ
Corrections Issued 11/9/2021 MICHAEL LOPEZ
Quality Review Completed 11/10/2021 KEN GILL
Building Plans Picked Up 11/22/2021 APPLICANT
Applicant returned to address corrections 12/7/2022 CRYSTEL MAALOUF
Plan Check Approved 1/10/2023 CRYSTEL MAALOUF
Issued 5/22/2023 APPLICANT
Permit Finaled 10/9/2025 KENNETH NAGLE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/10/2023 CRYSTEL MAALOUF

Contact Information

Contractor B M L Quality Construction Inc; Lic. No.: 1025547-B 9467 CIMMARON COURT      FONTANA, CA 92335
Engineer Mohammadi,, Saeid; Lic. No.: C82330 17412 VENTUTRA BLVD 21      ENCINO, CA 91316

Inspector Information

DANIEL VERA, (213) 577-9924 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/24/2023 Partial Approval OGANES TARAKHCHYAN
Deputy Drilled-In Anchors 9/27/2023 Conditional Approval EVAN COOPER
BUILDING-Rough-Frame 10/25/2023 Partial Approval EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 10/25/2023 Partial Approval EVAN COOPER
Footing/Foundation/Slab 10/25/2023 Partial Approval EVAN COOPER
ELECTRICAL-Rough 11/29/2023 Corrections Issued EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 11/29/2023 Partial Approval EVAN COOPER
HVAC-Rough 11/29/2023 Corrections Issued EVAN COOPER
PLUMBING-Rough 11/29/2023 Approved EVAN COOPER
Underground Mechanical 11/29/2023 Approved EVAN COOPER
BUILDING-Rough-Frame 12/14/2023 Approved EVAN COOPER
HVAC-Rough 12/14/2023 Approved EVAN COOPER
Interior/Exterior Lathing 12/14/2023 Partial Approval EVAN COOPER
Wood Frame 12/14/2023 Approved EVAN COOPER
Insulation 12/26/2023 Approved EVAN COOPER
Drywall Nailing 12/29/2023 Approved EVAN COOPER
Shower Pan 1/5/2024 Approved EVAN COOPER
Interior/Exterior Lathing 1/23/2024 Approved EVAN COOPER
Final 6/12/2025 Corrections Issued STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 6/12/2025 SGSOV Not Ready STEPHANIE SWANSON
Smoke Detectors 6/12/2025 Approved STEPHANIE SWANSON
Final 10/9/2025 Permit Finaled KENNETH NAGLE
SGSOV-Seismic Gas S/O Valve 10/9/2025 SGSOV Approved KENNETH NAGLE