637 E PALMS BLVD 90291

Certificate Information: 637 E PALMS BLVD 90291

Application / Permit
21016-10000-30724
Plan Check / Job No.
B21LA17694
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR AND EXTERIOR REMODEL TO EXISTING SFD (FRONT)
Permit Issued
Issued on 5/4/2022
Issuing Office
Current Status
Permit Finaled on 4/4/2024

Permit Application Status History

Submitted 9/22/2021 APPLICANT
Assigned to Plan Check Engineer 10/28/2021 STARR CHEN
Corrections Issued 11/2/2021 STARR CHEN
Quality Review Completed 11/9/2021 TEODORO DIAZ RODRIGUEZ
Applicant returned to address corrections 3/7/2022 STARR CHEN
Plan Check Approved 4/6/2022 STARR CHEN
Issued 5/4/2022 APPLICANT
Building Plans Picked Up 5/11/2022 APPLICANT
Permit Finaled 4/3/2024 HERBERT GIRON

Permit Application Clearance Information

Sewer availability Cleared 1/7/2022 JOSE RODRIGUEZ
Eng Process Fee Ord 176,300 Cleared 1/21/2022 JOSE RODRIGUEZ
Specific Plan Cleared 2/1/2022 SIENNA KUO
Miscellaneous Cleared 2/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 2/4/2022 MAXFIELD VERMY
Miscellaneous Cleared 2/4/2022 MAXFIELD VERMY
Coastal Zone Cleared 3/30/2022 MAXFIELD VERMY

Contact Information

Architect , ; Lic. No.: C35571 720 HAMPTON DRIVE      VENICE, CA 90291
Contractor Vallernaud Construction Inc; Lic. No.: 1025929-B 11826 ALLASEBA DR      LOS ANGELES, CA 90066
Engineer Tuchscher,, James Todd; Lic. No.: C77649 5503 E 2ND ST      LONG BEACH, CA 90803

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/6/2022 Not Ready for Inspection MICHAEL PELHAM
Pre-Inspection 7/14/2022 Partial Inspection DAVID FEILER
Footing/Foundation/Slab 9/1/2022 Approved DAVID FEILER
Floor/Roof Diaphrgm/Shear Wall 10/6/2022 Partial Approval DAVID FEILER
Sewer 2/13/2023 Partial Approval EVAN COOPER
ELECTRICAL-Rough 7/5/2023 Approved EVAN COOPER
HVAC-Rough 7/6/2023 Approved EVAN COOPER
PLUMBING-Rough 7/12/2023 Not Ready for Inspection EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 7/21/2023 Partial Approval EVAN COOPER
PLUMBING-Rough 7/21/2023 Approved EVAN COOPER
BUILDING-Rough-Frame 8/4/2023 Partial Approval EVAN COOPER
Wood Frame 8/4/2023 Partial Approval EVAN COOPER
Deputy Wood Construction 8/24/2023 Conditional Approval HERBERT GIRON
BUILDING-Rough-Frame 8/25/2023 Approved BEN MOLSTAD
Insulation 8/25/2023 Approved BEN MOLSTAD
Interior/Exterior Lathing 8/25/2023 Approved BEN MOLSTAD
Insulation 8/28/2023 Not Ready for Inspection TEMISTOCLES CAAL
Interior/Exterior Lathing 8/28/2023 Not Ready for Inspection TEMISTOCLES CAAL
Drywall Nailing 8/31/2023 Approved HERBERT GIRON
Interior/Exterior Lathing 9/7/2023 Approved TEMISTOCLES CAAL
Gas Test 3/18/2024 Approved HERBERT GIRON
PLUMBING-Final 3/18/2024 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 3/18/2024 SGSOV Approved HERBERT GIRON
ELECTRICAL-Final 3/27/2024 Approved HERBERT GIRON
Service/Power Release 3/27/2024 Approved HERBERT GIRON
HVAC-Final 3/28/2024 Approved HERBERT GIRON
Smoke Detectors 3/28/2024 Approved HERBERT GIRON
Final 4/3/2024 Permit Finaled HERBERT GIRON