3461 S SAINT SUSAN PL 90066

Certificate Information: 3461 S SAINT SUSAN PL 90066

Application / Permit
21016-10000-24067
Plan Check / Job No.
X21LA12643
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1-Kitchen 3-bathroom remodel for residential buildings (no structural changes). Including HVAC, Electrical, Plumbing Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___20___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B ( Including attached garage )
Permit Issued
Issued on 9/7/2021
Issuing Office
Current Status
Permit Finaled on 4/18/2022

Permit Application Status History

Issued 9/7/2021 APPLICANT
Permit Finaled 4/18/2022 EVAN COOPER

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Pacific Prestige Properties Inc; Lic. No.: 1007518-B 18 HELIOPSIS      RANCHO SANTA MARGARITA, CA 92688

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 11/18/2021 Approved JOHNNY MIRANDA
ELECTRICAL-Rough 11/22/2021 Corrections Issued OGANES TARAKHCHYAN
PLUMBING-Rough 11/22/2021 Corrections Issued OGANES TARAKHCHYAN
ELECTRICAL-Rough 11/30/2021 No Access for Inspection JOHNNY MIRANDA
HVAC-Rough 11/30/2021 No Access for Inspection JOHNNY MIRANDA
PLUMBING-Rough 11/30/2021 No Access for Inspection JOHNNY MIRANDA
ELECTRICAL-Rough 12/3/2021 Conditional Approval JOHNNY MIRANDA
HVAC-Rough 12/3/2021 Approved JOHNNY MIRANDA
Interior/Exterior Lathing 12/3/2021 Approved JOHNNY MIRANDA
PLUMBING-Rough 12/3/2021 Approved JOHNNY MIRANDA
Shower Pan 12/3/2021 Approved JOHNNY MIRANDA
ELECTRICAL-Final 4/18/2022 Approved EVAN COOPER
Final 4/18/2022 Permit Finaled EVAN COOPER
HVAC-Final 4/18/2022 Approved EVAN COOPER
PLUMBING-Final 4/18/2022 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 4/18/2022 SGSOV Approved EVAN COOPER
Smoke Detectors 4/18/2022 Approved EVAN COOPER