11982 W MAYFIELD AVE A 90049
Certificate Information: 11982 W MAYFIELD AVE A 90049
- Application / Permit
- 21016-10000-20432
- Plan Check / Job No.
- X21LA10690
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Kitchen/ (2.5) bathroom remodel for residential buildings (no structural changes). Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturer's recommendations. A HVAC permit is required.
- Permit Issued
- Issued on 8/20/2021
- Issuing Office
- Current Status
- Issued on 8/20/2021
Permit Application Status History
| No Progress | 8/5/2021 | ANGELICA PAIGE |
| Issued | 8/20/2021 | APPLICANT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Viable Construction Inc; Lic. No.: 988073-B | 11301 W OLYMPIC BLVD STE 361 LOS ANGELES, CA 90064 |
Inspector Information
| CASIMIR BRITTON, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
| SHAVONNE ESPINOZA, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 3/16/2022 | Not Ready for Inspection | JOHN DODGE |
| Wood Frame | 7/21/2022 | Partial Approval | SORIN CIRSTOIU |
| Drywall Nailing | 7/29/2022 | Partial Approval | PAUL DAVIDSON |
| Drywall Nailing | 8/9/2022 | Partial Approval | SORIN CIRSTOIU |
| Interior/Exterior Lathing | 8/9/2022 | Approved | SORIN CIRSTOIU |
| Deputy Wood Construction | 8/29/2022 | Conditional Approval | SORIN CIRSTOIU |
| Drywall Nailing | 8/31/2022 | Not Ready for Inspection | DAVID TSAU |
| Wood Frame | 8/31/2022 | Not Ready for Inspection | DAVID TSAU |
| Drywall Nailing | 9/9/2022 | Partial Approval | JEFF BYTHEWAY |
| Wood Frame | 9/9/2022 | Partial Approval | JEFF BYTHEWAY |
| Final | 1/3/2023 | Not Ready for Inspection | PAUL DAVIDSON |
| SGSOV-Seismic Gas S/O Valve | 1/3/2023 | SGSOV Not Ready | PAUL DAVIDSON |
| Final | 1/27/2023 | Partial Inspection | MICHAEL PETRUSKO |
| SGSOV-Seismic Gas S/O Valve | 1/27/2023 | SGSOV Approved | MICHAEL PETRUSKO |
| Smoke Detectors | 1/27/2023 | Approved | MICHAEL PETRUSKO |