8201 S PARK HILL DR 90045

Certificate Information: 8201 S PARK HILL DR 90045

Application / Permit
21016-10000-17818
Plan Check / Job No.
B21LA12920
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL OF 1-STORY SFD TO REPLACE WINDOWS AND INSTALL FOLDING-TYPE GLASS DOORS AND INTERIOR REMODEL. ENCLOSE EXISTING COVERED AREA (114 S.F.) TO ENLARGE ENTRY AND PROVIDE A NEW BEDROOM CLOSET. **SEE COMMENTS**
Permit Issued
Issued on 8/3/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 6/4/2024

Permit Application Status History

Submitted 7/9/2021 APPLICANT
Assigned to Plan Check Engineer 7/21/2021 SINA KHOSRAVI
Corrections Issued 7/22/2021 SINA KHOSRAVI
Plan Check Approved 2/28/2022 SHANGQIN XIE
Building Plans Picked Up 8/31/2022 APPLICANT
No Progress 10/7/2022 GEORGE ALVAREZ
Plan Check Approved 4/7/2023 GEORGE ALVAREZ
Issued 8/3/2023 APPLICANT
Permit Finaled 6/3/2024 BOBBY KEY

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/2/2023 KIRK LINKLATER
Specific Plan Cleared 4/4/2023 JOSHUA JONES

Contact Information

Contractor Castle Construction And Development; Lic. No.: 780873-B 409 PACIFIC COAST HIGHWAY   SUITE 510    REDONDO BEACH, CA 90277
Engineer Armstrong,, Scott Daniel; Lic. No.: C74715 33504 MAGNETITE ST      MENIFEE, CA 92584

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/28/2023 Corrections Issued BOBBY KEY
Footing/Foundation/Slab 8/31/2023 Approved BOBBY KEY
BUILDING-Rough-Frame 9/19/2023 Corrections Issued BOBBY KEY
Insulation 9/19/2023 Not Ready for Inspection BOBBY KEY
METHANE-Rough 9/19/2023 Approved BOBBY KEY
ELECTRICAL-Rough 9/22/2023 Approved BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 9/22/2023 Approved BOBBY KEY
BUILDING-Rough-Frame 9/27/2023 Approved BOBBY KEY
Insulation 9/27/2023 Approved BOBBY KEY
Interior/Exterior Lathing 9/27/2023 Approved BOBBY KEY
Drywall Nailing 10/3/2023 Approved TEMISTOCLES CAAL
Final 6/3/2024 Permit Finaled BOBBY KEY
SGSOV-Seismic Gas S/O Valve 6/3/2024 SGSOV Approved BOBBY KEY
Smoke Detectors 6/3/2024 Approved BOBBY KEY