3926 S GIBRALTAR AVE 90008

Certificate Information: 3926 S GIBRALTAR AVE 90008

Application / Permit
21016-10000-14753
Plan Check / Job No.
B21LA10722
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Eplan : 26215 Soft-Story seismic retrofit per LABC Chapter 93: INSTALL 2 NEW SPECIAL STEEL CANTILEVER COLUMNS
Permit Issued
Issued on 4/27/2022
Issuing Office
Current Status
CofC Issued on 11/30/2022

Permit Application Status History

Submitted 6/8/2021 APPLICANT
Assigned to Plan Check Engineer 7/15/2021 VARAND SARKISIAN
Corrections Issued 7/19/2021 VARAND SARKISIAN
Quality Review Completed 7/26/2021 HANS SANTIAGO
Applicant returned to address corrections 8/18/2021 VARAND SARKISIAN
Plan Check Approved 8/27/2021 VARAND SARKISIAN
Issued 4/27/2022 APPLICANT
OK for CofC 9/16/2022 DARRYL ARNOLD
OK for CofC 9/16/2022 DARRYL ARNOLD
CofC Issued 11/30/2022 WINSTON DUNNING

Permit Application Clearance Information

Tenant Habitability Plan Cleared 4/19/2022 MICHAEL SOTO

Contact Information

Contractor Cal - Quake Construction Inc; Lic. No.: 759817-B 636 NORTH FORMOSA AVENUE      LOS ANGELES, CA 90036
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 743 S SIERRA VISTA AVE C      ALHAMBRA, CA 91801

Inspector Information

DARRYL ARNOLD, (213) 482-0341 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/27/2022 Conditional Approval BRUCE CAMPBELL
Deputy Drilled-In Anchors 6/1/2022 Conditional Approval ERNESTO CORRAL
Excavation/Setback/Form/Re-Bar 6/10/2022 Conditional Approval DARRYL ARNOLD
Structural Steel Frame 6/10/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 6/10/2022 Conditional Approval DARRYL ARNOLD
Interior/Exterior Lathing 8/3/2022 Conditional Approval DARRYL ARNOLD
Final 9/8/2022 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 9/8/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 9/8/2022 Conditional Approval DARRYL ARNOLD
Final 9/15/2022 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 9/15/2022 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 9/15/2022 Conditional Approval DARRYL ARNOLD
Final 9/16/2022 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 9/16/2022 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 9/16/2022 Approved DARRYL ARNOLD