5519 W ROMAINE ST 90038

Certificate Information: 5519 W ROMAINE ST 90038

Application / Permit
21016-10000-14091
Plan Check / Job No.
B21LA10245
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
EXISTING ATTACHED GARAGE CONVERTED TO ADU (ACCESSORY DWELLING UNIT) ON 1ST FLOOR TO (E) TWO STORY APARTMENT BUILDING (3 UNITS). Per GCS 65852.2(e)(1)(C)
Permit Issued
Issued on 2/23/2022
Issuing Office
Current Status
Issued on 2/23/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/2/2021 APPLICANT
Assigned to Plan Check Engineer 6/3/2021 GEORGE ALVAREZ
Corrections Issued 6/4/2021 GEORGE ALVAREZ
Applicant returned to address corrections 8/21/2021 TSE MING HUANG
Plan Check Approved 2/18/2022 KHUONG TRUONG
Issued 2/23/2022 APPLICANT
Building Plans Picked Up 3/1/2022 APPLICANT

Permit Application Clearance Information

Address approval Cleared 6/16/2021 WALLIE JONG
Sewer availability Cleared 6/16/2021 WALLIE JONG
Eng Process Fee Ord 176,300 Cleared 6/17/2021 WALLIE JONG
Tenant Habitability Plan Cleared 8/4/2021 ISMAEL HERNANDEZ

Contact Information

Contractor Dhs Ventures Inc; Lic. No.: 1047699-B 3575 CAHUENGA BLVD #350      LOS ANGELES, CA 90068
Engineer Southerland,, Richard Charles; Lic. No.: C88965 16526 BLACKHAWK ST      GRANADA HILLS, CA 91344

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/1/2022 Conditional Approval SORIN CIRSTOIU
Footing/Foundation/Slab 3/4/2022 No Access for Inspection BRUCE CAMPBELL
Footing/Foundation/Slab 3/11/2022 Approved JONATHAN QUACH
Green Building Rough 8/18/2022 Not Ready for Inspection KATY RAMIREZ
Wood Frame 8/18/2022 Corrections Issued KATY RAMIREZ
Green Building Rough 9/9/2022 No Access for Inspection KATY RAMIREZ
Wood Frame 9/9/2022 No Access for Inspection KATY RAMIREZ
Green Building Rough 9/14/2022 Conditional Approval DARRYL ARNOLD
Wood Frame 9/14/2022 Conditional Approval DARRYL ARNOLD
Pre-Inspection 11/10/2022 Not Ready for Inspection JONATHAN QUACH
Green Building Rough 4/26/2023 Not Ready for Inspection LARRY ARNICK
Wood Frame 4/26/2023 Not Ready for Inspection LARRY ARNICK
Green Building Rough 6/22/2023 Not Ready for Inspection TIMOTHY POWELL
Insulation 6/22/2023 Partial Inspection TIMOTHY POWELL
Wood Frame 6/22/2023 Corrections Issued TIMOTHY POWELL
Green Building Rough 8/16/2023 Not Ready for Inspection TIMOTHY POWELL
Wood Frame 8/16/2023 Not Ready for Inspection TIMOTHY POWELL
Insulation 10/6/2023 Approved RICARDO ROBLES
Final 2/13/2024 Not Ready for Inspection RAFAEL CORTES
Green Building Final 2/13/2024 Not Ready for Inspection RAFAEL CORTES
Green Building Rough 2/13/2024 Approved RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 2/13/2024 SGSOV Not Ready RAFAEL CORTES
Smoke Detectors 2/13/2024 Not Ready for Inspection RAFAEL CORTES
Wood Frame 2/13/2024 Approved RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 3/13/2024 SGSOV Not Ready RAFAEL CORTES
Final 4/2/2024 Partial Inspection TIMOTHY POWELL
Green Building Final 4/2/2024 Not Ready for Inspection TIMOTHY POWELL
SGSOV-Seismic Gas S/O Valve 4/2/2024 SGSOV Approved TIMOTHY POWELL
Smoke Detectors 4/2/2024 Approved TIMOTHY POWELL