5317 E YORK BLVD 90042

Certificate Information: 5317 E YORK BLVD 90042

Application / Permit
21016-10000-13400
Plan Check / Job No.
B21LA09761
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(18) Trade Technical or Occupational School
Work Description
Interior remodel of a 1 story, Type III, auto repair shop URM building to a 2 story, Type IIIB, trade school with auditorium/stage, a classroom, café with indoor seating limited to 9. "HOURS OF OPERATION PER ZA-2021-0442--CUB (item # 7): 8:00 a.m to 12: 00 a.m sundary through Thursday, and 8:00 a.m. to 2:00 a.m. Friday and Saturday."
Permit Issued
Issued on 2/28/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 12/8/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 5/26/2021 APPLICANT
Assigned to Plan Check Engineer 6/17/2021 KESETE HAREGOT
Disabled Access Plans Picked Up 6/24/2021 APPLICANT
Corrections Issued 6/26/2021 KESETE HAREGOT
Quality Review Completed 7/1/2021 FARUK SEZER
Applicant returned to address corrections 9/15/2021 KESETE HAREGOT
Green Plans Picked Up 11/29/2021 APPLICANT
Applicant returned to address corrections 12/20/2021 KESETE HAREGOT
Applicant returned to address corrections 1/19/2022 KESETE HAREGOT
Applicant returned to address corrections 10/19/2022 KESETE HAREGOT
Plan Check Approved 10/31/2022 KESETE HAREGOT
Issued 2/28/2023 APPLICANT
TCO Issued (Expire Date: 01-03-2026) 7/7/2025 ERNESTO CORRAL
CofO in Progress 12/2/2025 RONALD JIMENEZ
Permit Finaled 12/8/2025 ERNESTO CORRAL
CofO Issued 12/8/2025 ERNESTO CORRAL
Permit Finaled 12/8/2025 ERNESTO CORRAL

Permit Application Clearance Information

Green Code Cleared 11/29/2021 AARON COSTA
Eng Process Fee Ord 176,300 Cleared 2/17/2022 JEANETTE VONG
Sewer availability Cleared 2/17/2022 JEANETTE VONG
ZA Case Cleared 2/23/2022 LOUIS ORTEGA
ZA Case Cleared 2/23/2022 LOUIS ORTEGA
"Q" conditions Cleared 6/24/2022 YINGSHI HUANG
Fire Marshal Fire Life Safety Cleared 8/9/2022 DOMINIQUE MEDINA
ZA Case Cleared 8/18/2022 ANGELA WILLIAMS
DAS Clearance Cleared 9/8/2022 KESETE HAREGOT
Food establishment approval Cleared 10/19/2022 LACDHS APPROVED

Contact Information

Architect Jeevanjee,, Ali Akbar; Lic. No.: C30267 453 S SPRING STREET #1126      LOS ANGELES, CA 90013
Contractor Intension Construction Inc; Lic. No.: 956850-B 5260 W PICO BLVD      LOS ANGELES, CA 90019
Engineer Kathuria,, Deepansh; Lic. No.: S5572 707 WILSHIRE BLVD STE 5100      LOS ANGELES, CA 90017

Inspector Information

SEAN POMISH, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL CORTES, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/16/2023 Partial Inspection RAMAZANALI ALMASI
Pre-Inspection 5/16/2023 Partial Inspection RAMAZANALI ALMASI
Deputy Reinf. Concrete 6/5/2023 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 6/7/2023 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 6/7/2023 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 6/23/2023 Partial Inspection RAMAZANALI ALMASI
Grading Pre-Inspection 6/23/2023 Partial Inspection RAMAZANALI ALMASI
Footing/Foundation/Slab 6/30/2023 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 7/27/2023 Partial Approval RAFAEL CORTES
Deputy Drilled-In Anchors 8/9/2023 Conditional Approval JULIAN CAPUCETTI
Deputy Reinf. Concrete 8/25/2023 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 9/7/2023 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 9/7/2023 Partial Approval RAFAEL CORTES
Pre-Inspection 9/12/2023 Partial Inspection RAMAZANALI ALMASI
Footing/Foundation/Slab 9/26/2023 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Rough 9/26/2023 Not Ready for Inspection RAMAZANALI ALMASI
Structural Steel Frame 9/26/2023 Not Ready for Inspection RAMAZANALI ALMASI
Footing/Foundation/Slab 10/4/2023 Approved RAMAZANALI ALMASI
Deputy Reinf. Concrete 10/6/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 10/12/2023 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 11/7/2023 Conditional Approval RAMAZANALI ALMASI
Floor/Roof Diaphrgm/Shear Wall 12/11/2023 Partial Approval RAMAZANALI ALMASI
Wood Frame 12/11/2023 Not Ready for Inspection RAMAZANALI ALMASI
Deputy Steel/Welding 12/18/2023 Conditional Approval RAMAZANALI ALMASI
Floor/Roof Diaphrgm/Shear Wall 2/13/2024 Approved RONALD JIMENEZ
Deputy Drilled-In Anchors 3/13/2024 Conditional Approval RONALD JIMENEZ
Insulation 3/13/2024 Partial Approval RONALD JIMENEZ
Wood Frame 3/13/2024 Not Ready for Inspection RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 4/9/2024 Not Ready for Inspection RAMAZANALI ALMASI
Insulation 4/9/2024 Not Ready for Inspection RAMAZANALI ALMASI
Reinforced Concrete Frame 4/9/2024 Partial Approval RAMAZANALI ALMASI
Green Building Final 4/22/2024 Not Ready for Inspection RAMAZANALI ALMASI
Insulation 4/22/2024 Not Ready for Inspection RAMAZANALI ALMASI
Light Gage Steel Frame 4/22/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wall Anchors 4/22/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wood Frame 4/22/2024 Not Ready for Inspection RAMAZANALI ALMASI
Drywall Nailing 4/30/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 5/9/2024 Partial Approval RAMAZANALI ALMASI
Insulation 5/9/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wood Frame 5/9/2024 Partial Approval RAMAZANALI ALMASI
Insulation 5/16/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 6/14/2024 Partial Approval RAMAZANALI ALMASI
Insulation 6/14/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 6/18/2024 Partial Approval RAMAZANALI ALMASI
Insulation 6/26/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 6/28/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 7/1/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 7/11/2024 Partial Approval RAMAZANALI ALMASI
Insulation 7/11/2024 Partial Approval RAMAZANALI ALMASI
Wood Frame 7/11/2024 Partial Approval RAMAZANALI ALMASI
Excavation/Setback/Form/Re-Bar 7/16/2024 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 7/16/2024 Partial Approval RONALD JIMENEZ
Insulation 7/16/2024 Approved RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 7/17/2024 Partial Approval RAMAZANALI ALMASI
Wood Frame 7/17/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 7/18/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 7/22/2024 Partial Approval RAMAZANALI ALMASI
Insulation 8/9/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 8/16/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 9/13/2024 Partial Approval RAMAZANALI ALMASI
Drywall Nailing 9/19/2024 Partial Approval RAMAZANALI ALMASI
Wood Frame 10/4/2024 Not Ready for Inspection JEROME BLACKWOOD
Insulation 10/17/2024 Approved RAMAZANALI ALMASI
Drywall Nailing 10/21/2024 Approved RAMAZANALI ALMASI
Pre-Inspection 2/24/2025 Partial Inspection RAMAZANALI ALMASI
Pre-Inspection 2/28/2025 Partial Inspection RAMAZANALI ALMASI
Interior/Exterior Lathing 3/4/2025 Approved RAMAZANALI ALMASI
Final 3/12/2025 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Final 3/12/2025 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Rough 3/12/2025 Approved RAMAZANALI ALMASI
Reinforced Masonry Frame 3/12/2025 Approved RAMAZANALI ALMASI
SGSOV-Seismic Gas S/O Valve 3/12/2025 SGSOV Approved RAMAZANALI ALMASI
Smoke Detectors 3/12/2025 Approved RAMAZANALI ALMASI
Structural Steel Frame 3/12/2025 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Final 3/27/2025 Approved RONALD JIMENEZ
Final 4/23/2025 Not Ready for Inspection RAFAEL CORTES
Pre-Inspection 4/23/2025 Approved RAFAEL CORTES
Final 5/7/2025 No Access for Inspection RAFAEL CORTES
Structural Steel Frame 5/7/2025 No Access for Inspection RAFAEL CORTES
Pre-Inspection 6/9/2025 Approved RONALD JIMENEZ
Final 6/30/2025 OK to Issue CofO RONALD JIMENEZ
Structural Steel Frame 6/30/2025 Approved RONALD JIMENEZ
Final 10/23/2025 Partial Approval PAUL BAZERKANIAN