1260 W 84TH ST 90044

Certificate Information: 1260 W 84TH ST 90044

Application / Permit
21016-10000-13068
Plan Check / Job No.
B21LA09525
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ADDITION, FIRE DAMAGE REPAIR and REMODEL 1-Story SFD. Add [9 x 11.5] Laundry room and Bathroom to rear, increase size of main dwelling to 26 x 32. Existing [6 x 20] front covered porch to remain. Replace damaged rafters, reroof. Replace drywall. Replace windows. Replace kitchen cabinets and counters. Convert original bathroom to two closets.
Permit Issued
Issued on 4/6/2022
Issuing Office
Current Status
Issued on 4/6/2022
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/19/2021 APPLICANT
Assigned to Plan Check Engineer 5/20/2021 JESSE JIMENEZ
Corrections Issued 5/20/2021 JESSE JIMENEZ
Applicant returned to address corrections 7/20/2021 JESSE JIMENEZ
Applicant returned to address corrections 1/4/2022 JESSE JIMENEZ
Applicant returned to address corrections 1/11/2022 AUNG SOE
Plan Check Approved 3/15/2022 JESSE JIMENEZ
Building Plans Picked Up 3/17/2022 APPLICANT
Issued 4/6/2022 APPLICANT

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 1/13/2022 CINDY QI
Eng Process Fee Ord 176,300 Cleared 1/18/2022 CINDY QI

Contact Information

Contractor Service Pro Restoration Inc; Lic. No.: 1013868-B 1055 W 7TH 33RD FLOOR      LOS ANGELES, CA 90017
Engineer Singh,, Jasbir; Lic. No.: C38767 16194 EASTRIDGE CT      CHINO HILLS, CA 91709

Inspector Information

JOHN QUINTANILLA, (213) 792-6055 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 5/17/2022 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 6/14/2022 Approved LILIANA PORTILLO
PLUMBING-Rough 6/14/2022 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 6/17/2022 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 6/17/2022 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/22/2022 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 6/22/2022 Approved LILIANA PORTILLO
HVAC-Rough 6/22/2022 Corrections Issued LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 6/27/2022 Approved LILIANA PORTILLO
HVAC-Rough 6/27/2022 Conditional Approval LILIANA PORTILLO
Insulation 6/27/2022 Approved LILIANA PORTILLO
Drywall Nailing 7/6/2022 Approved LILIANA PORTILLO
Interior/Exterior Lathing 7/6/2022 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 8/15/2022 Conditional Approval LILIANA PORTILLO
Final 8/15/2022 Corrections Issued LILIANA PORTILLO
Green Building Final 8/15/2022 Corrections Issued LILIANA PORTILLO
Green Building Rough 8/15/2022 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 8/15/2022 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 8/15/2022 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 9/13/2022 Approved LILIANA PORTILLO
Final 9/13/2022 Not Ready for Inspection LILIANA PORTILLO
Green Building Final 9/13/2022 Not Ready for Inspection LILIANA PORTILLO
HVAC-Rough 9/13/2022 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/13/2022 SGSOV Approved LILIANA PORTILLO