6801 W HOLLYWOOD BLVD 90028
Certificate Information: 6801 W HOLLYWOOD BLVD 90028
- Application / Permit
- 21016-10000-11844
- Plan Check / Job No.
- B21LA08781
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (16) Retail
- Work Description
- INTERIOR & EXTERIOR T.I & CHANGE OF USE & ADDITION TO (E) SIX (6) STORY MIXED-USE BUILDING :TO INCLUDE REMOVAL & REPLACEMENT OF (E) DECORATIVE ARCHITECTURAL FEATURES & ARTWORK, & CHANGE OF USE FROM (E) NIGHTCLUB & RESTURANT & BALLROOM TO OFFICE AT LEVELS 4 & 5 LEVELS & ADDITION OF 1300 S.F COMMON AREA.
- Permit Issued
- Issued on 9/3/2021
- Issuing Office
- Current Status
- CofO Issued on 6/28/2023
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 5/7/2021 | APPLICANT |
| Disabled Access Plans Picked Up | 5/24/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 5/26/2021 | GARO TELMI |
| Corrections Issued | 6/2/2021 | GARO TELMI |
| Quality Review Completed | 6/15/2021 | MICHAEL PEREZ |
| Applicant returned to address corrections | 7/1/2021 | GARO TELMI |
| Applicant returned to address corrections | 7/12/2021 | GARO TELMI |
| Plan Check Approved | 8/25/2021 | GARO TELMI |
| Issued | 9/3/2021 | APPLICANT |
| Building Plans Picked Up | 9/8/2021 | APPLICANT |
| CofO in Progress | 6/28/2023 | TIMOTHY POWELL |
| CofO Issued | 6/28/2023 | ERNESTO CORRAL |
| Permit Finaled | 6/28/2023 | ERNESTO CORRAL |
Permit Application Clearance Information
| Historic Resource Verification | Cleared | 6/23/2021 | LAMBERT GIESSINGER |
| Miscellaneous | Cleared | 6/23/2021 | JOE LUCKEY |
| ZA Case | Cleared | 6/23/2021 | JOE LUCKEY |
| "D" conditions | Cleared | 6/30/2021 | JOE LUCKEY |
| Redevelopment Project Area | Cleared | 7/6/2021 | GISELLE CORELLA |
| Building over 36-ft | Cleared | 7/9/2021 | CALOSHA APPROVED |
| Eng Process Fee Ord 176,300 | Cleared | 7/12/2021 | CELINA MORENO |
| Miscellaneous | Cleared | 7/15/2021 | GARO TELMI |
| Fire Marshal Fire Life Safety | Cleared | 8/5/2021 | MENOA AGHAJANI |
| DAS Clearance | Cleared | 8/19/2021 | SHINE LIN |
| Green Code | Cleared | 8/19/2021 | GARO TELMI |
| Sewer availability | Cleared | 8/20/2021 | CELINA MORENO |
Contact Information
| Architect | Lilly,, Erin Michelle; Lic. No.: C30225 | 600 W 9TH STREET APT #301 LOS ANGELES, CA 90015 |
| Contractor | O'Neil W E Construction Co Of California; Lic. No.: 494031-B | 909 N PACIFIC COAST HWY STE 400 EL SEGUNDO, CA 90245 |
| Engineer | Volnyy,, Vladimir A; Lic. No.: S4817 | 11342 PALA MESA DR NORTHRIDGE, CA 91326 |
Inspector Information
| TIMOTHY POWELL, (213) 482-0360 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 9/30/2021 | Partial Inspection | SORIN CIRSTOIU |
| Excavation/Setback/Form/Re-Bar | 10/1/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 10/4/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 10/14/2021 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 10/15/2021 | Approved | SORIN CIRSTOIU |
| Excavation/Setback/Form/Re-Bar | 10/20/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 10/26/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 10/29/2021 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 11/2/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 11/3/2021 | Conditional Approval | JONATHAN QUACH |
| Excavation/Setback/Form/Re-Bar | 11/3/2021 | Partial Approval | JONATHAN QUACH |
| Green Building Rough | 11/3/2021 | Not Ready for Inspection | JONATHAN QUACH |
| Reinforced Concrete Frame | 11/3/2021 | Partial Approval | JONATHAN QUACH |
| Deputy Fireproofing | 11/4/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 11/4/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 11/5/2021 | Approved | SORIN CIRSTOIU |
| Deputy Fireproofing | 11/8/2021 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 11/8/2021 | Approved | SORIN CIRSTOIU |
| Deputy Fireproofing | 11/9/2021 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 11/9/2021 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 11/9/2021 | Approved | SORIN CIRSTOIU |
| Drywall Nailing | 11/9/2021 | Partial Approval | SORIN CIRSTOIU |
| Excavation/Setback/Form/Re-Bar | 11/9/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Fireproofing | 11/10/2021 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 11/10/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 11/10/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 11/12/2021 | Approved | SORIN CIRSTOIU |
| Deputy Shotcrete | 11/16/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 11/17/2021 | Approved | SORIN CIRSTOIU |
| Excavation/Setback/Form/Re-Bar | 11/17/2021 | Partial Approval | SORIN CIRSTOIU |
| Green Building Rough | 11/17/2021 | Partial Inspection | SORIN CIRSTOIU |
| Reinforced Concrete Frame | 11/17/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 11/18/2021 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 11/19/2021 | Conditional Approval | JONATHAN QUACH |
| Light Gage Steel Frame | 11/23/2021 | Partial Approval | JONATHAN QUACH |
| Light Gage Steel Frame | 11/24/2021 | Partial Approval | SORIN CIRSTOIU |
| Deputy Fireproofing | 11/30/2021 | Approved | SORIN CIRSTOIU |
| Drywall Nailing | 12/7/2021 | Partial Approval | SORIN CIRSTOIU |
| Insulation | 12/7/2021 | Partial Approval | SORIN CIRSTOIU |
| Excavation/Setback/Form/Re-Bar | 1/13/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 1/14/2022 | Approved | SORIN CIRSTOIU |
| Deputy Fireproofing | 1/18/2022 | Partial Approval | EDWIN GREGORYONA |
| Deputy Reinf. Concrete | 1/26/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 2/11/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/14/2022 | Approved | SORIN CIRSTOIU |
| Light Gage Steel Frame | 2/14/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/15/2022 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/16/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 2/16/2022 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/16/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 2/17/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/17/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/18/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/22/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/23/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/24/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 2/25/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 2/25/2022 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 2/28/2022 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 3/1/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 3/2/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 3/3/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 3/4/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/5/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/6/2022 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 4/7/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/11/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/12/2022 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/13/2022 | Approved | SORIN CIRSTOIU |
| Drywall Nailing | 4/13/2022 | Partial Approval | SORIN CIRSTOIU |
| Light Gage Steel Frame | 4/13/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/14/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/15/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/18/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/19/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/20/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/21/2022 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 4/22/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/22/2022 | Conditional Approval | SORIN CIRSTOIU |
| Deputy Steel/Welding | 4/22/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 4/25/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/25/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/26/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 4/27/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/27/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 4/28/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 4/28/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 4/29/2022 | Conditional Approval | TED RIES |
| Deputy Steel/Welding | 4/29/2022 | Conditional Approval | TED RIES |
| Deputy Steel/Welding | 5/2/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Drilled-In Anchors | 5/3/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/3/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 5/4/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/4/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/5/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/6/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Drilled-In Anchors | 5/9/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/10/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 5/11/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/11/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/12/2022 | Approved | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 5/13/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/13/2022 | Approved | SORIN CIRSTOIU |
| Light Gage Steel Frame | 5/13/2022 | Partial Approval | SORIN CIRSTOIU |
| Deputy Reinf. Concrete | 5/16/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/16/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Drilled-In Anchors | 5/17/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/17/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/18/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 5/19/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/19/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Drilled-In Anchors | 5/20/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/20/2022 | Approved | SORIN CIRSTOIU |
| Deputy Steel/Welding | 5/23/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Steel/Welding | 5/24/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/25/2022 | Conditional Approval | TERRY HERR |
| Deputy Steel/Welding | 5/26/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/27/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 5/31/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 5/31/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 5/31/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/1/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/1/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 6/2/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/2/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/3/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Steel/Welding | 6/3/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 6/6/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/6/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Drilled-In Anchors | 6/8/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Reinf. Concrete | 6/8/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/9/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/10/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 6/10/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 6/13/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/14/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/15/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Reinf. Concrete | 6/15/2022 | Conditional Approval | JONATHAN QUACH |
| Deputy Fireproofing | 6/16/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/17/2022 | Conditional Approval | WINSTON DUNNING |
| Deputy Fireproofing | 6/23/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 6/24/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 7/1/2022 | Conditional Approval | ERNESTO CORRAL |
| Deputy Fireproofing | 8/12/2022 | Conditional Approval | ERNESTO CORRAL |
| Final | 4/7/2023 | Partial Inspection | TIMOTHY POWELL |
| Green Building Final | 4/7/2023 | Not Ready for Inspection | TIMOTHY POWELL |
| Green Building Rough | 4/7/2023 | Not Ready for Inspection | TIMOTHY POWELL |
| Reinforced Concrete Frame | 4/7/2023 | Not Ready for Inspection | TIMOTHY POWELL |
| SGSOV-Seismic Gas S/O Valve | 4/7/2023 | SGSOV Not Ready | TIMOTHY POWELL |
| Smoke Detectors | 4/7/2023 | Not Ready for Inspection | TIMOTHY POWELL |
| Final | 6/28/2023 | OK to Issue CofO | TIMOTHY POWELL |
| Green Building Final | 6/28/2023 | Approved | TIMOTHY POWELL |
| Green Building Rough | 6/28/2023 | Approved | TIMOTHY POWELL |
| Reinforced Concrete Frame | 6/28/2023 | Approved | TIMOTHY POWELL |
| SGSOV-Seismic Gas S/O Valve | 6/28/2023 | SGSOV Approved | TIMOTHY POWELL |
| Smoke Detectors | 6/28/2023 | Approved | TIMOTHY POWELL |