102 S WILTON PL 90004
Certificate Information: 102 S WILTON PL 90004
- Application / Permit
- 21016-10000-11494
- Plan Check / Job No.
- B21LA08471
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Kitchen/bathroom remodel for residential buildings (no structural changes). Water damage, termite damage or dry rot repair less than 10% of replacement cost of residential buildings. Repair stucco for residential buildings. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non- residential buildings per Title 24, Part 6, Section 141.0(b)2B.
- Permit Issued
- Issued on 5/21/2021
- Issuing Office
- Current Status
- Permit Finaled on 6/15/2022
Permit Application Status History
| Submitted | 5/18/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 5/18/2021 | SAMUEL GONZALEZ |
| Plan Check Approved | 5/21/2021 | SAMUEL GONZALEZ |
| Issued | 5/21/2021 | APPLICANT |
| Building Plans Picked Up | 7/28/2021 | APPLICANT |
| Permit Finaled | 6/14/2022 | ALIZAH MAYAGOITIA |
Permit Application Clearance Information
| City Hist. Cultural Monument | Cleared | 5/20/2021 | LAMBERT GIESSINGER |
| Historic monument | Cleared | 5/20/2021 | LAMBERT GIESSINGER |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| JEFFREY MEAD, (213) 202-3240 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Interior/Exterior Lathing | 9/1/2021 | Approved | ARTHUR SARGSYAN |
| Floor/Roof Diaphrgm/Shear Wall | 9/13/2021 | Approved | JOSEPH MCGARRY |
| Special/Order Compliance | 9/13/2021 | Corrections Issued | JOSEPH MCGARRY |
| Final | 5/13/2022 | No Access for Inspection | SHAVONNE ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 5/13/2022 | SGSOV Approved | SHAVONNE ESPINOZA |
| Smoke Detectors | 5/13/2022 | No Access for Inspection | SHAVONNE ESPINOZA |
| Final | 5/25/2022 | Corrections Issued | SHAVONNE ESPINOZA |
| Smoke Detectors | 5/25/2022 | Corrections Issued | SHAVONNE ESPINOZA |
| Final | 6/14/2022 | Permit Finaled | ALIZAH MAYAGOITIA |
| Smoke Detectors | 6/14/2022 | Approved | ALIZAH MAYAGOITIA |