592 N BEVERLY GLEN BLVD 90077
Certificate Information: 592 N BEVERLY GLEN BLVD 90077
- Application / Permit
- 21016-10000-10213
- Plan Check / Job No.
- B21LA07399
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- REMOVE AND REPLACE EXISTING THREE (3) GARAGE DOORS WITH TWO (2) GARAGE DOORS. ATTACHED TWO-STORY SINGLE FAMILY RESIDENCE TO REMAIN UNTOUCHED. NO NEW SQUARE FOOTAGE BEING ADDED. ALL WORK PER ENGINEER DESIGN.
- Permit Issued
- Issued on 8/24/2021
- Issuing Office
- Current Status
- Permit Finaled on 1/30/2024
Permit Application Status History
| Submitted | 5/25/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 6/3/2021 | SAMUEL GONZALEZ |
| Corrections Issued | 6/4/2021 | SAMUEL GONZALEZ |
| Applicant returned to address corrections | 7/22/2021 | ZAW HAN |
| Plan Check Approved | 7/26/2021 | ZAW HAN |
| Issued | 8/24/2021 | APPLICANT |
| Building Plans Picked Up | 8/27/2021 | APPLICANT |
| Permit Finaled | 1/29/2024 | BRENDAN LOONEY |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 6/16/2021 | PATRICK MISCHLICH |
Contact Information
| Contractor | Dirty Girl Construction Inc; Lic. No.: 934287-B | 4321 STEWART AVENUE LOS ANGELES, CA 90066 |
| Engineer | Phillips,, Craig Richard; Lic. No.: C69673 | 2123 VESTAL AVE LOS ANGELES, CA 90026 |
Inspector Information
| CARLOS MATAMOROS, (310) 914-3878 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 12/6/2021 | Corrections Issued | GERMAN RODRIGUEZ MENDOZA |
| Footing/Foundation/Slab | 12/6/2021 | Not Ready for Inspection | GERMAN RODRIGUEZ MENDOZA |
| Excavation/Setback/Form/Re-Bar | 12/8/2021 | Partial Approval | CHRISTOPHER WILSON |
| Footing/Foundation/Slab | 12/8/2021 | Partial Approval | CHRISTOPHER WILSON |
| BUILDING-Rough-Frame | 6/2/2022 | Approved | GERMAN RODRIGUEZ MENDOZA |
| Insulation | 8/9/2022 | Approved | GERMAN RODRIGUEZ MENDOZA |
| Final | 7/18/2023 | Not Ready for Inspection | BRENDAN LOONEY |
| SGSOV-Seismic Gas S/O Valve | 7/18/2023 | SGSOV Not Ready | BRENDAN LOONEY |
| Smoke Detectors | 7/18/2023 | Approved | BRENDAN LOONEY |
| Final | 1/29/2024 | Permit Finaled | BRENDAN LOONEY |
| SGSOV-Seismic Gas S/O Valve | 1/29/2024 | SGSOV Approved | BRENDAN LOONEY |