3640 N WRIGHTWOOD DR 91604

Certificate Information: 3640 N WRIGHTWOOD DR 91604

Application / Permit
21016-10000-06847
Plan Check / Job No.
B21LA04994
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO EXISTING SINGLE FAMILY DWELLING INCLUDING VAULTED CEILING, NEW SKYLIGHTS, RECONFIGURE PARTITION WALLS, ALTERATIONS FOR NEW DOORS AND WINDOWS AT EXTERIOR WALL. NO NEW ROOF OR SHEATHING REPLACEMENT.
Permit Issued
Issued on 5/18/2021
Issuing Office
Current Status
Permit Finaled on 11/2/2021

Permit Application Status History

Submitted 3/17/2021 APPLICANT
Assigned to Plan Check Engineer 3/18/2021 GEORGE ALVAREZ
Corrections Issued 3/24/2021 GEORGE ALVAREZ
Applicant returned to address corrections 5/3/2021 CRISTINA SALAZAR
Issued 5/18/2021 APPLICANT
Building Plans Picked Up 5/19/2021 APPLICANT
Permit Finaled 11/2/2021 BRIAN SULLIVAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/24/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 3/24/2021 GABRIEL ROBLES
Specific Plan Cleared 4/1/2021 JOE LUCKEY
Grading Pre-Inspection Cleared 4/13/2021 BARTON HOLMES

Contact Information

Contractor Owner-Builder       ,
Engineer Hwang,, Junho; Lic. No.: S5592 815 FAIRVIEW AVE #205      SOUTH PASADENA, CA 91030

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/24/2021 Approved BRIAN SULLIVAN
PLUMBING-Rough 6/24/2021 Partial Approval BRIAN SULLIVAN
Pre-Inspection 6/24/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 8/4/2021 Corrections Issued RAUL BARAJAS
ELECTRICAL-Rough 8/4/2021 Partial Approval RAUL BARAJAS
HVAC-Rough 8/4/2021 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 8/4/2021 Partial Approval RAUL BARAJAS
BUILDING-Rough-Frame 8/13/2021 Corrections Issued RAUL BARAJAS
HVAC-Rough 8/13/2021 Approved RAUL BARAJAS
PLUMBING-Rough 8/13/2021 Approved RAUL BARAJAS
BUILDING-Rough-Frame 8/20/2021 Conditional Approval BRIAN SULLIVAN
Insulation 8/20/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 8/25/2021 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/25/2021 Approved ARTHUR SARGSYAN
Drywall Nailing 8/31/2021 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 9/14/2021 Approved BRIAN SULLIVAN
Shower Pan 9/14/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Final 10/22/2021 Approved JOAQUIN GREENOUGH
Final 10/22/2021 Not Ready for Inspection JOAQUIN GREENOUGH
HVAC-Final 10/22/2021 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Final 10/22/2021 Not Ready for Inspection JOAQUIN GREENOUGH
SGSOV-Seismic Gas S/O Valve 10/22/2021 SGSOV Not Ready JOAQUIN GREENOUGH
Smoke Detectors 10/22/2021 Corrections Issued JOAQUIN GREENOUGH
Final 11/2/2021 Permit Finaled BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 11/2/2021 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 11/2/2021 Approved BRIAN SULLIVAN