910 S MARIPOSA AVE 90006
Certificate Information: 910 S MARIPOSA AVE 90006
- Application / Permit
- 21016-10000-06524
- Plan Check / Job No.
- B21LA04720
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- REMOVE APPROXIMATELY 36 SQFT OF FIRE DAMAGED SECOND FLOOR SHEATHING; REMOVE 4'-0" SECTION OF FIVE (5) FIRE DAMAGED SECOND FLOOR JOISTS AND REINFORCED WITH FULL LENGTH MEMBERS; REMOVE AND REPLACE LIMITED FIRE DAMAGED WALL FRAMING AND WINDOW HEADER; REMOVE AND REPLACE (3) THREE WINDOW ASSEMBLIES (SIZE, TYPE AND LOCATION TO MATCH) REMOVE AND REPLACE FIRE/SMOKE/WATER DAMAGED INTERIOR WALL AND CEILING FINISHES; REPLACE DAMAGED ELECTRICAL WIRING, OUTLETS AND LIGHTING; REPLACE FIRE DAMAGED GAS WALL HEATER TO MATCH EXISTING; ALL WORK SHALL AESTHETICALLY MATCH THE PRE-FIRE EXISTING CONDITION.
- Permit Issued
- Issued on 7/8/2021
- Issuing Office
- Current Status
- Issued on 7/8/2021
Permit Application Status History
| Submitted | 4/1/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 4/5/2021 | FERNANDO FLORES |
| Corrections Issued | 4/5/2021 | FERNANDO FLORES |
| Plan Check Approved | 4/30/2021 | RICARDO RAMIREZ |
| Building Plans Picked Up | 5/3/2021 | APPLICANT |
| Issued | 7/8/2021 | APPLICANT |
Permit Application Clearance Information
| Historic Resource Verification | Cleared | 4/22/2021 | MICAELA TORRES-GIL |
| Tenant Habitability Plan | Cleared | 4/22/2021 | MICHAEL SOTO |
| Redevelopment Project Area | Cleared | 4/23/2021 | DAVID URITA |
Contact Information
| Contractor | Paea Builder; Lic. No.: 778325-B | 8280 UTICA AVE STE 200 RANCHO CUCAMONGA, CA 91730 |
| Engineer | Hokama,, Michael Sigueo; Lic. No.: S4505 | 4 ST JUST AVE LADERA RANCH, CA 92694 |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 9/15/2021 | Conditional Approval | TIMOTHY BUXTON |
| Insulation | 9/28/2021 | Approved | TIMOTHY BUXTON |
| Drywall Nailing | 10/1/2021 | Approved | TIMOTHY BUXTON |
| Final | 11/5/2021 | Not Ready for Inspection | TIMOTHY BUXTON |
| SGSOV-Seismic Gas S/O Valve | 11/5/2021 | SGSOV Not Ready | TIMOTHY BUXTON |
| Smoke Detectors | 11/5/2021 | Not Ready for Inspection | TIMOTHY BUXTON |