517-519 W 55TH ST 90037
Certificate Information: 517-519 W 55TH ST 90037
- Application / Permit
- 21016-10000-06492
- Plan Check / Job No.
- B21LA04703
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- INTERIOR REMODEL TO UNIT 519 W 55TH STREET OF EXISTING DUPLEX. NEW PARTITIONS, NEW BEDROOM, NEW BATHROOM & KITCHEN LOCATION. ALTER EXTERIOR OPENINGS FOR NEW DOORS AND WINDOWS AND IN-FILL. ALL WORK PER WOOD FRAME PRESCRIPTIVE PROVISIONS.
- Permit Issued
- Issued on 7/13/2021
- Issuing Office
- Current Status
- Permit Finaled on 3/31/2023
Permit Application Status History
| Submitted | 3/15/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 3/16/2021 | GEORGE ALVAREZ |
| Corrections Issued | 3/22/2021 | GEORGE ALVAREZ |
| Plan Check Approved | 6/1/2021 | ADAM HEGAZI |
| Issued | 7/13/2021 | APPLICANT |
| Building Plans Picked Up | 7/20/2021 | APPLICANT |
| Permit Finaled | 3/30/2023 | SABAS ALONSO |
Permit Application Clearance Information
| Tenant Habitability Plan | Cleared | 5/19/2021 | MICHAEL SOTO |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Ramirez, Cid, Jose Carlos; Lic. No.: C91046 | 5164 N RATON CIR LONG BEACH, CA 90807 |
Inspector Information
| BARRY HACHE, (213) 202-9851 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 7/14/2021 | No Access for Inspection | HORACE FULTZ |
| Floor/Roof Diaphrgm/Shear Wall | 7/21/2021 | Approved | HORACE FULTZ |
| Wood Frame | 7/21/2021 | Approved | HORACE FULTZ |
| Interior/Exterior Lathing | 8/3/2021 | Partial Approval | ADAM ESCOTO |
| Insulation | 8/25/2021 | Approved | JESUS PINEDA |
| Drywall Nailing | 10/8/2021 | Approved | SABAS ALONSO |
| Interior/Exterior Lathing | 10/8/2021 | Not Ready for Inspection | SABAS ALONSO |
| Interior/Exterior Lathing | 10/15/2021 | Approved | ALIZAH MAYAGOITIA |
| Final | 2/17/2023 | Not Ready for Inspection | SABAS ALONSO |
| SGSOV-Seismic Gas S/O Valve | 2/17/2023 | SGSOV Not Ready | SABAS ALONSO |
| Smoke Detectors | 2/17/2023 | Not Ready for Inspection | SABAS ALONSO |
| Final | 3/30/2023 | Permit Finaled | SABAS ALONSO |
| SGSOV-Seismic Gas S/O Valve | 3/30/2023 | SGSOV Approved | SABAS ALONSO |
| Smoke Detectors | 3/30/2023 | Approved | SABAS ALONSO |