528-530 E WESTMINSTER AVE 90291
Certificate Information: 528-530 E WESTMINSTER AVE 90291
- Application / Permit
- 21016-10000-06282
- Plan Check / Job No.
- X21LA03532
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- 2 Kitchen/2 bathroom remodel for residential buildings (no structural changes). Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. Repair of water, dry-rot or termite damaged stairs in residential buildings (less than 10% of replacement cost of stairs). Handrails for apartments, one and two family dwellings require plan check. 22 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 3/16/2021
- Issuing Office
- Current Status
- Permit Finaled on 6/17/2025
Permit Application Status History
| Issued | 3/16/2021 | APPLICANT |
| Permit Finaled | 6/17/2025 | BOBBY KEY |
Permit Application Clearance Information
| Coastal Zone | Cleared | 3/15/2021 | LOUIS ORTEGA |
Contact Information
| Contractor | Kara Construction Group Inc; Lic. No.: 1064239-B | 347 W GARFIELD AVE GLENDALE, CA 91204 |
Inspector Information
| RUBEN RIVAS, (310) 914-3981 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 4/12/2022 | Corrections Issued | DAVID FEILER |
| Footing/Foundation/Slab | 4/27/2022 | Conditional Approval | JESUS RODRIGUEZ |
| Excavation/Setback/Form/Re-Bar | 5/4/2023 | Corrections Issued | HERBERT GIRON |
| Footing/Foundation/Slab | 5/4/2023 | Corrections Issued | HERBERT GIRON |
| Floor/Roof Diaphrgm/Shear Wall | 7/31/2023 | Corrections Issued | HERBERT GIRON |
| Wood Frame | 7/31/2023 | Corrections Issued | HERBERT GIRON |
| Final | 6/10/2025 | Corrections Issued | JESUS RODRIGUEZ |
| SGSOV-Seismic Gas S/O Valve | 6/10/2025 | SGSOV Not Ready | JESUS RODRIGUEZ |
| Smoke Detectors | 6/10/2025 | No Access for Inspection | JESUS RODRIGUEZ |
| Final | 6/17/2025 | Permit Finaled | BOBBY KEY |
| SGSOV-Seismic Gas S/O Valve | 6/17/2025 | SGSOV Approved | BOBBY KEY |
| Smoke Detectors | 6/17/2025 | Approved | BOBBY KEY |