3151 N OAKCREST DR 90068

Certificate Information: 3151 N OAKCREST DR 90068

Application / Permit
21016-10000-04468
Plan Check / Job No.
B21LA03056
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRE DAMAGED REPAIR OF (E) 2 STORY SINGLE FAMILY DWELLING WITH ATTACHED GARAGE & REMODEL WORK INCLUDE REPLACE ROOF FRAMING OVER LIVINGROOM @ MAIN FLOOR, REPLACE ROOF FRAMING OVER MASTER BEDROOM @ SECOND FLOOR & REARE DECK & REPLACE DRYWAL & INSULATION & REMODEL ALL BATHROOMS AND KITCHEN. ( The LID clearance has been deferred.Approval for LID requirements shall be obtained from LASAN prior to the issuance of the Certificate of Occupancy).
Permit Issued
Issued on 10/12/2021
Issuing Office
Current Status
Permit Finaled on 8/1/2023

Permit Application Status History

Submitted 2/19/2021 APPLICANT
Assigned to Plan Check Engineer 3/11/2021 GARO TELMI
Corrections Issued 3/19/2021 GARO TELMI
Quality Review Completed 3/22/2021 KEN GILL
Plan Check Approved 9/22/2021 GARO TELMI
Issued 10/12/2021 APPLICANT
Building Plans Picked Up 10/13/2021 APPLICANT
Permit Finaled 7/31/2023 BRIAN SULLIVAN

Permit Application Clearance Information

Hold Cleared 3/8/2021 JASON SHEETS
Eng Process Fee Ord 176,300 Cleared 4/1/2021 JOHN TRIANTAFYLLOS
Specific Plan Cleared 6/3/2021 OLGA AYALA
Roof/Waste drainage to street Cleared 9/7/2021 DAGOVERTO GUERRERO

Contact Information

Contractor Ikon Builders Inc; Lic. No.: 966760-B 32158 CAMINO CAPISTRANO A 336      SAN JUAN CAPISTRANO, CA 92675
Engineer Ionescu,, Benjamin; Lic. No.: C65482 17332 IRVINE BLVD 290      TUSTIN, CA 92780

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Final 12/2/2021 Not Ready for Inspection BRIAN SULLIVAN
Service/Power Release 12/2/2021 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 4/28/2022 Partial Approval BRIAN SULLIVAN
MERV13>=Rough 4/28/2022 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 8/4/2022 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 8/4/2022 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 8/4/2022 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 8/4/2022 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 8/4/2022 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 9/23/2022 Partial Approval BRIAN SULLIVAN
ELECTRICAL-Rough 9/23/2022 Approved BRIAN SULLIVAN
HVAC-Rough 9/23/2022 Partial Approval BRIAN SULLIVAN
Interior/Exterior Lathing 9/23/2022 Partial Approval BRIAN SULLIVAN
PLUMBING-Rough 9/23/2022 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 10/18/2022 Approved BRIAN SULLIVAN
HVAC-Rough 10/18/2022 Approved BRIAN SULLIVAN
MERV13>=Rough 10/18/2022 Approved BRIAN SULLIVAN
Drywall Nailing 11/22/2022 Approved BRIAN SULLIVAN
Shower Pan 1/26/2023 Approved STUART CHAPMAN
Interior/Exterior Lathing 3/3/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 6/26/2023 Not Ready for Inspection BRIAN SULLIVAN
Gas Test 6/26/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 6/26/2023 Approved BRIAN SULLIVAN
HVAC-Final 6/29/2023 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Final 7/7/2023 Not Ready for Inspection BRIAN SULLIVAN
Final 7/7/2023 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 7/7/2023 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Final 7/7/2023 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 7/7/2023 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 7/7/2023 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Final 7/20/2023 Approved BRIAN SULLIVAN
Final 7/20/2023 Corrections Issued BRIAN SULLIVAN
HVAC-Final 7/20/2023 Approved BRIAN SULLIVAN
MERV13>=Final 7/20/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 7/20/2023 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 7/20/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 7/20/2023 Corrections Issued BRIAN SULLIVAN
Final 7/31/2023 Permit Finaled BRIAN SULLIVAN
Smoke Detectors 7/31/2023 Approved BRIAN SULLIVAN