1363 E 56TH ST 90011
Certificate Information: 1363 E 56TH ST 90011
- Application / Permit
- 21016-10000-04231
- Plan Check / Job No.
- X21LA02272
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __10____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B 1-Kitchen/1-bathroom remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only Incuding HVAC, Plumbing & Electrical
- Permit Issued
- Issued on 2/18/2021
- Issuing Office
- Current Status
- Permit Finaled on 6/7/2021
Permit Application Status History
| Issued | 2/18/2021 | APPLICANT |
| Permit Finaled | 6/3/2021 | FREDDIE RIVERA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | De La Rosa Construction; Lic. No.: 855010-B | 3684 E PERCY ST LOS ANGELES, CA 90023 |
Inspector Information
| ALEJANDRO DE ARTOLA, (213) 202-3128 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 2/27/2021 | Approved | STUART CHAPMAN |
| ELECTRICAL-Rough | 3/20/2021 | Not Ready for Inspection | ENRIQUE MIRELES |
| Insulation | 3/20/2021 | Not Ready for Inspection | ENRIQUE MIRELES |
| PLUMBING-Rough | 3/20/2021 | Not Ready for Inspection | ENRIQUE MIRELES |
| BUILDING-Rough-Frame | 3/26/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| ELECTRICAL-Rough | 3/26/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| Insulation | 3/26/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| PLUMBING-Rough | 3/26/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| Rough-Elec/Plmb/HVAC | 3/26/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| BUILDING-Rough-Frame | 4/1/2021 | Approved | FREDDIE RIVERA |
| PLUMBING-Rough | 4/1/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| Pre-Inspection | 4/1/2021 | Corrections Issued | FREDDIE RIVERA |
| Rough-Elec/Plmb/HVAC | 4/1/2021 | Approved | FREDDIE RIVERA |
| Drywall Nailing | 4/15/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| Interior/Exterior Lathing | 4/15/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| Drywall Nailing | 4/24/2021 | Not Ready for Inspection | JUAN VALENZUELA |
| Interior/Exterior Lathing | 4/24/2021 | Not Ready for Inspection | JUAN VALENZUELA |
| Shower Pan | 4/24/2021 | Not Ready for Inspection | JUAN VALENZUELA |
| Final | 6/3/2021 | Permit Finaled | FREDDIE RIVERA |
| SGSOV-Seismic Gas S/O Valve | 6/3/2021 | SGSOV Approved | FREDDIE RIVERA |
| Smoke Detectors | 6/3/2021 | Approved | FREDDIE RIVERA |