2155 W 29TH PL 90018
Certificate Information: 2155 W 29TH PL 90018
- Application / Permit
- 21016-10000-02431
- Plan Check / Job No.
- X21LA01173
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 1 Kitchen 2 bathroom remodel for residential buildings (no structural changes). 16 Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 2/1/2021
- Issuing Office
- Current Status
- Permit Finaled on 5/26/2022
Permit Application Status History
| Issued | 2/1/2021 | APPLICANT |
| Permit Finaled | 5/25/2022 | SABAS ALONSO |
Permit Application Clearance Information
| HPOZ | Cleared | 1/29/2021 | MAX LODER |
Contact Information
| Contractor | G A Design Build; Lic. No.: 941130-B | 8449 EVEREST ST DOWNEY, CA 90242 |
Inspector Information
| SABAS ALONSO, (213) 202-3468 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Interior/Exterior Lathing | 3/30/2021 | Not Ready for Inspection | ROBERT MCDOWELL |
| Wood Frame | 3/30/2021 | Approved | ROBERT MCDOWELL |
| Final | 6/14/2021 | Not Ready for Inspection | DAVID FEILER |
| SGSOV-Seismic Gas S/O Valve | 6/14/2021 | SGSOV Not Ready | DAVID FEILER |
| Smoke Detectors | 6/14/2021 | Corrections Issued | DAVID FEILER |
| Drywall Nailing | 6/17/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Final | 6/17/2021 | Corrections Issued | JOAQUIN GREENOUGH |
| SGSOV-Seismic Gas S/O Valve | 6/17/2021 | SGSOV Approved | JOAQUIN GREENOUGH |
| Smoke Detectors | 6/17/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Interior/Exterior Lathing | 7/2/2021 | Not Ready for Inspection | CALEB MEISTER |
| Pre-Inspection | 7/8/2021 | Corrections Issued | JOAQUIN GREENOUGH |
| Final | 5/25/2022 | Permit Finaled | SABAS ALONSO |
| Smoke Detectors | 5/25/2022 | Approved | SABAS ALONSO |