11712 W EXPOSITION BLVD 90064

Certificate Information: 11712 W EXPOSITION BLVD 90064

Application / Permit
21014-30000-05794
Plan Check / Job No.
B21WL05081
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
Convert (E) 160 s.f. detached garage to ADU at rear of the lot per LAMC 12.22A33(c) & (d) and add 95 s.f. to the side of the ADU.
Permit Issued
Issued on 5/31/2022
Issuing Office
Current Status
CofO Issued on 11/14/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/18/2021 APPLICANT
Assigned to Plan Check Engineer 11/24/2021 JAHANSHAH POURHASSAN
Corrections Issued 12/6/2021 JAHANSHAH POURHASSAN
Applicant returned to address corrections 1/4/2022 JAHANSHAH POURHASSAN
Applicant returned to address corrections 2/8/2022 EDWIN ESPIN
Plan Check Approved 3/3/2022 EDWIN ESPIN
Issued 5/31/2022 APPLICANT
Building Plans Picked Up 6/7/2022 APPLICANT
CofO in Progress 11/14/2023 KENNETH NAGLE
Permit Finaled 11/14/2023 DANIEL ORRANTE
CofO Issued 11/14/2023 DANIEL ORRANTE
Permit Finaled 11/14/2023 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 12/11/2021 JOSE HERNANDEZ
Roof/Waste drainage to street Cleared 12/11/2021 JOSE HERNANDEZ
Eng Process Fee Ord 176,300 Cleared 12/13/2021 JOSE HERNANDEZ
Sewer availability Cleared 12/13/2021 JOSE HERNANDEZ
Specific Plan Cleared 12/14/2021 DYLAN SITTIG

Contact Information

Contractor Yu Construction; Lic. No.: 1054615-B 11627 RIO HONDO PKWAY      EL MONTE, CA 91732
Engineer Chen,, Junfei; Lic. No.: C85841 726 FAMILY TREE      IRVINE, CA 92618

Inspector Information

ANTHONY EGSON, (310) 914-3893 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 6/24/2022 Partial Approval OGANES TARAKHCHYAN
Sewer 6/30/2022 Corrections Issued OGANES TARAKHCHYAN
Sewer 7/7/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Inspection 7/12/2022 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 7/25/2022 Partial Inspection JOHN KIDWELL
Deputy Drilled-In Anchors 7/26/2022 Conditional Approval MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 7/28/2022 Corrections Issued RICHARD STEINBACH
Excavation/Setback/Form/Re-Bar 8/1/2022 Corrections Issued JOHN KIDWELL
Excavation/Setback/Form/Re-Bar 8/3/2022 Approved JOHN KIDWELL
ELECTRICAL-Rough 9/30/2022 No Access for Inspection JOHN KIDWELL
PLUMBING-Rough 9/30/2022 No Access for Inspection JOHN KIDWELL
Wood Frame 9/30/2022 No Access for Inspection JOHN KIDWELL
ELECTRICAL-Rough 10/4/2022 Not Ready for Inspection ASHLEY THOMPSON
PLUMBING-Rough 10/4/2022 Not Ready for Inspection ASHLEY THOMPSON
Pre-Inspection 10/4/2022 Approved ASHLEY THOMPSON
Wood Frame 10/4/2022 Corrections Issued ASHLEY THOMPSON
Wood Frame 10/5/2022 No Access for Inspection EVAN COOPER
Wood Frame 10/6/2022 Corrections Issued ANDREW NAVE
Floor/Roof Diaphrgm/Shear Wall 10/12/2022 Approved ASHLEY THOMPSON
ELECTRICAL-Rough 11/1/2022 Corrections Issued CLAYTON GRAHAM
HVAC-Rough 11/1/2022 Corrections Issued CLAYTON GRAHAM
PLUMBING-Rough 11/1/2022 Corrections Issued CLAYTON GRAHAM
ELECTRICAL-Rough 11/4/2022 Corrections Issued ASHLEY THOMPSON
HVAC-Rough 11/4/2022 Corrections Issued ASHLEY THOMPSON
PLUMBING-Rough 11/4/2022 Corrections Issued ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 1/20/2023 Partial Approval CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 2/7/2023 Corrections Issued OGANES TARAKHCHYAN
Floor/Roof Diaphrgm/Shear Wall 2/8/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 2/27/2023 Corrections Issued CLAYTON GRAHAM
PLUMBING-Rough 2/27/2023 Approved CLAYTON GRAHAM
ELECTRICAL-Rough 3/2/2023 Approved CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 3/2/2023 Partial Approval CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 3/22/2023 No Access for Inspection CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 3/23/2023 No Access for Inspection CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 3/28/2023 Corrections Issued CLAYTON GRAHAM
Interior/Exterior Lathing 3/28/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 4/10/2023 Not Ready for Inspection JEREMY TODD
Floor/Roof Diaphrgm/Shear Wall 4/13/2023 Not Ready for Inspection JESUS PINEDA
BUILDING-Rough-Frame 4/18/2023 Corrections Issued CLAYTON GRAHAM
Green Building Rough 4/18/2023 Approved CLAYTON GRAHAM
HVAC-Rough 4/18/2023 Approved CLAYTON GRAHAM
Insulation 4/26/2023 Approved JESUS PINEDA
Drywall Nailing 5/15/2023 Corrections Issued HERBERT GIRON
Drywall Nailing 5/23/2023 Approved JOHNNY MIRANDA
Shower Pan 7/11/2023 Corrections Issued JEREMY TODD
Shower Pan 7/13/2023 Approved JEREMY TODD
BUILDING-Rough-Frame 9/19/2023 Not Ready for Inspection KENNETH NAGLE
Final 9/19/2023 Corrections Issued KENNETH NAGLE
Footing/Foundation/Slab 9/19/2023 Approved KENNETH NAGLE
Green Building Final 9/19/2023 Not Ready for Inspection KENNETH NAGLE
SGSOV-Seismic Gas S/O Valve 9/19/2023 SGSOV Not Ready KENNETH NAGLE
Smoke Detectors 9/19/2023 Corrections Issued KENNETH NAGLE
Final 10/6/2023 Not Ready for Inspection CLAYTON GRAHAM
Green Building Final 10/6/2023 Approved CLAYTON GRAHAM
PLUMBING-Final 10/6/2023 Approved CLAYTON GRAHAM
SGSOV-Seismic Gas S/O Valve 10/6/2023 SGSOV Not Ready CLAYTON GRAHAM
Smoke Detectors 10/6/2023 Approved CLAYTON GRAHAM
BUILDING-Rough-Frame 10/17/2023 Corrections Issued BEN MOLSTAD
Final 10/17/2023 Corrections Issued BEN MOLSTAD
SGSOV-Seismic Gas S/O Valve 10/17/2023 SGSOV Approved BEN MOLSTAD
BUILDING-Rough-Frame 11/3/2023 Not Ready for Inspection BEN MOLSTAD
ELECTRICAL-Final 11/3/2023 Corrections Issued BEN MOLSTAD
Final 11/3/2023 Not Ready for Inspection BEN MOLSTAD
HVAC-Final 11/3/2023 Corrections Issued BEN MOLSTAD
PLUMBING-Final 11/3/2023 Corrections Issued BEN MOLSTAD
BUILDING-Rough-Frame 11/9/2023 Approved KENNETH NAGLE
ELECTRICAL-Final 11/9/2023 Approved KENNETH NAGLE
Final 11/9/2023 Conditional Approval KENNETH NAGLE
HVAC-Final 11/9/2023 Approved KENNETH NAGLE
PLUMBING-Final 11/9/2023 Approved KENNETH NAGLE