13256-13258 W CHALON ROAD 90049

Certificate Information: 13256-13258 W CHALON ROAD 90049

Application / Permit
21014-30000-05320
Plan Check / Job No.
B21WL04679
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition of attached accessory dwelling unit (ADU) at (e) deck below 1st floor (lower level) per GCS 65852.2(e)(1)(A), interior renovation, removal of (e) living room glass enclosure, and construction of (n) building envelope, replace master bedroom bay windows, new site stair to lower level with moment frame, grade beam & piles.
Permit Issued
Issued on 4/14/2022
Issuing Office
Current Status
CofO Issued on 10/8/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/22/2021 APPLICANT
Assigned to Plan Check Engineer 11/4/2021 SERGIO SILVA
Corrections Issued 11/19/2021 SERGIO SILVA
Quality Review Completed 11/29/2021 TARIK SAOUD
Applicant returned to address corrections 2/9/2022 SERGIO SILVA
Plan Check Approved 3/30/2022 SERGIO SILVA
Building Plans Picked Up 3/30/2022 APPLICANT
Issued 4/14/2022 APPLICANT
CofO in Progress 9/26/2024 JESUS RODRIGUEZ
Permit Finaled 10/8/2024 RICHARD STEINBACH
CofO Issued 10/8/2024 RICHARD STEINBACH
Permit Finaled 10/8/2024 RICHARD STEINBACH

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 12/7/2021 HUGO RICO
BHO/Hillside ordinance Cleared 12/7/2021 HUGO RICO
BHO/Hillside ordinance Cleared 12/7/2021 HUGO RICO
BHO/Hillside ordinance Cleared 12/7/2021 HUGO RICO
BHO/Hillside ordinance Cleared 12/7/2021 HUGO RICO
Sewer availability Cleared 12/7/2021 HUGO RICO
Eng Process Fee Ord 176,300 Cleared 12/9/2021 HUGO RICO
Watercourse Cleared 12/17/2021 MAHELET GEBEYHU
Trees in Parkway Cleared 1/25/2022 ADALBERTO VERA
Excavation more than 5-ft deep Cleared 2/9/2022 CALOSHA APPROVED
GPI Written Notices Cleared 2/9/2022 SERGIO SILVA
Grading Pre-Inspection Cleared 2/9/2022 SERGIO SILVA
Low Impact Development Cleared 3/3/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 3/3/2022 MAHELET GEBEYHU
Address approval Cleared 3/10/2022 DINAH GARIN
Permit Cleared 3/10/2022 DINAH GARIN
Distance to fire station Cleared 3/24/2022 JOHN CONNEALLY
Hydrant and Access approval Cleared 3/24/2022 JOHN CONNEALLY
Miscellaneous Cleared 3/30/2022 SERGIO SILVA
Miscellaneous Cleared 3/30/2022 SERGIO SILVA

Contact Information

Architect Radziner,, Ronald Mark; Lic. No.: C22228 MARMOL RADZINER & ASSOCIATES   12210 NEBRASKA AVE    LOS ANGELES, CA 90025
Contractor Marmol Radziner An Architectural Corporation; Lic. No.: 734381-B 12210 NEBRASKA AVENUE      LOS ANGELES, CA 90025
Engineer Baad,, Katherine Firestone; Lic. No.: C64669 5232 ZAKON RD      TORRANCE, CA 90505
Engineer Guzman,, Martin; Lic. No.: C79193 4054 W 165TH STREET      LAWNDALE, CA 90260
Engineer Hennon,, Robert D; Lic. No.: L5573 601 E GLENOAKS BLVD 208      GLENDALE, CA 91207
Engineer Hollingsworth,, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Geologist Hollingsworth,, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

KEVIN SARGSYAN, (310) 914-3889 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 5/25/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 6/13/2022 Corrections Issued JUAN VALENZUELA
Footing/Foundation/Slab 6/13/2022 Partial Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 6/21/2022 Partial Approval JUAN VALENZUELA
Footing/Foundation/Slab 6/21/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 7/12/2022 Partial Approval JUAN VALENZUELA
Reinforced Concrete Frame 7/12/2022 Partial Approval JUAN VALENZUELA
Deputy Grading 7/22/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 8/2/2022 Partial Inspection ANDREW NAVE
Footing/Foundation/Slab 8/2/2022 Partial Inspection ANDREW NAVE
Excavation/Setback/Form/Re-Bar 8/16/2022 Partial Approval JUAN VALENZUELA
Footing/Foundation/Slab 8/16/2022 Partial Approval JUAN VALENZUELA
Deputy Grading 8/22/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 8/26/2022 Not Ready for Inspection JUAN VALENZUELA
Footing/Foundation/Slab 8/26/2022 Not Ready for Inspection JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 8/31/2022 Partial Approval JUAN VALENZUELA
Footing/Foundation/Slab 9/9/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 9/23/2022 Partial Approval JUAN VALENZUELA
Piling/Pier/Caisson 9/23/2022 Partial Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 10/14/2022 Partial Approval JUAN VALENZUELA
Piling/Pier/Caisson 10/14/2022 Partial Approval JUAN VALENZUELA
Piling/Pier/Caisson 10/20/2022 Partial Approval JUAN VALENZUELA
PLUMBING-Rough 10/31/2022 Partial Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 12/5/2022 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 12/5/2022 Not Ready for Inspection CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 12/7/2022 Partial Approval CHRISTOPHER WILSON
Deputy Steel/Welding 12/29/2022 Conditional Approval MICHAEL PELHAM
Deputy Reinf. Concrete 12/30/2022 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 1/5/2023 Conditional Approval BRENDAN LOONEY
FLOOD-Proofing Certificate 1/5/2023 Approved BRENDAN LOONEY
Green Building Rough 1/5/2023 Not Ready for Inspection BRENDAN LOONEY
Structural Steel Frame 1/5/2023 Partial Approval BRENDAN LOONEY
Verify Sprinkler Sign Off 1/5/2023 Not Ready for Inspection BRENDAN LOONEY
Excavation/Setback/Form/Re-Bar 1/30/2023 Corrections Issued STEPHANIE SWANSON
PLUMBING-Rough 1/30/2023 Corrections Issued STEPHANIE SWANSON
Deputy Steel/Welding 2/1/2023 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 2/2/2023 Conditional Approval MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 2/7/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 2/7/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 2/21/2023 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 3/3/2023 Conditional Approval MICHAEL PELHAM
Deputy Steel/Welding 3/6/2023 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/6/2023 Approved KEVIN SARGSYAN
Structural Steel Frame 3/6/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 4/6/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 4/20/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 4/20/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/4/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 5/15/2023 Partial Approval KEVIN SARGSYAN
Shower Pan 5/15/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 5/25/2023 Corrections Issued KEVIN SARGSYAN
Deputy Wood Construction 5/31/2023 Conditional Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 6/1/2023 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 6/1/2023 Partial Approval KEVIN SARGSYAN
HVAC-Rough 6/1/2023 Corrections Issued KEVIN SARGSYAN
Interior/Exterior Lathing 6/1/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 6/1/2023 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 6/7/2023 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 6/7/2023 Corrections Issued KEVIN SARGSYAN
Verify Sprinkler Sign Off 6/7/2023 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 6/12/2023 Not Ready for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 6/12/2023 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 6/14/2023 No Access for Inspection KENNETH NAGLE
ELECTRICAL-Rough 6/29/2023 Corrections Issued HERBERT GIRON
Excavation/Setback/Form/Re-Bar 6/29/2023 Partial Approval HERBERT GIRON
Insulation 6/29/2023 Partial Approval HERBERT GIRON
Deputy Wood Construction 7/6/2023 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 7/6/2023 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 7/12/2023 Partial Approval KEVIN SARGSYAN
HVAC-Rough 7/12/2023 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 7/13/2023 Not Ready for Inspection KEVIN SARGSYAN
Green Building Rough 7/13/2023 Not Ready for Inspection KEVIN SARGSYAN
Verify Sprinkler Sign Off 7/13/2023 Not Ready for Inspection KEVIN SARGSYAN
Deputy Wood Construction 7/17/2023 Conditional Approval KEVIN SARGSYAN
Gas Test 7/18/2023 Partial Approval KEVIN SARGSYAN
Underground Mechanical 7/18/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 7/20/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 7/28/2023 Partial Approval KEVIN SARGSYAN
Insulation 7/28/2023 Partial Approval KEVIN SARGSYAN
Deputy Wood Construction 8/31/2023 Approved KEVIN SARGSYAN
Wood Frame 8/31/2023 Partial Inspection KEVIN SARGSYAN
BUILDING-Rough-Frame 9/18/2023 Not Ready for Inspection KEVIN SARGSYAN
Green Building Rough 9/18/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 9/18/2023 Corrections Issued KEVIN SARGSYAN
Verify Sprinkler Sign Off 9/18/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 9/26/2023 Not Ready for Inspection KEVIN SARGSYAN
Wood Frame 9/26/2023 Not Ready for Inspection KEVIN SARGSYAN
Insulation 9/29/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 9/29/2023 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 10/16/2023 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 10/30/2023 Partial Approval ARAM AVEDISIAN
Green Building Rough 10/30/2023 Not Ready for Inspection ARAM AVEDISIAN
Insulation 10/30/2023 Partial Approval ARAM AVEDISIAN
Verify Sprinkler Sign Off 10/30/2023 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 10/31/2023 Not Ready for Inspection ARAM AVEDISIAN
BUILDING-Rough-Frame 11/3/2023 Not Ready for Inspection KEVIN SARGSYAN
Green Building Rough 11/3/2023 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 11/3/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 11/3/2023 Corrections Issued KEVIN SARGSYAN
Verify Sprinkler Sign Off 11/3/2023 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 11/15/2023 Partial Approval KEVIN SARGSYAN
ELECTRICAL-Rough 11/15/2023 Approved KEVIN SARGSYAN
Green Building Rough 11/15/2023 Approved KEVIN SARGSYAN
HVAC-Rough 11/15/2023 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 11/15/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 11/15/2023 Approved KEVIN SARGSYAN
Insulation 11/20/2023 Approved KEVIN SARGSYAN
Drywall Nailing 12/15/2023 Partial Approval STEPHANIE SWANSON
Drywall Nailing 1/10/2024 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 2/16/2024 Approved KEVIN SARGSYAN
Gas Test 8/28/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 9/4/2024 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 9/4/2024 Corrections Issued KEVIN SARGSYAN
Smoke Detectors 9/4/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 9/6/2024 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 9/6/2024 Approved KEVIN SARGSYAN
ELECTRICAL-Final 9/9/2024 Approved KEVIN SARGSYAN
HVAC-Final 9/9/2024 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 9/24/2024 Approved KEVIN SARGSYAN
Final 9/24/2024 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 9/24/2024 Approved KEVIN SARGSYAN
Green Building Final 9/24/2024 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 9/24/2024 SGSOV Approved KEVIN SARGSYAN
Structural Steel Frame 9/24/2024 Approved KEVIN SARGSYAN
Final 9/26/2024 OK to Issue CofO JESUS RODRIGUEZ