PLUMBING-Rough
|
7/19/2022
|
Partial Approval
|
EVAN COOPER
|
|
Deputy Drilled-In Anchors
|
8/1/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
8/4/2022
|
Partial Approval
|
PATRICK QUALEY
|
|
Deputy Reinf. Concrete
|
8/9/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Footing/Foundation/Slab
|
9/13/2022
|
Partial Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
9/19/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
9/21/2022
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Steel/Welding
|
11/30/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Steel/Welding
|
12/19/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Deputy Reinf. Concrete
|
12/27/2022
|
Conditional Approval
|
GERMAN RODRIGUEZ MENDOZA
|
|
Pre-Inspection
|
9/21/2023
|
Partial Inspection
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
10/2/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
HVAC-Rough
|
10/3/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
10/4/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Steel/Welding
|
10/5/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Gas Test
|
10/6/2023
|
Partial Inspection
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
10/6/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
BUILDING-Rough-Frame
|
10/11/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Green Building Rough
|
10/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Verify Sprinkler Sign Off
|
10/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Gas Test
|
10/16/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
HVAC-Rough
|
10/18/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
10/19/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Green Building Rough
|
10/20/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Wood Frame
|
10/20/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Insulation
|
10/25/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
11/6/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Green Building Rough
|
11/6/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Insulation
|
11/6/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
11/17/2023
|
Corrections Issued
|
STEPHANIE SWANSON
|
|
Shower Pan
|
11/17/2023
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Insulation
|
11/28/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
11/28/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
11/29/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Deputy Drilled-In Anchors
|
11/30/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
ELECTRICAL-Final
|
11/30/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
12/4/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Wood Construction
|
12/5/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Structural Steel Frame
|
12/6/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Wood Frame
|
12/6/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Structural Steel Frame
|
12/11/2023
|
Corrections Issued
|
BRENDAN LOONEY
|
|
Wood Frame
|
12/11/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Insulation
|
12/15/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
PLUMBING-Rough
|
12/22/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Shower Pan
|
12/22/2023
|
Partial Approval
|
BRENDAN LOONEY
|
|
Wood Frame
|
12/22/2023
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/27/2023
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Deputy Wood Construction
|
12/29/2023
|
Conditional Approval
|
MICHAEL PELHAM
|
|
HVAC-Rough
|
1/4/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
ELECTRICAL-Rough
|
1/8/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
HVAC-Rough
|
1/8/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Insulation
|
1/8/2024
|
Conditional Approval
|
STEPHANIE SWANSON
|
|
Wood Frame
|
1/10/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Insulation
|
1/18/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Deputy Wood Construction
|
1/22/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/30/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Drywall Nailing
|
2/7/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Green Building Rough
|
2/7/2024
|
Partial Approval
|
BRENDAN LOONEY
|
|
Insulation
|
2/7/2024
|
Not Ready for Inspection
|
BRENDAN LOONEY
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/9/2024
|
Conditional Approval
|
BRENDAN LOONEY
|
|
Insulation
|
2/9/2024
|
Approved
|
BRENDAN LOONEY
|
|
Shower Pan
|
2/26/2024
|
Approved
|
SEAN HAUPT
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/14/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
3/28/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
3/28/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
4/4/2024
|
Partial Approval
|
STEPHANIE SWANSON
|
|
PLUMBING-Rough
|
4/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
4/22/2024
|
Approved
|
SEAN HAUPT
|
|
HVAC-Rough
|
4/23/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
4/23/2024
|
Partial Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
4/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
4/26/2024
|
No Access for Inspection
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
4/29/2024
|
Approved
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
5/17/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
5/17/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
5/22/2024
|
Approved
|
SEAN HAUPT
|
|
Insulation
|
5/23/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Drilled-In Anchors
|
6/28/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Drywall Nailing
|
7/2/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Green Building Rough
|
7/2/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Sewer
|
7/2/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Drilled-In Anchors
|
7/11/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Reinf. Masonry
|
7/24/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Deputy Wood Construction
|
7/24/2024
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
BUILDING-Rough-Frame
|
7/31/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
7/31/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Green Building Rough
|
7/31/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Verify Sprinkler Sign Off
|
7/31/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/14/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/14/2024
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
8/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
8/16/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
8/22/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Drilled-In Anchors
|
9/5/2024
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
9/24/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
9/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
9/30/2024
|
Approved
|
SEAN HAUPT
|
|
Underground Mechanical
|
9/30/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
10/2/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Drilled-In Anchors
|
10/10/2024
|
Approved
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2024
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/31/2024
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
10/31/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
11/6/2024
|
Not Ready for Inspection
|
STEPHANIE SWANSON
|
|
Deputy Drilled-In Anchors
|
11/21/2024
|
Approved
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
11/21/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
11/21/2024
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
12/23/2024
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
1/8/2025
|
Not Ready for Inspection
|
STEPHANIE SWANSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/9/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
HVAC-Rough
|
1/15/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Excavation/Setback/Form/Re-Bar
|
1/22/2025
|
Partial Approval
|
EVAN COOPER
|
|
Drywall Nailing
|
2/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Footing/Foundation/Slab
|
2/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Green Building Rough
|
2/4/2025
|
Approved
|
SEAN HAUPT
|
|
Underground Mechanical
|
2/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
2/18/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Masonry Wall/Backfill
|
2/21/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
2/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Special/Order Compliance
|
2/27/2025
|
Partial Inspection
|
BOBBY KEY
|
|
Underground Mechanical
|
2/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
3/5/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Insulation
|
3/5/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
ELECTRICAL-Rough
|
3/14/2025
|
No Access for Inspection
|
SEAN HAUPT
|
|
HVAC-Rough
|
3/14/2025
|
No Access for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
3/17/2025
|
Partial Approval
|
SEAN HAUPT
|
|
HVAC-Rough
|
3/17/2025
|
Partial Approval
|
SEAN HAUPT
|
|
BUILDING-Rough-Frame
|
3/21/2025
|
Partial Approval
|
DANIEL VERA
|
|
ELECTRICAL-Rough
|
3/21/2025
|
Not Ready for Inspection
|
DANIEL VERA
|
|
Green Building Final
|
3/21/2025
|
Not Ready for Inspection
|
DANIEL VERA
|
|
PLUMBING-Rough
|
3/21/2025
|
Not Ready for Inspection
|
DANIEL VERA
|
|
SGSOV-Seismic Gas S/O Valve
|
3/21/2025
|
SGSOV Not Ready
|
DANIEL VERA
|
|
Verify Sprinkler Sign Off
|
3/21/2025
|
Partial Approval
|
DANIEL VERA
|
|
Underground Mechanical
|
3/24/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Insulation
|
3/26/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Concrete
|
3/28/2025
|
Conditional Approval
|
CHRISTOPHER WILSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
4/4/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Drilled-In Anchors
|
4/8/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Deputy Reinf. Concrete
|
4/8/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
BUILDING-Rough-Frame
|
4/25/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Verify Sprinkler Sign Off
|
4/25/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Deputy Reinf. Masonry
|
4/28/2025
|
Conditional Approval
|
MICHAEL PELHAM
|
|
Excavation/Setback/Form/Re-Bar
|
5/6/2025
|
Partial Approval
|
SEAN HAUPT
|
|
PLUMBING-Rough
|
5/6/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Sewer
|
5/20/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Drywall Nailing
|
5/23/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Shower Pan
|
6/12/2025
|
Not Ready for Inspection
|
MEL KHACHATOURIAN
|
|
ELECTRICAL-Rough
|
6/16/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
Shower Pan
|
6/16/2025
|
Approved
|
SEAN HAUPT
|
|
Special/Order Compliance
|
6/16/2025
|
Approved
|
SEAN HAUPT
|
|
Underground Mechanical
|
6/16/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
7/14/2025
|
Partial Approval
|
STEPHANIE SWANSON
|
|
Underground Mechanical
|
7/30/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Final
|
8/8/2025
|
No Access for Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Final
|
8/13/2025
|
Partial Inspection
|
SEAN HAUPT
|
|
ELECTRICAL-Final
|
8/26/2025
|
Corrections Issued
|
SEAN HAUPT
|
|
Interior/Exterior Lathing
|
8/27/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
8/29/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Gas Test
|
9/2/2025
|
Partial Approval
|
SEAN HAUPT
|
|
ELECTRICAL-Rough
|
10/9/2025
|
Not Ready for Inspection
|
SEAN HAUPT
|
|
Special/Order Compliance
|
10/9/2025
|
Partial Approval
|
GEM DE OCAMPO
|
|
Underground Mechanical
|
10/9/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Underground Mechanical
|
10/24/2025
|
Partial Approval
|
SEAN HAUPT
|
|
Service/Power Release
|
10/27/2025
|
Approved
|
SEAN HAUPT
|
|
Sewer
|
12/15/2025
|
Partial Inspection
|
CARLOS MATAMOROS
|
|
ELECTRICAL-Rough
|
1/8/2026
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
1/8/2026
|
Approved
|
CARLOS MATAMOROS
|
|
Sewer
|
1/14/2026
|
Partial Approval
|
CARLOS MATAMOROS
|
|
Sewer
|
3/10/2026
|
Approved
|
CARLOS MATAMOROS
|
|
Underground Mechanical
|
4/30/2026
|
Partial Approval
|
CARLOS MATAMOROS
|