2215 S WALNUT AVE 90291

Certificate Information: 2215 S WALNUT AVE 90291

Application / Permit
21014-30000-03124
Plan Check / Job No.
B21WL02727
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addition and remodel (E) SFD. Per engineering design.
Permit Issued
Issued on 11/8/2021
Issuing Office
Current Status
CofO Issued on 6/22/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/18/2021 APPLICANT
Assigned to Plan Check Engineer 6/24/2021 ALFREDO JARA
Corrections Issued 6/29/2021 ALFREDO JARA
Applicant returned to address corrections 8/10/2021 SERGIO SILVA
Applicant returned to address corrections 9/13/2021 ALFREDO JARA
Applicant returned to address corrections 9/15/2021 ALFREDO JARA
Applicant returned to address corrections 10/19/2021 ALFREDO JARA
Plan Check Approved 11/3/2021 ALFREDO JARA
Issued 11/8/2021 APPLICANT
Building Plans Picked Up 11/15/2021 APPLICANT
CofO in Progress 6/21/2022 DAVID FEILER
Permit Finaled 6/22/2022 DANIEL ORRANTE
CofO Issued 6/22/2022 DANIEL ORRANTE
Permit Finaled 6/22/2022 DANIEL ORRANTE

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 9/2/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 9/3/2021 DINAH GARIN
Specific Plan Cleared 9/10/2021 PEDRO AYALA

Contact Information

Architect Ferri,, John C; Lic. No.: C32037 4591 OPERETTA DRIVE      HUNTINGTON BEACH, CA 92649
Contractor Specon Corporation; Lic. No.: 938424-B 17011 BEACH BOULEVARD STE 900      HUNTINGTON BEACH, CA 92647
Engineer Posadas,, John Garcia; Lic. No.: C30786 2063 PASEO LUCINDA      SAN DIMAS, CA 91773

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/24/2021 No Access for Inspection DAVID FEILER
Footing/Foundation/Slab 12/1/2021 Approved RICHARD STEINBACH
Floor/Roof Diaphrgm/Shear Wall 12/10/2021 Partial Approval KRISTEN CAUSEY
BUILDING-Rough-Frame 1/3/2022 Corrections Issued JUAN VALENZUELA
Green Building Rough 1/3/2022 Not Ready for Inspection JUAN VALENZUELA
Deputy Wood Construction 1/5/2022 Approved EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 1/5/2022 Partial Approval EVAN COOPER
PLUMBING-Rough 1/11/2022 Partial Approval DAVID FEILER
BUILDING-Rough-Frame 3/17/2022 Approved DAVID FEILER
Green Building Rough 3/17/2022 Approved DAVID FEILER
Rough-Elec/Plmb/HVAC 3/17/2022 Approved DAVID FEILER
Insulation 3/23/2022 Approved RYAN SALAZAR
Interior/Exterior Lathing 3/23/2022 Approved RYAN SALAZAR
Drywall Nailing 4/4/2022 Approved STEPHANIE SWANSON
Final 4/4/2022 Corrections Issued STEPHANIE SWANSON
Shower Pan 4/11/2022 Approved DAVID FEILER
PLUMBING-Rough 4/18/2022 Approved DAVID FEILER
Interior/Exterior Lathing 4/28/2022 Approved JESUS RODRIGUEZ
Final 6/9/2022 Corrections Issued JESUS RODRIGUEZ
Green Building Final 6/9/2022 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 6/9/2022 SGSOV Not Ready JESUS RODRIGUEZ
Smoke Detectors 6/9/2022 Approved JESUS RODRIGUEZ
Final 6/21/2022 OK to Issue CofO DAVID FEILER
SGSOV-Seismic Gas S/O Valve 6/21/2022 SGSOV Approved DAVID FEILER