12621 W ROSE AVE 90066

Certificate Information: 12621 W ROSE AVE 90066

Application / Permit
21014-30000-02130
Plan Check / Job No.
B21WL01850
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel and addition to (E) SFD. Per engineering design.
Permit Issued
Issued on 9/17/2021
Issuing Office
Current Status
CofO Issued on 6/17/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/28/2021 APPLICANT
Assigned to Plan Check Engineer 4/29/2021 ALFREDO JARA
Corrections Issued 5/4/2021 ALFREDO JARA
Applicant returned to address corrections 6/22/2021 ALFREDO JARA
Plan Check Approved 7/7/2021 ALFREDO JARA
Issued 9/17/2021 APPLICANT
CofO in Progress 6/14/2025 DAVID FEILER
Permit Finaled 6/17/2025 RICHARD STEINBACH
CofO Issued 6/17/2025 RICHARD STEINBACH
Permit Finaled 6/17/2025 RICHARD STEINBACH

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 5/21/2021 DINAH GARIN
Eng Process Fee Ord 176,300 Cleared 5/25/2021 DINAH GARIN
GPI Written Notices Cleared 7/7/2021 ALFREDO JARA
Grading Pre-Inspection Cleared 7/7/2021 ALFREDO JARA

Contact Information

Contractor Mcla Construction Co; Lic. No.: 1020949-B 11209 NATIONAL BLVD STE 408      LOS ANGELES, CA 90064
Engineer Messiha,, Hany Gamil; Lic. No.: C56766 19648 MULBERRY DR      WALNUT, CA 91789

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/4/2021 Approved RICHARD STEINBACH
Deputy Reinf. Concrete 10/6/2021 Approved ENRIQUE MIRELES
Gas Test 10/25/2021 Partial Approval KRISTEN CAUSEY
PLUMBING-Rough 10/25/2021 Not Ready for Inspection KRISTEN CAUSEY
Underground Mechanical 10/25/2021 Approved KRISTEN CAUSEY
BUILDING-Rough-Frame 11/17/2021 Not Ready for Inspection ENRIQUE MIRELES
Floor/Roof Diaphrgm/Shear Wall 11/17/2021 Approved ENRIQUE MIRELES
Green Building Rough 11/17/2021 Not Ready for Inspection ENRIQUE MIRELES
Deputy Drilled-In Anchors 12/22/2021 Approved JOHN KAYON
ELECTRICAL-Rough 12/28/2021 Approved BOBBY KEY
HVAC-Rough 12/28/2021 Corrections Issued BOBBY KEY
PLUMBING-Rough 12/28/2021 Corrections Issued BOBBY KEY
HVAC-Rough 12/29/2021 Approved BOBBY KEY
PLUMBING-Rough 12/29/2021 Approved BOBBY KEY
BUILDING-Rough-Frame 1/3/2022 Partial Approval EVAN COOPER
Green Building Rough 1/3/2022 Not Ready for Inspection EVAN COOPER
Wood Frame 1/3/2022 Partial Approval EVAN COOPER
Insulation 1/7/2022 No Access for Inspection DAVID FEILER
Interior/Exterior Lathing 1/7/2022 Not Ready for Inspection DAVID FEILER
Shower Pan 1/7/2022 No Access for Inspection DAVID FEILER
BUILDING-Rough-Frame 1/10/2022 Not Ready for Inspection ENRIQUE MIRELES
Green Building Rough 1/10/2022 Approved ENRIQUE MIRELES
Insulation 1/10/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 1/10/2022 Approved ENRIQUE MIRELES
Shower Pan 1/10/2022 Approved ENRIQUE MIRELES
Drywall Nailing 1/19/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 1/19/2022 Approved ENRIQUE MIRELES
Interior/Exterior Lathing 2/28/2022 Corrections Issued STEPHANIE SWANSON
Reinforced Concrete Frame 3/2/2022 Approved ENRIQUE MIRELES
BUILDING-Rough-Frame 9/8/2022 Approved JESUS RODRIGUEZ
Final 9/8/2022 Corrections Issued JESUS RODRIGUEZ
Green Building Final 9/8/2022 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 9/8/2022 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 9/8/2022 SGSOV Approved JESUS RODRIGUEZ
Smoke Detectors 9/8/2022 Approved JESUS RODRIGUEZ
Final 6/14/2025 OK to Issue CofO DAVID FEILER