1659 N MICHELTORENA ST 90026

Certificate Information: 1659 N MICHELTORENA ST 90026

Application / Permit
21014-20000-06176
Plan Check / Job No.
B21VN17196
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
IRR. SHAPED 19'-10" x 21'-1" ADDITION TO THE 2ND FLR OF (E) SINGLE FAMILY DWELLING, ADD NEW BALCONY AT 2ND FLR, AND INTERIOR REMODEL; ALL WORK PER ENGINEERING DESIGN
Permit Issued
Issued on 5/25/2022
Issuing Office
Metro
Current Status
CofO Issued on 12/5/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/15/2021 APPLICANT
Assigned to Plan Check Engineer 12/29/2021 SEAN SHAHMIRI
Corrections Issued 1/3/2022 SEAN SHAHMIRI
Quality Review Completed 1/4/2022 OMID HEDAYAT
Building Plans Picked Up 1/5/2022 APPLICANT
Plan Check Approved 2/14/2022 SEAN SHAHMIRI
Issued 5/25/2022 APPLICANT
CofO in Progress 11/22/2024 HAMIK HARTOUNIAN
Permit Finaled 12/5/2024 DEROLD HAUFF
CofO Issued 12/5/2024 DEROLD HAUFF
Permit Finaled 12/5/2024 DEROLD HAUFF

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 1/7/2022 CINDY QI
Eng Process Fee Ord 176,300 Cleared 1/10/2022 CINDY QI
Grading Pre-Inspection Cleared 2/14/2022 SEAN SHAHMIRI
Office of Finance Referral Cleared 5/25/2022 CAROLINA GUARDADO

Contact Information

Contractor Darwish David; Lic. No.: 844644-B 20929 VENTURA BLVD 348      WOODLAND HILLS, CA 91364
Engineer Zohrevand,, Pedram; Lic. No.: C82328 19562 VENTURA BLVD UNIT 238      TARZANA, CA 91356

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/13/2023 Conditional Approval THOMAS LOGRASSO
Deputy Wood Construction 1/13/2023 Conditional Approval THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 4/14/2023 Corrections Issued ALIZAH MAYAGOITIA
Footing/Foundation/Slab 4/27/2023 Corrections Issued STUART CHAPMAN
Wood Frame 4/27/2023 Not Ready for Inspection STUART CHAPMAN
Footing/Foundation/Slab 6/27/2023 Not Ready for Inspection THOMAS LOGRASSO
Excavation/Setback/Form/Re-Bar 7/5/2023 Approved THOMAS LOGRASSO
Footing/Foundation/Slab 7/5/2023 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 8/9/2023 Not Ready for Inspection THOMAS LOGRASSO
Green Building Rough 8/9/2023 Not Ready for Inspection THOMAS LOGRASSO
PLUMBING-Final 8/9/2023 Not Ready for Inspection THOMAS LOGRASSO
PLUMBING-Rough 8/9/2023 Not Ready for Inspection THOMAS LOGRASSO
Pre-Inspection 8/9/2023 Not Ready for Inspection THOMAS LOGRASSO
ELECTRICAL-Rough 8/16/2023 Corrections Issued THOMAS LOGRASSO
HVAC-Rough 8/16/2023 Corrections Issued THOMAS LOGRASSO
PLUMBING-Rough 8/16/2023 Approved THOMAS LOGRASSO
ELECTRICAL-Rough 8/21/2023 Approved ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 8/21/2023 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 9/5/2023 Not Ready for Inspection THOMAS LOGRASSO
Green Building Rough 9/5/2023 Not Ready for Inspection THOMAS LOGRASSO
Interior/Exterior Lathing 9/5/2023 Not Ready for Inspection THOMAS LOGRASSO
BUILDING-Rough-Frame 10/31/2023 Corrections Issued THOMAS LOGRASSO
BUILDING-Rough-Frame 12/5/2023 Not Ready for Inspection THOMAS LOGRASSO
BUILDING-Rough-Frame 12/18/2023 Approved THOMAS LOGRASSO
Green Building Rough 12/18/2023 Approved THOMAS LOGRASSO
Insulation 12/18/2023 Approved THOMAS LOGRASSO
Interior/Exterior Lathing 12/18/2023 Partial Approval THOMAS LOGRASSO
Drywall Nailing 2/2/2024 Approved BRENDAN MORELLI
Interior/Exterior Lathing 2/13/2024 Approved THOMAS LOGRASSO
Final 8/26/2024 Corrections Issued ROY SPAULDING
Green Building Final 8/26/2024 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 8/26/2024 SGSOV Not Ready ROY SPAULDING
Smoke Detectors 8/26/2024 Not Ready for Inspection ROY SPAULDING
Final 9/18/2024 Not Ready for Inspection LUIS CASTRO
Green Building Final 9/18/2024 Approved LUIS CASTRO
SGSOV-Seismic Gas S/O Valve 9/18/2024 SGSOV Approved LUIS CASTRO
Smoke Detectors 9/18/2024 Not Ready for Inspection LUIS CASTRO
Pre-Inspection 9/25/2024 Corrections Issued HAMIK HARTOUNIAN
Final 11/18/2024 Not Ready for Inspection HAMIK HARTOUNIAN
Service/Power Release 11/18/2024 Not Ready for Inspection HAMIK HARTOUNIAN
Smoke Detectors 11/18/2024 Corrections Issued HAMIK HARTOUNIAN
Final 11/22/2024 OK to Issue CofO HAMIK HARTOUNIAN
Service/Power Release 11/22/2024 Approved HAMIK HARTOUNIAN
Smoke Detectors 11/22/2024 Approved HAMIK HARTOUNIAN