3132 N PUEBLO AVE 90032

Certificate Information: 3132 N PUEBLO AVE 90032

Application / Permit
21014-20000-05327
Plan Check / Job No.
B21VN14525
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
37'-8" X 12'-4" ADDITION TO THE SIDE OF THE (E) SFD. INTERIOR REMODEL.
Permit Issued
Issued on 9/14/2022
Issuing Office
Valley
Current Status
CofO Issued on 4/18/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/26/2021 APPLICANT
Assigned to Plan Check Engineer 11/4/2021 LUISANGEL VALENZUELA
Corrections Issued 11/5/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 2/3/2022 LUISANGEL VALENZUELA
Applicant returned to address corrections 2/23/2022 LUISANGEL VALENZUELA
Building Plans Picked Up 3/31/2022 APPLICANT
Plan Check Approved 9/14/2022 SERGIO MUNIZ
Issued 9/14/2022 APPLICANT
CofO in Progress 4/18/2024 LILIANA PORTILLO
Permit Finaled 4/18/2024 DEROLD HAUFF
CofO Issued 4/18/2024 DEROLD HAUFF
Permit Finaled 4/18/2024 DEROLD HAUFF

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/15/2021 CINDY QI
Sewer availability Cleared 11/15/2021 CINDY QI
"Q" conditions Cleared 1/27/2022 JASON CHAN
Roof/Waste drainage to street Cleared 2/14/2022 CINDY QI
Grading Pre-Inspection Cleared 3/2/2022 VASIL MIHALEV
ZI Cleared 3/3/2022 KENTON TRINH
Disturb/Remove Protected Trees Cleared 9/13/2022 ADALBERTO VERA

Contact Information

Contractor Az Vision Remodeling; Lic. No.: 1015050-B 11909 TIARA ST      VALLEY VILLAGE, CA 91607
Engineer Standley,, Craig Erick; Lic. No.: C87675 60 VIA CARATAMA      SAN CLEMENTE, CA 92673

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/21/2022 Conditional Approval AMY COLIN
Excavation/Setback/Form/Re-Bar 11/30/2022 Partial Approval AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 12/9/2022 Approved AMY COLIN
Footing/Foundation/Slab 12/9/2022 Approved AMY COLIN
PLUMBING-Rough 12/9/2022 Partial Approval AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 12/15/2022 Partial Approval AMY COLIN
Insulation 12/15/2022 Partial Approval AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 2/8/2023 Partial Inspection RUBEN SALAS
BUILDING-Rough-Frame 2/21/2023 Approved AMY COLIN
ELECTRICAL-Rough 2/21/2023 Approved AMY COLIN
Floor/Roof Diaphrgm/Shear Wall 2/21/2023 Approved AMY COLIN
Green Building Rough 2/21/2023 Not Ready for Inspection AMY COLIN
PLUMBING-Rough 2/21/2023 Corrections Issued AMY COLIN
Wood Frame 2/21/2023 Approved AMY COLIN
HVAC-Rough 2/24/2023 Not Ready for Inspection AMY COLIN
Interior/Exterior Lathing 2/24/2023 Partial Approval AMY COLIN
PLUMBING-Rough 2/24/2023 Not Ready for Inspection AMY COLIN
Gas Test 3/1/2023 Partial Inspection AMY COLIN
HVAC-Rough 3/1/2023 Approved AMY COLIN
Interior/Exterior Lathing 3/1/2023 Approved AMY COLIN
PLUMBING-Rough 3/1/2023 Approved AMY COLIN
Shower Pan 3/1/2023 Approved AMY COLIN
BUILDING-Rough-Frame 3/7/2023 Approved AMY COLIN
Green Building Rough 3/7/2023 Approved AMY COLIN
Insulation 3/7/2023 Approved AMY COLIN
Drywall Nailing 3/13/2023 No Access for Inspection AMY COLIN
Drywall Nailing 3/14/2023 Approved AMY COLIN
ELECTRICAL-Final 3/11/2024 Not Ready for Inspection LILIANA PORTILLO
Final 3/11/2024 Corrections Issued LILIANA PORTILLO
Green Building Final 3/11/2024 Not Ready for Inspection LILIANA PORTILLO
HVAC-Final 3/11/2024 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Final 3/11/2024 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 3/11/2024 SGSOV Approved LILIANA PORTILLO
Smoke Detectors 3/11/2024 Approved LILIANA PORTILLO
ELECTRICAL-Final 4/17/2024 Approved LILIANA PORTILLO
Final 4/17/2024 OK to Issue CofO LILIANA PORTILLO
Green Building Final 4/17/2024 Approved LILIANA PORTILLO
HVAC-Final 4/17/2024 Approved LILIANA PORTILLO
PLUMBING-Final 4/17/2024 Approved LILIANA PORTILLO