9219 W SAWYER ST 90035

Certificate Information: 9219 W SAWYER ST 90035

Application / Permit
21014-20000-05008
Plan Check / Job No.
B21VN13475
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE ALL EXTERIOR AND INTERIOR WALLS OF AN EXISTING ONE STORY SINGLE FAMILY DWELLING EXCEPT FOR 1' LF AT WEST SIDE AND BUILD AN IRREGULAR SHAPED 60'5" X 45'-1" TWO STORY SINGLE FAMILY DWELLING WITH AN ATTACHED TWO CAR GARAGE, BASEMENT, NFPA-13D FIRE SPRINKLERS THROUGHOUT REQUIRED, ALL WORK PER ENGINEERING SEE COMMENTS
Permit Issued
Issued on 6/6/2022
Issuing Office
Current Status
CofO Issued on 6/24/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 10/5/2021 APPLICANT
Assigned to Plan Check Engineer 10/28/2021 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 11/12/2021 SEWADA ZADOORIAN MILAGARDI
Quality Review Completed 11/19/2021 OMID HEDAYAT
Building Plans Picked Up 11/22/2021 APPLICANT
Applicant returned to address corrections 12/13/2021 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 2/14/2022 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 2/16/2022 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 4/5/2022 SEWADA ZADOORIAN MILAGARDI
Applicant returned to address corrections 5/13/2022 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 5/23/2022 SEWADA ZADOORAN MILAGARDI
Issued 6/6/2022 APPLICANT
CofO in Progress 6/24/2024 MEL KHACHATOURIAN
Permit Finaled 6/24/2024 DANIEL ORRANTE
CofO Issued 6/24/2024 DANIEL ORRANTE
Permit Finaled 6/24/2024 DANIEL ORRANTE

Permit Application Clearance Information

Miscellaneous Cleared 12/3/2021 STEVEN WECHSLER
Low Impact Development Cleared 1/28/2022 SARAH YOUSSEF
Trees in Parkway Cleared 2/8/2022 ADALBERTO VERA
Eng Process Fee Ord 176,300 Cleared 2/15/2022 HISASHI KOBAYAKAWA
Permit Cleared 2/15/2022 HISASHI KOBAYAKAWA
Sewer availability Cleared 2/15/2022 HISASHI KOBAYAKAWA
Roof/Waste drainage to street Cleared 3/15/2022 HISASHI KOBAYAKAWA
GPI Written Notices Cleared 4/5/2022 SEWADA ZADOORAN MILAGARDI
Grading Pre-Inspection Cleared 4/5/2022 SEWADA ZADOORAN MILAGARDI

Contact Information

Contractor Inhance Construction Inc; Lic. No.: 1073871-B 7257 BEVERLY RD STE 205      LOS ANGELES, CA 90036
Engineer Haro,, Ruben; Lic. No.: GE2990 555 N LANTANA ST STE 492      CAMARILLO, CA 93010
Engineer Moeini,, Soheil; Lic. No.: C84000 11022 SANTA MONICA BLVD STE 440      LOS ANGELES, CA 90025

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/26/2022 Corrections Issued STEPHANIE SWANSON
Pre-Inspection 8/22/2022 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 10/12/2022 Partial Approval OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 12/1/2022 Partial Approval EVAN COOPER
Excavation/Setback/Form/Re-Bar 12/16/2022 Partial Approval OGANES TARAKHCHYAN
Footing/Foundation/Slab 2/2/2023 Corrections Issued ASHLEY THOMPSON
METHANE-Barrier 2/2/2023 Not Ready for Inspection ASHLEY THOMPSON
METHANE-Subgrade 2/2/2023 Not Ready for Inspection ASHLEY THOMPSON
Floor/Roof Diaphrgm/Shear Wall 3/21/2023 Corrections Issued ASHLEY THOMPSON
Deputy Wood Construction 4/6/2023 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 4/10/2023 Corrections Issued ASHLEY THOMPSON
Deputy Reinf. Concrete 4/18/2023 Conditional Approval MICHAEL PELHAM
Deputy Wood Construction 5/12/2023 Conditional Approval CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/16/2023 Partial Approval CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/17/2023 Corrections Issued CLAYTON GRAHAM
Floor/Roof Diaphrgm/Shear Wall 5/19/2023 Approved JEREMY TODD
Footing/Foundation/Slab 5/19/2023 Approved JEREMY TODD
Green Building Rough 5/19/2023 Not Ready for Inspection JEREMY TODD
METHANE-Barrier 5/19/2023 Approved JEREMY TODD
METHANE-Rough 5/19/2023 Approved JEREMY TODD
METHANE-Subgrade 5/19/2023 Approved JEREMY TODD
HVAC-Rough 8/2/2023 Corrections Issued ARAM AVEDISIAN
PLUMBING-Rough 8/2/2023 Corrections Issued ARAM AVEDISIAN
ELECTRICAL-Rough 8/9/2023 Approved ARAM AVEDISIAN
PLUMBING-Rough 8/9/2023 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 8/14/2023 Partial Approval MEL KHACHATOURIAN
Green Building Rough 8/14/2023 Approved MEL KHACHATOURIAN
Interior/Exterior Lathing 8/22/2023 Approved TEMISTOCLES CAAL
Insulation 8/24/2023 Approved MEL KHACHATOURIAN
Shower Pan 8/30/2023 Corrections Issued CLAYTON GRAHAM
Drywall Nailing 9/5/2023 Not Ready for Inspection BEN MOLSTAD
Drywall Nailing 9/7/2023 Approved CLAYTON GRAHAM
Shower Pan 9/7/2023 Approved CLAYTON GRAHAM
Verify Sprinkler Sign Off 9/7/2023 Approved CLAYTON GRAHAM
Interior/Exterior Lathing 9/18/2023 Approved CARLOS MATAMOROS
HVAC-Final 2/15/2024 Approved OGANES TARAKHCHYAN
ELECTRICAL-Final 2/16/2024 Approved OGANES TARAKHCHYAN
HVAC-Final 2/16/2024 Approved OGANES TARAKHCHYAN
Sewer 2/20/2024 Approved OGANES TARAKHCHYAN
PLUMBING-Final 2/23/2024 Corrections Issued OGANES TARAKHCHYAN
Gas Test 2/26/2024 Approved OGANES TARAKHCHYAN
Pre-Inspection 2/26/2024 Approved OGANES TARAKHCHYAN
Service/Power Release 2/27/2024 Approved KENNETH NAGLE
PLUMBING-Final 3/19/2024 Approved OGANES TARAKHCHYAN
Grading Pre-Inspection 4/12/2024 Not Ready for Inspection OGANES TARAKHCHYAN
BUILDING-Rough-Frame 5/31/2024 Approved MEL KHACHATOURIAN
Drywall Nailing 5/31/2024 Approved MEL KHACHATOURIAN
Final 5/31/2024 OK to Issue CofO MEL KHACHATOURIAN
Green Building Final 5/31/2024 Approved MEL KHACHATOURIAN
SGSOV-Seismic Gas S/O Valve 5/31/2024 SGSOV Approved MEL KHACHATOURIAN
Smoke Detectors 5/31/2024 Approved MEL KHACHATOURIAN