6117 N BEEMAN AVE 91606

Certificate Information: 6117 N BEEMAN AVE 91606

Application / Permit
21014-20000-04430
Plan Check / Job No.
B21VN11827
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EXTERIOR ALTERATION TO REMOVE THE EXISTING PATIO AND ADDITIONS OF 19.08' x 20.25' AND IRREGULAR 8.5' x 20.17' AND INTERIOR REMODEL TO THE SINGLE-FAMILY DWELLING TO CONSIST OF REVISING THE FLOOR PLAN TO ADD A HALF-BATHROOM NEAR THE LAUDRY-ROOM.
Permit Issued
Issued on 12/22/2021
Issuing Office
Current Status
CofO Issued on 11/12/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/31/2021 APPLICANT
Assigned to Plan Check Engineer 9/8/2021 LUIS RINCON
Corrections Issued 9/8/2021 LUIS RINCON
Applicant returned to address corrections 11/30/2021 LUIS RINCON
Applicant returned to address corrections 12/19/2021 LUIS RINCON
Plan Check Approved 12/21/2021 LUIS RINCON
Issued 12/22/2021 APPLICANT
Building Plans Picked Up 12/22/2021 APPLICANT
CofO in Progress 11/2/2022 CHRISTOPHE COCHRAN
CofO Issued 11/12/2022 MICHAEL SMITH
Permit Finaled 11/12/2022 MICHAEL SMITH

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/16/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 11/16/2021 JOSE DUARTE-DIAZ

Contact Information

Contractor Owner-Builder       ,
Engineer Khatchadourian,, Vicken; Lic. No.: S3141 1221 N CEDAR ST      GLENDALE, CA 92107

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/4/2022 Approved CHRISTOPHE COCHRAN
Footing/Foundation/Slab 1/4/2022 Approved CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 1/13/2022 Partial Approval CHRISTOPHE COCHRAN
PLUMBING-Rough 1/13/2022 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 1/19/2022 Partial Approval JACK KARGODORIAN
Floor/Roof Diaphrgm/Shear Wall 2/14/2022 Partial Approval CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 5/13/2022 Partial Approval CHRISTOPHE COCHRAN
ELECTRICAL-Rough 5/13/2022 Approved CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 5/13/2022 Approved CHRISTOPHE COCHRAN
Green Building Rough 5/13/2022 Approved CHRISTOPHE COCHRAN
HVAC-Rough 5/13/2022 Approved CHRISTOPHE COCHRAN
PLUMBING-Rough 5/13/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 5/17/2022 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 5/17/2022 Partial Approval CHRISTOPHE COCHRAN
PLUMBING-Rough 5/17/2022 Approved CHRISTOPHE COCHRAN
Shower Pan 5/17/2022 Approved CHRISTOPHE COCHRAN
Drywall Nailing 5/20/2022 Approved CHRISTOPHE COCHRAN
Final 8/17/2022 Corrections Issued RAFAEL CORTES
Green Building Final 8/17/2022 Not Ready for Inspection RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 8/17/2022 SGSOV Not Ready RAFAEL CORTES
Smoke Detectors 8/17/2022 Approved RAFAEL CORTES
Final 9/8/2022 Not Ready for Inspection RAFAEL CORTES
Green Building Final 9/8/2022 Not Ready for Inspection RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 9/8/2022 SGSOV Not Ready RAFAEL CORTES
Final 9/27/2022 Not Ready for Inspection RAFAEL CORTES
Green Building Final 9/27/2022 Corrections Issued RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 9/27/2022 SGSOV Approved RAFAEL CORTES
Final 10/6/2022 Corrections Issued RAFAEL CORTES
Green Building Final 10/6/2022 Approved RAFAEL CORTES
Final 10/21/2022 Corrections Issued KATHRYN BUTTERWORTH
Final 11/2/2022 OK to Issue CofO CHRISTOPHE COCHRAN